Show Job Controls
Bid Cobra

STEPHENS SH 67 (0256-02-031)

Items: 77

County: STEPHENS
Length: N/A
Highway: SH 67
District: BROWNWOOD
Control Number: 0256-02-031
DBE Goal: N/A
Project: STP 2019(921)
Guaranty: N/A
Time: 170 WORKING DAYS
Engineer's Estimate: $5,348,242.03
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: PAVMT/STRUCTURE/DITCH REPAIR-SAFETY TRT-SEAL_COAT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$5,348,242.03
$5,063,902.24
Over/Under Est: -5.32% -$284,339.79
Over/Under Est: 3.12% $166,956.56
Amt Left: 8.91% $451,296.35
$6,042,709.52
Over/Under Est: 12.98% $694,467.49
Amt Left: 19.33% $978,807.28
Delta: -9.56% -$527,510.93

Bid Items & Bid Tabulations

77 Total 0 of 77
STEPHENS  |  SH 67  |  BROWNWOOD  |  0256-02-031  |  05/07/2019  |  $5,348,242.03  |  STP 2019(921)  |  PAVMT/STRUCT/DITCH REPAIR-SAFETY TRT...  |  170 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PEACHTREE CONSTRUCTION, LTD.
JAY MILLS CONTRACTING, INCORPORATED
A. L. HELMCAMP, INC.
PREPARING ROW
STA 3.000 $1,500.000 $6,500.000 $4,000.000 $6,500.000
PREPARING ROW(TREE)(12" TO 24" DIA)
EA 2.000 $1,500.000 $2,500.000 $2,500.000 $900.000
EXCAVATION (ROADWAY)
CY 2,471.000 $30.000 $26.000 $40.000 $25.000
EXCAVATION (SPECIAL)
CY 508.000 $40.000 $32.000 $40.000 $35.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,096.000 $25.000 $32.000 $65.000 $38.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 29,222.000 $0.250 $0.160 $0.240 $0.120
BROADCAST SEED (TEMP) (WARM)
SY 14,611.000 $0.250 $0.210 $0.220 $0.100
BROADCAST SEED (TEMP) (COOL)
SY 14,611.000 $0.250 $0.210 $0.200 $0.100
FERTILIZER
TON 0.900 $1,000.000 $550.000 $550.000 $1,100.000
VEGETATIVE WATERING
MG 655.000 $25.000 $18.000 $25.000 $26.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 60.000 $50.000 $80.000 $75.000 $210.000
ASPH (AC-20-5TR)
GAL 188,470.000 $4.000 $3.800 $4.000 $4.000
AGGR(TY-PB GR-3 SAC-B)
CY 4,724.000 $105.000 $110.000 $95.000 $115.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 17,450.000 $57.000 $78.000 $78.000 $96.000
CL C CONC (CULV)
CY 329.700 $1,900.000 $950.000 $990.000 $1,300.000
RIPRAP (CONC)(5 IN)
CY 94.200 $500.000 $550.000 $580.000 $600.000
CMP (GAL STL 12 IN)
LF 8.000 $75.000 $55.000 $55.000 $55.000
CMP (GAL STL 18 IN)
LF 82.000 $65.000 $60.000 $60.500 $60.000
CMP (GAL STL 24 IN)
LF 2.000 $80.000 $90.000 $93.500 $110.000
CMP (GAL STL 30 IN)
LF 66.000 $100.000 $85.000 $88.000 $160.000
CMP AR (GAL STL DES 3)
LF 184.000 $100.000 $70.000 $71.500 $130.000
CMP AR (GAL STL DES 6)
LF 52.000 $250.000 $85.000 $88.000 $220.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $4,000.000 $1,000.000 $0.010 $8,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 19.000 $6,000.000 $4,500.000 $4,000.000 $5,500.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 9.000 $6,200.000 $4,200.000 $6,600.000 $6,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 2.000 $6,200.000 $8,500.000 $10,000.000 $6,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 3.000 $7,400.000 $4,000.000 $6,600.000 $6,000.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
EA 1.000 $8,000.000 $4,500.000 $6,050.000 $6,500.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
EA 1.000 $8,500.000 $5,500.000 $6,000.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $8,500.000 $7,000.000 $9,500.000 $8,500.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 1.000 $11,000.000 $6,000.000 $8,000.000 $9,000.000
SET (TY I)(S= 5 FT)(HW= 8 FT)(3:1) (C)
EA 1.000 $11,000.000 $16,000.000 $18,700.000 $10,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 13.000 $7,000.000 $3,500.000 $4,500.000 $9,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 3.000 $8,000.000 $6,000.000 $7,000.000 $9,500.000
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
EA 4.000 $12,000.000 $4,500.000 $5,850.000 $9,500.000
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
EA 1.000 $14,000.000 $5,000.000 $6,600.000 $8,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 9.000 $9,200.000 $5,500.000 $5,850.000 $8,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 14.000 $12,000.000 $5,500.000 $7,000.000 $9,000.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
EA 12.000 $10,000.000 $7,000.000 $8,800.000 $9,500.000
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
EA 2.000 $16,000.000 $6,000.000 $8,800.000 $10,500.000
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
EA 2.000 $16,000.000 $6,000.000 $7,900.000 $10,500.000
SET (TY II) (12 IN) (CMP) (6: 1) (P)
EA 4.000 $2,000.000 $850.000 $880.000 $900.000
SET (TY II) (15 IN) (CMP) (6: 1) (P)
EA 3.000 $2,200.000 $900.000 $910.000 $950.000
SET (TY II) (18 IN) (CMP) (6: 1) (C)
EA 14.000 $2,300.000 $950.000 $990.000 $1,000.000
SET (TY II) (21 IN) (CMP) (6: 1) (P)
EA 2.000 $2,350.000 $1,200.000 $1,210.000 $1,100.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 5.000 $2,400.000 $1,200.000 $1,210.000 $1,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $2,500.000 $1,100.000 $1,100.000 $1,300.000
SET (TY II) (30 IN) (CMP) (6: 1) (P)
EA 4.000 $2,500.000 $2,100.000 $2,100.000 $2,700.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 1.000 $2,300.000 $1,200.000 $1,210.000 $1,000.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 32.000 $2,500.000 $2,200.000 $2,100.000 $1,600.000
SET (TY II) (DES 6) (CMP) (6: 1) (P)
EA 2.000 $2,800.000 $2,700.000 $4,180.000 $4,500.000
REMOV STR (PIPE)
LF 148.000 $20.000 $11.000 $15.000 $32.000
MOBILIZATION
LS 1.000 $468,926.280 $450,000.000 $545,000.000 $550,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $8,000.000 $7,500.000 $15,000.000 $25,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 300.000 $30.000 $30.000 $38.500 $35.000
ROCK FILTER DAMS (REMOVE)
LF 300.000 $7.000 $10.000 $8.800 $8.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,800.000 $5.000 $3.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,800.000 $1.000 $1.000 $1.100 $1.200
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,935.000 $5.000 $4.000 $7.000 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,935.000 $1.000 $1.000 $1.100 $1.200
MTL W-BEAM GD FEN (STEEL POST)
LF 5,375.000 $28.000 $30.000 $28.600 $21.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 237.500 $60.000 $65.000 $71.000 $85.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 9.000 $1,500.000 $1,500.000 $1,410.000 $800.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $5.000 $3.400 $3.300 $8.000
GUARDRAIL END TREATMENT (INSTALL)
EA 52.000 $2,500.000 $3,200.000 $3,300.000 $3,000.000
WIRE FENCE (TY D)
LF 25.000 $20.000 $150.000 $50.000 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 178.000 $30.000 $30.000 $38.500 $36.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 134.000 $100.000 $110.000 $110.000 $70.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 9,364.000 $1.500 $2.000 $2.000 $0.550
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 280.000 $0.250 $1.200 $0.720 $0.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 186,166.000 $0.250 $0.500 $0.330 $0.330
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 21,221.000 $0.250 $0.600 $0.400 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 51,968.000 $0.250 $0.500 $0.350 $0.350
REFL PAV MRKR TY I-C
EA 15.000 $5.000 $6.000 $11.000 $11.000
REFL PAV MRKR TY II-A-A
EA 1,734.000 $5.000 $4.000 $4.150 $4.000
TMA (STATIONARY)
DAY 181.000 $400.000 $250.000 $300.000 $250.000
TMA (MOBILE OPERATION)
DAY 10.000 $400.000 $90.000 $500.000 $100.000
Totals: $5,348,242.030 $5,063,902.240 $5,515,198.590 $6,042,709.520