SOMERVELL FM 51 (0780-01-017)

Items: 36

County: SOMERVELL
Length: N/A
Highway: FM 51
District: FORT WORTH
Control Number: 0780-01-017
DBE Goal: N/A
Project: STP 2B20(092)HES
Guaranty: N/A
Time: 319 WORKING DAYS
Engineer's Estimate: $2,982,696.78
Date: 08/05/2020 (5 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION AND SAFETY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$2,982,696.78
$2,472,401.37
Over/Under Est: -17.11% -$510,295.41
Over/Under Est: 0.22% $6,559.05
Amt Left: 20.9% $516,854.46
Over/Under Est: 28.69% $855,834.77
Amt Left: 55.26% $1,366,130.18
Delta: -28.41% -$849,275.72

Bid Items & Bid Tabulations

36 Total 0 of 36
SOMERVELL  |  FM 51  |  FORT WORTH  |  0780-01-017  |  08/05/2020  |  $2,982,696.78  |  STP 2B20(092)HES  |  HAZARD ELIM AND SAFETY  |  319 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FOUTSCO PAVING COMPANY, LLC
NORTHEASTERN PAVERS, LLC
PEACHTREE CONSTRUCTION, LTD.
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 763.000 $7.500 $10.000 $50.000 $60.000
BACKFILLING PAVEMENT EDGES
CY 604.000 $50.000 $15.000 $110.000 $149.000
COMPOST MANUF TOPSOIL (4")
SY 74,596.000 $1.000 $0.800 $1.250 $1.400
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 74,596.000 $0.400 $0.110 $0.140 $0.180
VEGETATIVE WATERING
MG 2.610 $12.000 $100.000 $1,300.000 $350.000
ASPH (AC-20XP)
GAL 29,453.000 $3.500 $3.500 $2.250 $3.250
AGGR(TY-PB GR-4 SAC-B)
CY 693.000 $82.500 $80.000 $125.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 4,883.000 $65.000 $55.000 $75.000 $113.000
PLANE ASPH CONC PAV(0" TO 3")
SY 2,781.000 $2.100 $4.000 $7.500 $6.700
RIPRAP (MOW STRIP)(4 IN)
CY 367.000 $500.000 $450.000 $575.000 $680.000
MOBILIZATION
LS 1.000 $260,244.950 $245,000.000 $300,000.000 $348,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $8,000.000 $750.000 $1,700.000 $7,500.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 630.000 $5.000 $2.000 $7.000 $6.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 630.000 $1.200 $1.000 $2.000 $1.400
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 2.000 $6,000.000 $2,000.000 $4,500.000 $5,500.000
RUMBLE STRIPS (CENTERLINE)
LF 20,284.000 $0.200 $0.300 $0.400 $0.450
MTL W-BEAM GD FEN (TIM POST)
LF 5,625.000 $21.500 $19.000 $23.000 $24.500
GUARDRAIL END TREATMENT (INSTALL)
EA 52.000 $2,700.000 $2,500.000 $2,500.000 $2,900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 73.000 $600.000 $510.000 $425.000 $440.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 34.000 $600.000 $580.000 $525.000 $550.000
IN SM RD SN SUP&AM (INST SIGN ONLY)
EA 2.000 $200.000 $140.000 $130.000 $130.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $400.000 $420.000 $400.000 $400.000
REMOVE SM RD SN SUP&AM
EA 29.000 $160.000 $86.000 $85.000 $82.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 70.000 $30.000 $33.000 $30.000 $27.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 37.000 $100.000 $70.000 $115.000 $110.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 61,160.000 $0.970 $0.010 $0.400 $0.400
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 46.000 $6.750 $10.000 $6.500 $10.800
REF PROF PAV MRK TY I(W)4"(SLD)(060MIL)
LF 60,739.000 $0.490 $0.800 $0.700 $0.780
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 60,840.000 $0.250 $0.400 $0.350 $0.440
REFL PAV MRKR TY II-A-A
EA 776.000 $3.150 $3.500 $3.750 $3.900
D-GR HMA TY-B PG64-22
TON 498.000 $75.000 $100.000 $175.000 $185.000
SP MIXES SP-C SAC-A PG70-28
TON 10,530.000 $110.000 $103.000 $112.000 $135.000
TACK COAT
GAL 9,151.000 $3.000 $0.010 $0.010 $2.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $8,000.000 $1.000 $0.010 $12,500.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $20.000 $8.000 $8.000 $9.000
TMA (STATIONARY)
DAY 319.000 $225.000 $1.000 $0.010 $165.000
Totals: $2,982,696.780 $2,472,401.370 $2,989,255.830 $3,838,531.550