SWISHER CR (0905-17-016)

Items: 41

County: SWISHER
Length: N/A
Highway: CR
District: LUBBOCK
Control Number: 0905-17-016
DBE Goal: N/A
Project: BR 2020(305)
Guaranty: N/A
Time: 165 WORKING DAYS
Engineer's Estimate: $553,374.45
Date: 09/03/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$553,374.45
Over/Under Est: -0.25% -$1,374.45
Over/Under Est: 22.31% $123,431.43
Amt Left: 22.61% $124,805.88
Over/Under Est: 25% $138,338.55
Amt Left: 25.31% $139,713.00
Delta: -2.20% -$14,907.12
Over/Under Est: 33.61% $185,978.55
Amt Left: 33.94% $187,353.00
Delta: -6.89% -$47,640.00
Over/Under Est: 35.23% $194,968.55
Amt Left: 35.57% $196,343.00
Delta: -1.22% -$8,990.00
Over/Under Est: 49.14% $271,936.55
Amt Left: 49.51% $273,311.00
Delta: -10.29% -$76,968.00

Bid Items & Bid Tabulations

41 Total 0 of 41
SWISHER  |  CR  |  LUBBOCK  |  0905-17-016  |  09/03/2020  |  $553,374.45  |  BR 2020(305)  |  BRIDGE REPL  |  165 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLACKSTONE CONCRETE VENTURES, LLC
INTEGRITY SERVICES, LLC
EARTH BUILDERS, L.P.
STATELINE CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 5.000 $3,000.000 $500.000 $1,000.000 $6,000.000 $5,000.000 $3,000.000 $800.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 318.000 $20.000 $20.000 $20.000 $25.000 $25.000 $30.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 299.000 $15.000 $25.000 $15.000 $25.000 $35.000 $30.000 $45.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 455.000 $0.150 $3.000 $1.000 $3.000 $5.000 $3.000 $3.000
PROOF ROLLING
HR 8.000 $100.000 $200.000 $85.000 $120.000 $200.000 $100.000 $200.000
FL BS (CMP IN PLC)(TY E GR 4) (6")
SY 462.000 $11.000 $10.000 $14.850 $50.000 $52.000 $55.000 $35.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 59.000 $3.800 $10.000 $20.000 $35.000 $85.000 $40.000 $30.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 294.000 $115.000 $125.000 $127.250 $120.000 $110.000 $200.000 $215.000
CEM STABIL BKFL
CY 146.000 $150.000 $320.000 $220.000 $250.000 $325.000 $200.000 $205.000
APPROACH SLAB
CY 64.000 $445.000 $480.000 $22.000 $700.000 $850.000 $600.000 $750.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 16.000 $470.000 $350.000 $550.000 $650.000 $550.000 $600.000 $750.000
RIPRAP (MOW STRIP)(4 IN)
CY 12.000 $420.000 $320.000 $500.000 $650.000 $550.000 $550.000 $800.000
RAIL (TY T223)
LF 150.000 $95.000 $185.000 $125.000 $120.000 $125.000 $120.000 $185.000
GABION MATTRESSES (GALV)(12 IN)
SY 28.000 $75.000 $225.000 $350.000 $220.000 $85.000 $400.000 $100.000
GABIONS (3' X 3')(GALV)
CY 45.000 $260.000 $200.000 $300.000 $400.000 $425.000 $400.000 $175.000
GABION (1.5' X 3')(GALV)
CY 10.000 $1,000.000 $215.000 $1,200.000 $400.000 $550.000 $400.000 $175.000
GABION MATTRESSES (GALV) (24 IN)
SY 67.000 $160.000 $250.000 $200.000 $350.000 $165.000 $450.000 $100.000
CONC BOX CULV (10 FT X 6 FT)
LF 176.000 $900.000 $500.000 $1,559.680 $1,000.000 $1,125.000 $900.000 $1,120.000
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $22,000.000 $7,000.000 $18,500.000 $30,000.000 $46,000.000 $50,000.000 $45,000.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $19,000.000 $55,000.000 $8,000.000 $25,000.000 $9,500.000 $25,000.000 $70,000.000
REMOV STR (SMALL FENCE)
LF 1,794.000 $3.500 $5.000 $8.000 $3.000 $4.000 $2.000 $4.000
REMOV STR (PIPE GATE)
LF 48.000 $30.000 $150.000 $17.000 $3.000 $25.000 $500.000 $50.000
MOBILIZATION
LS 1.000 $43,000.000 $58,450.000 $73,338.400 $65,000.000 $60,000.000 $65,000.000 $82,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $5,000.000 $600.000 $1,000.000 $1,400.000 $2,500.000 $2,000.000 $4,800.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 60.000 $60.000 $170.000 $55.000 $50.000 $45.000 $5.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $8.500 $6.000 $12.500 $10.000 $15.000 $1.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 920.000 $2.250 $4.000 $3.000 $3.000 $3.000 $1.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 920.000 $0.600 $2.000 $1.000 $1.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 160.000 $4.000 $10.000 $5.750 $5.000 $8.000 $6.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $1.000 $15.000 $1.990 $1.000 $5.000 $1.000 $5.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $28.000 $100.000 $25.760 $35.000 $26.000 $25.000 $55.000
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,100.000 $5,000.000 $1,635.000 $1,600.000 $1,800.000 $1,250.000 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,750.000 $4,000.000 $3,080.000 $3,400.000 $2,950.000 $3,000.000 $2,550.000
WIRE FENCE (TY A)
LF 1,794.000 $16.000 $15.000 $22.000 $18.000 $12.000 $20.000 $20.000
GATE (TY 1)
EA 3.000 $1,400.000 $100.000 $1,250.000 $1,200.000 $3,500.000 $1,500.000 $1,700.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $600.000 $700.000 $850.000 $650.000 $800.000 $1,000.000 $645.000
REMOVE SM RD SN SUP&AM
EA 2.000 $70.000 $100.000 $250.000 $200.000 $200.000 $500.000 $140.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 8.000 $130.000 $500.000 $85.000 $80.000 $45.000 $80.000 $65.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 8.000 $90.000 $150.000 $85.000 $80.000 $45.000 $80.000 $65.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $40.000 $200.000 $33.600 $35.000 $45.000 $40.000 $25.000
LITTER REMOVAL
CYC 1.000 $1,500.000 $3,000.000 $5,000.000 $650.000 $2,500.000 $1,000.000 $3,500.000
Totals: $553,374.450 $552,000.000 $676,805.880 $691,713.000 $739,353.000 $748,343.000 $825,311.000