SWISHER FM 2301 (0789-04-006)

Items: 55

County: SWISHER
Length: N/A
Highway: FM 2301
District: LUBBOCK
Control Number: 0789-04-006
DBE Goal: N/A
Project: BR 2020(862)
Guaranty: N/A
Time: 178 WORKING DAYS
Engineer's Estimate: $1,624,215.65
Date: 05/08/2020 (6 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$1,624,215.65
$1,543,187.50
Over/Under Est: -4.99% -$81,028.15
Over/Under Est: 6.68% $108,458.35
Amt Left: 12.28% $189,486.50
$2,363,894.00
Over/Under Est: 45.54% $739,678.35
Amt Left: 53.18% $820,706.50
Delta: -36.43% -$631,220.00
$2,641,167.00
Over/Under Est: 62.61% $1,016,951.35
Amt Left: 71.15% $1,097,979.50
Delta: -11.73% -$277,273.00

Bid Items & Bid Tabulations

55 Total 0 of 55
SWISHER  |  FM 2301  |  LUBBOCK  |  0789-04-006  |  05/08/2020  |  $1,624,215.65  |  BR 2020(862)  |  BRIDGE REPL  |  178 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BLACKSTONE CONCRETE VENTURES, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EARTH BUILDERS, L.P.
GILVIN-TERRILL, LTD.
PREPARING ROW
STA 5.600 $1,500.000 $1,000.000 $12,500.000 $15,000.000 $2,800.000
REMOVING CONC (RIPRAP)
SY 1,125.000 $20.000 $10.000 $20.000 $25.000 $40.000
EXCAVATION (ROADWAY)
CY 972.000 $20.000 $5.000 $30.000 $30.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 300.000 $30.000 $5.000 $40.000 $30.000 $70.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 519.800 $30.000 $10.000 $40.000 $30.000 $70.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 2,050.000 $0.200 $3.000 $2.000 $2.000 $1.000
FL BS (CMP IN PLC) (TY D GR 4) (1")
SY 1,375.000 $1.000 $5.000 $15.000 $15.000 $15.000
REWORK BS MTL (TY B) (6") (ORD COMP)
SY 1,375.000 $2.500 $10.000 $15.000 $20.000 $15.000
EMULS ASPH (EROSN CONT)(CSS-1H)
GAL 267.000 $3.300 $10.000 $15.000 $20.000 $10.000
CONC PVMT (CONT REINF - CRCP) (8")
SY 1,480.000 $130.000 $135.000 $135.000 $160.000 $280.000
CONC PVMT (CRCP)(JCT TERMINAL)(8")
SY 74.000 $94.000 $175.000 $200.000 $160.000 $320.000
CEM STABIL BKFL
CY 74.000 $83.500 $550.000 $250.000 $500.000 $450.000
DRILL SHAFT (36 IN)
LF 420.000 $240.000 $200.000 $280.000 $400.000 $255.000
CL C CONC (ABUT)
CY 44.000 $1,700.000 $850.000 $1,200.000 $2,300.000 $2,100.000
CL C CONC (CAP)
CY 37.200 $1,200.000 $750.000 $1,500.000 $2,300.000 $2,200.000
CL C CONC (COLUMN)
CY 11.800 $1,700.000 $1,000.000 $1,500.000 $2,300.000 $1,900.000
REINF CONC SLAB
SF 5,670.000 $22.000 $15.000 $27.000 $38.000 $50.000
APPROACH SLAB
CY 79.000 $630.000 $400.000 $700.000 $1,400.000 $1,750.000
PRESTR CONC GIRDER (TX28)
LF 742.000 $260.000 $250.000 $240.000 $200.000 $180.000
SILICONE RESIN PAINT FINISH
SF 372.500 $6.000 $29.000 $20.000 $20.000 $21.000
RIPRAP (CONC)(5 IN)
CY 282.000 $600.000 $400.000 $600.000 $1,000.000 $526.000
RAIL (TY T223)
LF 302.000 $91.000 $150.000 $140.000 $170.000 $180.000
ARMOR JOINT (SEALED)
LF 82.000 $157.000 $50.000 $80.000 $150.000 $130.000
GABION MATTRESSES (GALV)(18 IN)
SY 571.000 $120.000 $25.000 $140.000 $275.000 $110.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $85,000.000 $100,000.000 $75,000.000 $50,000.000 $250,000.000
REMOV STR (SMALL FENCE)
LF 414.000 $2.700 $10.000 $4.000 $5.000 $6.000
MOBILIZATION
LS 1.000 $139,000.000 $300,000.000 $145,000.000 $230,000.000 $260,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $8,500.000 $500.000 $3,200.000 $2,500.000 $15,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 470.000 $35.000 $25.000 $5.000 $65.000 $35.000
ROCK FILTER DAMS (REMOVE)
LF 470.000 $20.000 $5.000 $1.000 $5.000 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 448.000 $23.000 $10.000 $1.000 $45.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 448.000 $8.000 $1.500 $1.000 $5.000 $20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 600.000 $4.000 $1.500 $1.000 $5.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 600.000 $1.200 $1.000 $1.000 $2.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 265.000 $6.000 $1.000 $8.000 $7.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 265.000 $1.000 $1.000 $1.000 $2.000 $3.000
MTL W-BEAM GD FEN (STEEL POST)
LF 450.000 $30.000 $125.000 $30.000 $35.000 $36.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,900.000 $3,000.000 $1,800.000 $3,000.000 $1,250.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $3.000 $35.000 $3.000 $5.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,150.000 $5,000.000 $3,000.000 $4,200.000 $1,920.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $260.000 $5,000.000 $500.000 $700.000 $175.000
GATE (REMOVE)
EA 2.000 $500.000 $500.000 $200.000 $1,200.000 $2,100.000
WIRE FENCE (TY A)
LF 454.000 $15.000 $20.000 $20.000 $25.000 $15.000
GATE (TY 1)
EA 2.000 $1,300.000 $1,000.000 $1,500.000 $2,000.000 $3,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $640.000 $350.000 $800.000 $1,000.000 $630.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $25.000 $100.000 $50.000 $10.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 8.000 $28.000 $50.000 $50.000 $50.000 $25.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 4.000 $75.000 $100.000 $80.000 $50.000 $145.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 915.000 $0.350 $2.000 $5.000 $4.000 $3.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 915.000 $0.300 $1.000 $5.000 $4.000 $3.500
PAV SURF PREP FOR MRK (4")
LF 1,830.000 $0.750 $2.000 $2.000 $4.000 $1.750
LITTER REMOVAL
CYC 1.000 $5,000.000 $5,000.000 $1,000.000 $1,500.000 $10,000.000
BAT HOUSE (LARGE)
EA 1.000 $4,500.000 $1,500.000 $3,000.000 $1,500.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $19,000.000 $1,000.000 $15,000.000 $15,000.000 $12,000.000
TMA (STATIONARY)
DAY 30.000 $185.000 $10.000 $150.000 $150.000 $500.000
Totals: $1,624,215.650 $1,543,187.500 $1,732,674.000 $2,363,894.000 $2,641,167.000