STONEWALL US 380 (0106-04-036)

Items: 82

County: STONEWALL
Length: N/A
Highway: US 380
District: ABILENE
Control Number: 0106-04-036
DBE Goal: N/A
Project: BR 2022(829)
Guaranty: N/A
Time: 506 WORKING DAYS
Engineer's Estimate: $16,680,276.70
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$16,680,276.70
$14,662,526.00
Over/Under Est: -12.1% -$2,017,750.70
$18,693,987.00
Over/Under Est: 12.07% $2,013,710.30
Amt Left: 27.49% $4,031,461.00
Over/Under Est: 33.94% $5,661,131.40
Amt Left: 52.37% $7,678,882.10
Delta: -19.51% -$3,647,421.10
Subcontractor Percentage Amount
M & D FOUNDATION DRILLING INDUSTRIES, INC. 3.91% $577,776.75
J. H. STRAIN & SONS, INC. 1.75% $258,595.73
JB PINNACLE GROUP, LLC 0.64% $94,572.15
TORO BRAVO CONSTRUCTION, LLC 0.31% $45,808.39
CONTRACTORS SERVICE, LTD. 0.30% $44,330.70
BARRICADES UNLIMITED 0.28% $41,375.32
TRP CONSTRUCTION GROUP, LLC 0.28% $41,375.32
SCOTT DERR PAINTING CO, LLC 0.25% $36,942.25
LANCO TURF & SEEDING, INC. 0.15% $22,165.35
MARCOM'S MOWING SERVICE, LLC 0.15% $22,165.35
PRIMATE CONSTRUCTION, LP 0.13% $19,209.97
TORO BRAVO CONSTRUCTION, LLC 0.09% $13,299.21
PROFESSIONAL TRAFFIC CONTROL LLC 0.05% $7,388.45
PINNACLE GRINDING AND GROOVING LLC 0.05% $7,388.45
Total: 8.34% $1,232,393.39

Bid Items & Bid Tabulations

82 Total 0 of 82
STONEWALL  |  US 380  |  ABILENE  |  0106-04-036  |  08/03/2022  |  $16,680,276.70  |  BR 2022(829)  |  BRIDGE REPL  |  506 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
EARTH BUILDERS, L.P.
GILVIN-TERRILL, LTD.
THE LANE CONSTRUCTION CORPORATION
PREPARING ROW
STA 23.000 $2,000.000 $20,000.000 $2,000.000 $38,500.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 6,490.000 $10.000 $10.000 $10.000 $9.000
EXCAVATION (ROADWAY)
CY 942.000 $20.000 $20.000 $20.000 $34.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 11,062.000 $25.000 $30.000 $25.000 $37.600
BROADCAST SEED (PERM) (RURAL) (SANDY)
AC 1.260 $1,000.000 $2,200.000 $2,000.000 $2,330.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
AC 0.440 $1,000.000 $2,200.000 $2,000.000 $2,330.000
BROADCAST SEED (TEMP) (WARM)
AC 0.850 $900.000 $2,100.000 $2,000.000 $2,180.000
BROADCAST SEED (TEMP) (COOL)
AC 0.850 $900.000 $2,100.000 $2,000.000 $2,180.000
VEGETATIVE WATERING
MG 69.200 $60.000 $100.000 $30.000 $66.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 1,500.000 $95.000 $75.000 $100.000 $173.000
PRIME COAT (MC-30)
GAL 2,466.000 $6.000 $15.000 $7.500 $10.000
PLANE ASPH CONC PAV(0" TO 2")
SY 2,297.000 $5.000 $10.000 $10.000 $4.020
CEM STABIL BKFL
CY 491.000 $200.000 $300.000 $500.000 $400.000
TEMPORARY SPL SHORING
SF 1,700.000 $45.000 $10.000 $75.000 $25.000
DRILL SHAFT (18 IN)
LF 302.000 $125.000 $100.000 $90.000 $110.000
DRILL SHAFT (36 IN)
LF 464.000 $225.000 $350.000 $280.000 $350.000
DRILL SHAFT (42 IN)
LF 1,582.000 $300.000 $425.000 $365.000 $450.000
DRILL SHAFT (48 IN)
LF 930.000 $300.000 $500.000 $460.520 $550.000
CL C CONC (ABUT)(HPC)
CY 141.000 $1,200.000 $1,500.000 $2,000.000 $2,610.000
CL C CONC (CAP)(HPC)
CY 312.000 $1,200.000 $1,500.000 $2,000.000 $2,640.000
CL C CONC (COLUMN)(HPC)
CY 151.000 $1,200.000 $1,500.000 $2,000.000 $2,930.000
REINF CONC SLAB (HPC)
SF 75,806.000 $30.000 $35.000 $35.000 $60.000
APPROACH SLAB (HPC)
CY 124.000 $700.000 $1,200.000 $2,000.000 $1,600.000
PRESTR CONC GIRDER (TX46)
LF 2,282.000 $190.000 $300.000 $215.000 $330.000
PRESTR CONC GIRDER (TX54)
LF 4,659.000 $190.000 $300.000 $220.000 $340.000
PRESTR CONC GIRDER (TX70)
LF 3,378.000 $200.000 $300.000 $235.000 $390.000
SILICONE RESIN PAINT FINISH
SF 7,741.000 $15.000 $10.000 $5.000 $5.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 3,086.000 $160.000 $175.000 $200.000 $235.000
RIPRAP (MOW STRIP)(4 IN)
CY 118.700 $600.000 $750.000 $700.000 $940.000
RAIL (TY T223)(HPC)
LF 2,522.000 $250.000 $150.000 $175.000 $231.000
RAIL (TY T552)(HPC)
LF 1,282.000 $65.000 $165.000 $120.000 $148.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 413.000 $150.000 $175.000 $200.000 $311.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $70,000.000 $600,000.000 $1,350,000.000 $650,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $2,200,000.000 $400,000.000 $1,725,000.000 $1,050,000.000
MOBILIZATION
LS 1.000 $1,382,844.700 $1,500,000.000 $1,871,500.000 $2,450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $10,000.000 $5,000.000 $50,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $45.000 $50.000 $35.000 $37.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 160.000 $75.000 $50.000 $70.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 220.000 $15.000 $10.000 $15.000 $16.800
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 460.000 $40.000 $40.000 $25.000 $25.800
CONSTRUCTION EXITS (REMOVE)
SY 460.000 $14.000 $10.000 $10.000 $10.100
TEMP SEDMT CONT FENCE (INSTALL)
LF 200.000 $4.000 $5.000 $7.500 $5.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 200.000 $1.500 $1.000 $4.000 $1.240
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,750.000 $7.000 $5.000 $7.500 $5.600
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,750.000 $2.000 $1.000 $2.000 $1.240
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 13.000 $5,000.000 $6,000.000 $2,500.000 $7,300.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 1,420.000 $80.000 $125.000 $100.000 $164.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,420.000 $15.000 $10.000 $15.000 $12.700
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 1,420.000 $25.000 $20.000 $25.000 $24.000
RUMBLE STRIPS (SHOULDER)
LF 4,144.000 $0.300 $1.000 $1.400 $2.410
RUMBLE STRIPS (CENTERLINE)
LF 2,072.000 $0.300 $1.000 $1.400 $2.410
MTL W-BEAM GD FEN (TIM POST)
LF 1,800.000 $45.000 $40.000 $30.000 $32.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $3,000.000 $3,000.000 $2,450.000 $2,670.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $300.000 $500.000 $350.000 $382.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $4,000.000 $3,000.000 $3,700.000 $4,040.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $350.000 $500.000 $350.000 $382.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $2,500.000 $2,500.000 $2,730.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,200.000 $1,000.000 $1,500.000 $1,640.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $9,000.000 $10,000.000 $8,000.000 $8,700.000
WIRE FENCE (TY A)
LF 2,175.000 $25.000 $30.000 $20.000 $25.200
GATE (TY 2)
EA 2.000 $1,800.000 $2,000.000 $2,000.000 $2,520.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $900.000 $1,700.000 $1,000.000 $1,090.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $900.000 $1,700.000 $1,250.000 $1,360.000
REMOVE SM RD SN SUP&AM
EA 14.000 $120.000 $50.000 $125.000 $136.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 40.000 $40.000 $50.000 $45.000 $49.100
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 23.000 $50.000 $50.000 $43.000 $46.900
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 190.000 $6.000 $10.000 $5.000 $5.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 5,680.000 $1.000 $1.500 $0.900 $0.980
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 80.000 $10.000 $12.000 $16.500 $18.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 7,600.000 $1.000 $1.500 $0.900 $0.980
PAVEMENT SEALER 4"
LF 9,084.000 $1.500 $0.500 $0.300 $0.330
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 8,200.000 $0.500 $1.000 $0.650 $0.710
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 8,200.000 $0.500 $1.000 $0.650 $0.710
REFL PAV MRKR TY II-A-A
EA 103.000 $5.000 $10.000 $5.000 $5.500
ELIM EXT PAV MRK & MRKS (4")
LF 13,280.000 $1.500 $0.500 $0.800 $0.870
ELIM EXT PAV MRK & MRKS (24")
LF 80.000 $6.000 $4.000 $5.000 $5.500
PAV SURF PREP FOR MRK (4")
LF 7,316.000 $0.200 $0.500 $0.300 $0.330
SP MIXES SP-C SAC-B PG70-22
TON 1,786.000 $100.000 $200.000 $200.000 $185.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $3,750,000.000 $225,000.000 $1,600,000.000 $1,750,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $15,000.000 $15,000.000 $15,500.000 $17,000.000
TMA (STATIONARY)
DAY 4.000 $200.000 $500.000 $950.000 $300.000
TMA (MOBILE OPERATION)
DAY 4.000 $275.000 $1,000.000 $950.000 $2,500.000
Totals: $16,680,276.700 $14,662,526.000 $18,693,987.000 $22,341,408.100