County: STERLING Highway: SH 163 Date: 12/01/2022 (1 year ago) Engineer's Estimate: $2,121,104 Control Number: 0333-02-013
Project: BR 2023(234) District: SAN ANGELO Time: 187 WORKING DAYS Type: REPLACE BRIDGE AND APPROACHES
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,121,104.30
DELGADO'S CONTRACTORS, LLC   $2,615,605.00 1
23.31% | $494,500.70
ACME BRIDGE COMPANY, INC.   $3,234,186.15 2
52.48% | $1,113,081.85
23.65% | $618,581.15
COPPELL CONSTRUCTION CO., INC.   $3,255,589.66 3
53.49% | $1,134,485.36
24.47% | $639,984.66
0.66% | $21,403.51
RAGLE CONSTRUCTION, INC.   $4,056,441.08 4
91.24% | $1,935,336.78
55.09% | $1,440,836.08
24.60% | $800,851.42

Bid Items

Items: 75, 0 filtered
STERLING SH 163  |  SAN ANGELO  |  0333-02-013  |  12/01/2022  |  $2,121,104  |  BR 2023(234)  |  REPLACE BRIDGE AND APPROACHES  |  187 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate DELGADO'S CONTRACTORS, LLC ACME BRIDGE COMPANY, INC. COPPELL CONSTRUCTION CO., INC. RAGLE CONSTRUCTION, INC.
100 6002 PREPARING ROW STA 13.000 $5,000.000 $2,500.000 $3,000.000 $1,500.000 $30,000.000
110 6001 EXCAVATION (ROADWAY) CY 1,068.000 $15.000 $15.000 $25.300 $25.000 $69.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 4,745.000 $20.000 $34.000 $25.000 $35.000 $84.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 16,234.000 $2.000 $4.000 $5.000 $4.000 $7.500
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 11,920.000 $0.300 $1.000 $0.560 $2.000 $1.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 2,158.000 $0.300 $1.000 $0.560 $1.500 $1.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 2,158.000 $0.300 $1.000 $0.560 $1.500 $1.000
168 6001 VEGETATIVE WATERING MG 282.000 $12.000 $40.000 $59.700 $40.000 $49.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 16,503.000 $1.900 $1.500 $2.250 $3.000 $3.500
169 6005 SOIL RETENTION BLANKETS (CL 2) (TY E) SY 501.000 $2.100 $2.500 $3.350 $5.000 $3.500
247 6073 FL BS (CMP IN PLC)(TY D GR 1-2) (6") SY 3,537.000 $9.000 $22.000 $18.700 $25.000 $11.000
247 6219 FL BS (CMP IN PLC)(TY A GR 1-2)(9") SY 4,437.000 $30.000 $22.000 $27.500 $30.000 $16.500
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 167.000 $170.000 $375.000 $500.000 $300.000 $305.000
260 6073 LIME TRT (SUBGRADE)(8") SY 3,785.000 $4.000 $5.000 $5.000 $12.000 $5.500
260 6084 LIME TRT (SUBGRADE)(12") SY 4,544.000 $10.000 $5.000 $4.150 $14.000 $7.700
310 6009 PRIME COAT (MC-30) GAL 1,596.000 $8.000 $10.000 $8.300 $13.000 $9.260
316 6004 ASPH (TIER I) GAL 2,088.000 $3.000 $5.000 $9.900 $13.000 $7.370
316 6238 AGGR(TY-PD GR-3 SAC-B) CY 42.000 $85.000 $110.000 $949.000 $284.000 $252.870
316 6246 AGGR(TY-PE GR-3 SAC-B) CY 131.000 $100.000 $110.000 $709.000 $284.000 $155.800
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 2,280.000 $4.000 $7.000 $9.900 $28.000 $7.370
316 6405 ASPH (AC-20-5TR OR AC-20XP) GAL 1,421.000 $5.000 $7.000 $9.900 $28.000 $7.370
400 6005 CEM STABIL BKFL CY 64.000 $300.000 $300.000 $398.000 $334.000 $172.000
416 6004 DRILL SHAFT (36 IN) LF 396.000 $300.000 $550.000 $391.000 $315.000 $560.000
420 6013 CL C CONC (ABUT) CY 39.400 $1,000.000 $1,500.000 $1,490.000 $1,700.000 $1,177.000
420 6029 CL C CONC (CAP) CY 15.800 $1,165.000 $1,400.000 $1,980.000 $1,500.000 $1,809.000
420 6037 CL C CONC (COLUMN) CY 7.900 $1,097.000 $1,550.000 $2,510.000 $2,200.000 $2,564.000
422 6001 REINF CONC SLAB SF 4,140.000 $21.000 $25.000 $40.900 $38.000 $36.000
422 6015 APPROACH SLAB CY 54.600 $750.000 $1,200.000 $1,150.000 $900.000 $750.000
423 6003 RETAINING WALL (TEMP WALL) SF 1,657.000 $25.000 $25.000 $72.000 $40.000 $27.250
425 6035 PRESTR CONC GIRDER (TX28) LF 570.000 $200.000 $220.000 $350.000 $207.000 $203.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 292.000 $415.000 $700.000 $861.000 $950.000 $729.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 57.000 $500.000 $600.000 $1,030.000 $681.000 $688.000
450 6054 RAIL (TY SSTR) (W/DRAIN SLOTS) LF 262.000 $115.000 $130.000 $171.000 $162.000 $194.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 70.000 $200.000 $205.000 $317.000 $265.000 $227.000
462 6010 CONC BOX CULV (6 FT X 3 FT) LF 66.000 $675.000 $1,050.000 $1,350.000 $1,400.000 $700.000
496 6008 REMOV STR (BOX CULVERT) LF 66.000 $91.000 $100.000 $152.000 $265.000 $55.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $75,000.000 $87,500.000 $44,000.000 $44,138.710 $174,000.000
500 6001 MOBILIZATION LS 1.000 $190,000.000 $215,000.000 $225,000.000 $300,000.000 $380,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 12.000 $8,000.000 $2,000.000 $4,940.000 $1,190.000 $20,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 200.000 $42.000 $40.000 $55.800 $40.000 $50.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 78.000 $130.000 $70.000 $83.800 $55.000 $80.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 278.000 $20.500 $10.000 $16.800 $10.000 $15.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 224.000 $30.500 $40.000 $27.900 $40.000 $55.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 224.000 $7.750 $5.000 $11.200 $15.000 $25.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,148.000 $5.600 $5.000 $3.350 $4.000 $7.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,148.000 $1.200 $1.000 $1.100 $1.000 $2.500
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 200.000 $5.000 $7.000 $16.800 $7.000 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 200.000 $2.000 $1.000 $5.600 $2.000 $2.000
508 6002 CONSTRUCTING DETOURS (EBSS) SY 3,351.000 $20.000 $20.000 $25.000 $65.000 $27.650
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 8.000 $6,000.000 $5,000.000 $3,350.000 $7,645.000 $2,700.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 3,270.000 $30.000 $70.000 $88.200 $87.000 $125.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 3,270.000 $15.000 $10.000 $40.300 $12.000 $10.000
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 501.000 $35.000 $40.000 $40.800 $30.000 $67.100
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,300.000 $1,500.000 $2,620.000 $2,434.000 $2,650.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,000.000 $3,500.000 $3,990.000 $2,891.000 $4,225.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $870.000 $1,000.000 $934.000 $1,014.000 $1,150.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4.000 $10,000.000 $9,000.000 $12,100.000 $11,000.000 $9,425.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $800.000 $700.000 $36.600 $913.000 $1,500.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 22.000 $30.000 $35.000 $36.600 $25.000 $200.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 3,314.000 $1.000 $1.000 $1.100 $1.000 $1.000
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 96.000 $5.000 $5.000 $11.200 $10.000 $10.000
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 1,189.000 $1.000 $1.000 $1.400 $1.250 $1.250
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 24.000 $10.000 $10.000 $27.900 $25.000 $25.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 3,840.000 $1.000 $1.000 $1.400 $1.250 $1.250
666 6170 REFL PAV MRK TY II (W) 4" (SLD) LF 5,462.000 $1.000 $1.000 $0.560 $0.500 $0.500
666 6205 REFL PAV MRK TY II (Y) 4" (BRK) LF 650.000 $1.000 $1.000 $0.560 $0.500 $0.500
666 6207 REFL PAV MRK TY II (Y) 4" (SLD) LF 857.000 $1.000 $1.000 $0.560 $0.500 $0.500
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 5,462.000 $1.000 $1.000 $1.800 $1.600 $1.600
666 6312 RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL) LF 650.000 $1.000 $1.000 $2.250 $2.000 $2.000
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 857.000 $1.000 $1.000 $2.250 $2.000 $2.000
672 6009 REFL PAV MRKR TY II-A-A EA 46.000 $4.000 $1.000 $11.200 $10.000 $10.000
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 2,796.000 $1.000 $1.000 $1.650 $1.500 $1.500
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 2.000 $500.000 $500.000 $191.000 $904.000 $650.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 632.000 $70.000 $80.000 $49.700 $50.000 $92.000
6185 6002 TMA (STATIONARY) DAY 36.000 $155.000 $300.000 $82.800 $507.000 $370.000
Totals: $2,121,104.30 $2,615,605.00 $3,234,186.15 $3,255,589.66 $4,056,441.08