STARR US 83 (0039-01-094)

Items: 56

County: STARR
Length: N/A
Highway: US 83
District: PHARR
Control Number: 0039-01-094
DBE Goal: N/A
Project: STP 2019(953)HES
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $759,390.10
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: CONSTRUCT MEDIAN CROSSOVER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$759,390.10
$1,161,964.94
Over/Under Est: 53.01% $402,574.84
$1,323,603.75
Over/Under Est: 74.3% $564,213.65
Amt Left: 13.91% $161,638.81
$1,401,165.86
Over/Under Est: 84.51% $641,775.76
Amt Left: 20.59% $239,200.92
Delta: -5.86% -$77,562.11

Bid Items & Bid Tabulations

56 Total 0 of 56
STARR  |  US 83  |  PHARR  |  0039-01-094  |  05/07/2019  |  $759,390.10  |  STP 2019(953)HES  |  CONSTRUCT MEDIAN CROSSOVER  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
REIM CONSTRUCTION, INC.
CLORE EQUIPMENT LLC
FOREMOST PAVING, INC.
REMOVING STAB BASE AND ASPH PAV (13")
SY 76.000 $19.000 $22.250 $24.000 $40.000
OBLITERATING ABANDONED ROAD
STA 22.000 $600.000 $250.000 $974.860 $1,500.000
EXCAVATION (ROADWAY)
CY 6,458.000 $8.000 $9.400 $11.830 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,166.000 $9.000 $7.250 $9.350 $20.000
FURNISHING AND PLACING TOPSOIL
CY 50.000 $30.000 $55.500 $54.130 $20.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 25,000.000 $0.500 $0.400 $0.370 $0.500
CELL FBR MLCH SEED(TEMP)(WARM)
SY 25,000.000 $0.200 $0.400 $0.370 $0.500
VEGETATIVE WATERING
MG 456.610 $20.000 $19.500 $30.310 $27.500
SPRINKLING (DUST CONTROL)
MG 237.000 $4.000 $1.100 $30.850 $2.500
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 1,753.090 $25.000 $24.500 $35.550 $50.000
LIME TRT (EXST MATL) (12")
SY 6,588.000 $2.500 $3.450 $4.930 $10.000
LIME (HYD, COM OR QK)(SLURRY)
TON 147.000 $160.000 $185.000 $259.390 $225.000
CEMENT
TON 60.000 $150.000 $171.000 $182.900 $180.000
CEMENT TREAT (NEW BASE) (10")
SY 6,312.000 $1.500 $3.450 $1.530 $10.000
PRIME COAT (MC-30)
GAL 1,391.000 $4.500 $5.200 $5.480 $6.000
ASPH (TIER II)
GAL 2,026.000 $4.000 $4.950 $8.360 $15.000
AGGR (TY-D GR-4P)(SAC-B)
CY 59.000 $50.000 $200.000 $114.530 $50.000
D-GR HMA TY-D SAC-A PG76-22
TON 1,143.000 $95.000 $98.000 $103.790 $100.000
PLANE ASPH CONC PAV (1.5")
SY 2,223.000 $0.550 $3.350 $5.460 $3.000
RC PIPE (CL III)(24 IN)(SPL)
LF 100.000 $45.000 $57.500 $56.690 $60.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 2.000 $1,000.000 $905.000 $1,270.390 $2,500.000
CLEAN EXIST CULVERTS
EA 1.000 $1,500.000 $3,050.000 $714.710 $5,000.000
REMOV STR (SET)
EA 4.000 $360.000 $222.000 $328.550 $1,000.000
REMOV STR (PIPE)
LF 180.000 $20.000 $16.000 $11.200 $15.000
MOBILIZATION
LS 1.000 $73,000.000 $185,000.000 $125,742.350 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,500.000 $4,450.000 $3,342.760 $4,500.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 312.000 $10.000 $14.500 $34.400 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $5.000 $8.000 $15.970 $13.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,350.000 $3.000 $4.400 $5.950 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,350.000 $0.500 $1.000 $2.170 $0.500
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 6,600.000 $30.000 $57.000 $67.840 $50.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 6,600.000 $8.000 $11.000 $12.660 $17.500
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 1,000.000 $0.150 $7.000 $1.890 $15.000
CRASH CUSH ATTEN (INSTL)
EA 2.000 $4,000.000 $9,690.000 $16,644.220 $16,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $800.000 $667.000 $1,082.500 $2,000.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 4.000 $530.000 $638.000 $119.080 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 8.000 $600.000 $954.000 $119.080 $1,000.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $500.000 $486.000 $135.310 $400.000
REMOVE SM RD SN SUP&AM
EA 8.000 $70.000 $73.000 $125.000 $130.000
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 4.000 $100.000 $91.000 $18.950 $90.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 4.000 $80.000 $85.000 $23.820 $92.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $200.000 $12.250 $108.250 $27.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 9,570.000 $0.600 $0.700 $1.890 $0.620
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 539.000 $1.000 $2.900 $2.710 $0.960
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,603.000 $0.750 $1.950 $1.890 $0.920
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 40.000 $5.000 $12.000 $5.390 $16.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,410.000 $0.350 $0.400 $0.500 $0.420
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 6,517.000 $0.300 $1.100 $0.640 $0.420
PREFAB PAV MRK TY C (W) (ARROW)
EA 8.000 $200.000 $267.000 $378.880 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $250.000 $316.000 $324.750 $320.000
REFL PAV MRKR TY II-A-A
EA 6.000 $2.750 $8.250 $4.330 $10.000
REFL PAV MRKR TY II-C-R
EA 439.000 $3.000 $5.000 $4.330 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,393.000 $0.550 $1.450 $0.430 $0.550
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $3,000.000 $2,220.000 $5,953.750 $5,000.000
TMA (STATIONARY)
EA 2.000 $4,000.000 $3,890.000 $5,746.120 $6,000.000
TMA (MOBILE OPERATION)
DAY 35.000 $125.000 $250.000 $974.250 $500.000
Totals: $759,390.100 $1,161,964.950 $1,323,603.769 $1,401,165.865