|
|
PREPARING ROW
|
STA
|
3.000
|
$1,500.000
|
$6,500.000
|
$4,000.000
|
$6,500.000
|
|
|
PREPARING ROW(TREE)(12" TO 24" DIA)
|
EA
|
2.000
|
$1,500.000
|
$2,500.000
|
$2,500.000
|
$900.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,471.000
|
$30.000
|
$26.000
|
$40.000
|
$25.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
508.000
|
$40.000
|
$32.000
|
$40.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
5,096.000
|
$25.000
|
$32.000
|
$65.000
|
$38.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
29,222.000
|
$0.250
|
$0.160
|
$0.240
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
14,611.000
|
$0.250
|
$0.210
|
$0.220
|
$0.100
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
14,611.000
|
$0.250
|
$0.210
|
$0.200
|
$0.100
|
|
|
FERTILIZER
|
TON
|
0.900
|
$1,000.000
|
$550.000
|
$550.000
|
$1,100.000
|
|
|
VEGETATIVE WATERING
|
MG
|
655.000
|
$25.000
|
$18.000
|
$25.000
|
$26.000
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
60.000
|
$50.000
|
$80.000
|
$75.000
|
$210.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
188,470.000
|
$4.000
|
$3.800
|
$4.000
|
$4.000
|
|
|
AGGR(TY-PB GR-3 SAC-B)
|
CY
|
4,724.000
|
$105.000
|
$110.000
|
$95.000
|
$115.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
|
SY
|
17,450.000
|
$57.000
|
$78.000
|
$78.000
|
$96.000
|
|
|
CL C CONC (CULV)
|
CY
|
329.700
|
$1,900.000
|
$950.000
|
$990.000
|
$1,300.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
94.200
|
$500.000
|
$550.000
|
$580.000
|
$600.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
8.000
|
$75.000
|
$55.000
|
$55.000
|
$55.000
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
82.000
|
$65.000
|
$60.000
|
$60.500
|
$60.000
|
|
|
CMP (GAL STL 24 IN)
|
LF
|
2.000
|
$80.000
|
$90.000
|
$93.500
|
$110.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
66.000
|
$100.000
|
$85.000
|
$88.000
|
$160.000
|
|
|
CMP AR (GAL STL DES 3)
|
LF
|
184.000
|
$100.000
|
$70.000
|
$71.500
|
$130.000
|
|
|
CMP AR (GAL STL DES 6)
|
LF
|
52.000
|
$250.000
|
$85.000
|
$88.000
|
$220.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
1.000
|
$4,000.000
|
$1,000.000
|
$0.010
|
$8,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
19.000
|
$6,000.000
|
$4,500.000
|
$4,000.000
|
$5,500.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
9.000
|
$6,200.000
|
$4,200.000
|
$6,600.000
|
$6,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
2.000
|
$6,200.000
|
$8,500.000
|
$10,000.000
|
$6,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
|
EA
|
3.000
|
$7,400.000
|
$4,000.000
|
$6,600.000
|
$6,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(4:1) (C)
|
EA
|
1.000
|
$8,000.000
|
$4,500.000
|
$6,050.000
|
$6,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (C)
|
EA
|
1.000
|
$8,500.000
|
$5,500.000
|
$6,000.000
|
$9,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,500.000
|
$7,000.000
|
$9,500.000
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$6,000.000
|
$8,000.000
|
$9,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 8 FT)(3:1) (C)
|
EA
|
1.000
|
$11,000.000
|
$16,000.000
|
$18,700.000
|
$10,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
|
EA
|
13.000
|
$7,000.000
|
$3,500.000
|
$4,500.000
|
$9,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$8,000.000
|
$6,000.000
|
$7,000.000
|
$9,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
4.000
|
$12,000.000
|
$4,500.000
|
$5,850.000
|
$9,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$14,000.000
|
$5,000.000
|
$6,600.000
|
$8,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
|
EA
|
9.000
|
$9,200.000
|
$5,500.000
|
$5,850.000
|
$8,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
14.000
|
$12,000.000
|
$5,500.000
|
$7,000.000
|
$9,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
12.000
|
$10,000.000
|
$7,000.000
|
$8,800.000
|
$9,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 6 FT)(4:1) (C)
|
EA
|
2.000
|
$16,000.000
|
$6,000.000
|
$8,800.000
|
$10,500.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
2.000
|
$16,000.000
|
$6,000.000
|
$7,900.000
|
$10,500.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$850.000
|
$880.000
|
$900.000
|
|
|
SET (TY II) (15 IN) (CMP) (6: 1) (P)
|
EA
|
3.000
|
$2,200.000
|
$900.000
|
$910.000
|
$950.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (C)
|
EA
|
14.000
|
$2,300.000
|
$950.000
|
$990.000
|
$1,000.000
|
|
|
SET (TY II) (21 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,350.000
|
$1,200.000
|
$1,210.000
|
$1,100.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
5.000
|
$2,400.000
|
$1,200.000
|
$1,210.000
|
$1,300.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$1,100.000
|
$1,100.000
|
$1,300.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,500.000
|
$2,100.000
|
$2,100.000
|
$2,700.000
|
|
|
SET (TY II) (DES 2) (CMP) (6: 1) (P)
|
EA
|
1.000
|
$2,300.000
|
$1,200.000
|
$1,210.000
|
$1,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
32.000
|
$2,500.000
|
$2,200.000
|
$2,100.000
|
$1,600.000
|
|
|
SET (TY II) (DES 6) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,800.000
|
$2,700.000
|
$4,180.000
|
$4,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
148.000
|
$20.000
|
$11.000
|
$15.000
|
$32.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$468,926.280
|
$450,000.000
|
$545,000.000
|
$550,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$7,500.000
|
$15,000.000
|
$25,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
300.000
|
$30.000
|
$30.000
|
$38.500
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
300.000
|
$7.000
|
$10.000
|
$8.800
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,800.000
|
$5.000
|
$3.000
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,800.000
|
$1.000
|
$1.000
|
$1.100
|
$1.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,935.000
|
$5.000
|
$4.000
|
$7.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,935.000
|
$1.000
|
$1.000
|
$1.100
|
$1.200
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,375.000
|
$28.000
|
$30.000
|
$28.600
|
$21.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
237.500
|
$60.000
|
$65.000
|
$71.000
|
$85.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
EA
|
9.000
|
$1,500.000
|
$1,500.000
|
$1,410.000
|
$800.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
550.000
|
$5.000
|
$3.400
|
$3.300
|
$8.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
52.000
|
$2,500.000
|
$3,200.000
|
$3,300.000
|
$3,000.000
|
|
|
WIRE FENCE (TY D)
|
LF
|
25.000
|
$20.000
|
$150.000
|
$50.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
178.000
|
$30.000
|
$30.000
|
$38.500
|
$36.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
|
EA
|
134.000
|
$100.000
|
$110.000
|
$110.000
|
$70.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,364.000
|
$1.500
|
$2.000
|
$2.000
|
$0.550
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
280.000
|
$0.250
|
$1.200
|
$0.720
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
186,166.000
|
$0.250
|
$0.500
|
$0.330
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
21,221.000
|
$0.250
|
$0.600
|
$0.400
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
51,968.000
|
$0.250
|
$0.500
|
$0.350
|
$0.350
|
|
REFL PAV MRKR TY I-C
|
EA
|
15.000
|
$5.000
|
$6.000
|
$11.000
|
$11.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,734.000
|
$5.000
|
$4.000
|
$4.150
|
$4.000
|
|
|
TMA (STATIONARY)
|
DAY
|
181.000
|
$400.000
|
$250.000
|
$300.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
10.000
|
$400.000
|
$90.000
|
$500.000
|
$100.000
|
|
Totals: |
$5,348,242.030
|
$5,063,902.240
|
$5,515,198.590
|
$6,042,709.520
|