Job Info for 0302-04-022

County: SWISHER Highway: SH 86 Date: 04/07/2022 (2 years ago) Engineer's Estimate: $2,034,760 Control Number: 0302-04-022
Project: BR 2022(429) District: LUBBOCK Time: 320 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,034,760.10
DIGG COMMERCIAL, LLC   $2,320,028.00 1
14.02% | $285,267.90
EARTH BUILDERS, L.P.   $2,374,217.00 2
16.68% | $339,456.90
2.34% | $54,189.00
BLACKSTONE CONCRETE VENTURES, LLC   $2,700,729.00 3
32.73% | $665,968.90
16.41% | $380,701.00
13.75% | $326,512.00

Bid Items

Items: 74, 0 filtered
SWISHER SH 86  |  LUBBOCK  |  0302-04-022  |  04/07/2022  |  $2,034,760  |  BR 2022(429)  |  BRIDGE REPL  |  320 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DIGG COMMERCIAL, LLC EARTH BUILDERS, L.P. BLACKSTONE CONCRETE VENTURES, LLC
100 6002 PREPARING ROW STA 8.000 $2,000.000 $269.000 $20,000.000 $5,000.000
100 6008 PREPARING ROW (TREE) (0" TO 6" DIA) EA 10.000 $300.000 $260.000 $100.000 $500.000
100 6010 PREPARING ROW (TREE)(10" TO 48" DIA) EA 7.000 $1,200.000 $400.000 $500.000 $800.000
104 6001 REMOVING CONC (PAV) SY 830.000 $20.000 $30.000 $20.000 $15.000
105 6033 REMOVING STB BASE AND ASPH PAV(10-14") SY 2,110.000 $10.000 $9.000 $15.000 $15.000
110 6004 EXCAVATION (ROADWAY AND CHANNEL) CY 1,179.000 $15.000 $20.000 $10.000 $15.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 1,283.000 $15.000 $20.000 $20.000 $10.000
164 6035 DRILL SEEDING (PERM) (RURAL) (CLAY) SY 5,649.000 $0.500 $1.000 $2.000 $5.000
216 6001 PROOF ROLLING HR 10.000 $150.000 $283.000 $100.000 $800.000
314 6013 EMULS ASPH (EROSN CONT)(CSS-1H) GAL 791.000 $10.000 $5.000 $5.000 $9.000
316 6017 ASPH (AC-20-5TR) GAL 924.000 $3.200 $5.000 $10.000 $30.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 21.000 $95.000 $360.000 $250.000 $550.000
360 6002 CONC PVMT (CONT REINF - CRCP) (8") SY 1,522.000 $140.000 $126.000 $120.000 $145.000
360 6075 CONC PVMT (CRCP)(JCT TERMINAL)(8") SY 154.000 $100.000 $170.000 $120.000 $200.000
400 6005 CEM STABIL BKFL CY 362.000 $250.000 $150.000 $300.000 $550.000
402 6001 TRENCH EXCAVATION PROTECTION LF 116.000 $30.000 $1.000 $10.000 $100.000
403 6006 TEMPORARY SPL SHORING (COFFERDAM) SF 3,200.000 $8.000 $6.000 $5.000 $50.000
420 6051 CL C CONC (CULV) CY 253.000 $1,200.000 $5,300.000 $1,500.000 $1,500.000
428 6001 PENETRATING CONCRETE SURFACE TREATMENT SY 547.000 $12.000 $8.000 $25.000 $50.000
432 6002 RIPRAP (CONC)(5 IN) CY 157.000 $600.000 $300.000 $750.000 $750.000
432 6046 RIPRAP (MOW STRIP)(5 IN) CY 146.000 $375.000 $302.000 $750.000 $650.000
438 6005 CLEANING AND SEALING JOINTS LF 1,070.000 $20.000 $9.000 $30.000 $20.000
450 6006 RAIL (TY T223) LF 197.000 $200.000 $100.000 $150.000 $200.000
466 6158 WINGWALL (FW - S) (HW=11 FT) EA 2.000 $50,000.000 $10,000.000 $67,000.000 $55,000.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $2,500.000 $1,000.000 $2,500.000 $1,000.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $30,000.000 $20,000.000 $140,000.000 $180,000.000
496 6043 REMOV STR (SMALL FENCE) LF 1,470.000 $10.000 $5.000 $2.000 $5.000
500 6001 MOBILIZATION LS 1.000 $185,000.000 $50,000.000 $250,000.000 $180,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 21.000 $3,000.000 $1,500.000 $2,500.000 $1,500.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 188.000 $50.000 $32.000 $30.000 $500.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 188.000 $15.000 $7.000 $10.000 $10.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 400.000 $50.000 $29.000 $30.000 $65.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 400.000 $10.000 $1.000 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,022.000 $5.000 $4.000 $4.000 $9.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 511.000 $1.000 $1.000 $1.000 $2.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 1,788.000 $10.000 $5.000 $8.000 $9.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 894.000 $1.000 $1.000 $1.000 $2.000
512 6067 PTB (FRN&INSTL)(F SHAPE)(TY 1) OR (STL) LF 810.000 $75.000 $35.000 $80.000 $75.000
512 6069 PTB (MOVE)(F SHAPE)(TY 1) OR (STL) LF 810.000 $10.000 $10.000 $10.000 $25.000
512 6071 PTB (REMOVE)(F SHAPE)(TY 1) OR (STL) LF 810.000 $15.000 $9.000 $20.000 $25.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 800.000 $40.000 $35.000 $40.000 $55.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $3,000.000 $3,363.000 $3,000.000 $5,000.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 650.000 $7.000 $4.000 $5.000 $15.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,200.000 $3,880.000 $3,500.000 $6,000.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $1,500.000 $250.000 $5.000 $5,000.000
545 6003 CRASH CUSH ATTEN (MOVE & RESET) EA 2.000 $1,500.000 $3,000.000 $2,500.000 $2,500.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 2.000 $1,500.000 $1,500.000 $1,000.000 $500.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 2.000 $7,000.000 $7,500.000 $7,500.000 $2,500.000
552 6001 WIRE FENCE (TY A) LF 1,470.000 $15.000 $3.000 $20.000 $47.000
552 6005 GATE (TY 1) EA 2.000 $1,500.000 $2,500.000 $2,500.000 $3,500.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 1.000 $1,000.000 $800.000 $1,000.000 $500.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $865.000 $800.000 $1,000.000 $600.000
644 6076 REMOVE SM RD SN SUP&AM EA 3.000 $100.000 $250.000 $50.000 $100.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 6.000 $50.000 $49.000 $25.000 $250.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 12.000 $40.000 $50.000 $25.000 $125.000
662 6048 WK ZN PAV MRK REMOV (REFL) TY I-C EA 306.000 $3.540 $6.000 $6.000 $10.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 554.000 $3.540 $6.000 $6.000 $5.000
662 6056 WK ZN PAV MRK REMOV (TRAF BTN) TY W EA 918.000 $2.600 $5.000 $4.000 $5.000
662 6058 WK ZN PAV MRK REMOV (TRAF BTN) TY Y EA 1,620.000 $2.600 $4.000 $4.000 $5.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 510.000 $2.500 $5.000 $1.000 $5.000
668 6002 PREFAB PAV MRK TY B (W)(4")(SLD) LF 2,740.000 $5.000 $1.000 $6.000 $1.250
668 6041 PREFAB PAV MRK TY B (Y)(4")(BRK) LF 1,700.000 $5.000 $1.000 $6.000 $2.250
672 6009 REFL PAV MRKR TY II-A-A EA 18.000 $5.000 $10.000 $20.000 $15.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 4,440.000 $0.390 $1.000 $1.500 $1.000
678 6001 PAV SURF PREP FOR MRK (4") LF 4,440.000 $2.000 $1.000 $1.500 $1.000
681 6001 TEMP TRAF SIGNALS EA 4.000 $12,000.000 $1,141.000 $10,000.000 $15,000.000
730 6107 FULL - WIDTH MOWING CYC 2.000 $2,500.000 $2,000.000 $2,000.000 $1,000.000
734 6002 LITTER REMOVAL CYC 2.000 $2,000.000 $2,000.000 $250.000 $2,500.000
3076 6066 TACK COAT GAL 235.000 $5.000 $6.000 $10.000 $10.000
3076 6073 D-GR HMA TY-C PG 70-28 (EXEMPT) TON 436.000 $225.000 $180.000 $200.000 $200.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 1.000 $600.000 $1.000 $1,500.000 $500.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 1,260.000 $75.000 $1.000 $25.000 $10.000
6185 6002 TMA (STATIONARY) DAY 640.000 $150.000 $1.000 $25.000 $10.000
6185 6005 TMA (MOBILE OPERATION) DAY 15.000 $108.000 $250.000 $500.000 $50.000
Totals: $2,034,760.10 $2,320,028.00 $2,374,217.00 $2,700,729.00