SMITH SL 323 (2075-01-058)

Items: 61

County: SMITH
Length: N/A
Highway: SL 323
District: TYLER
Control Number: 2075-01-058
DBE Goal: N/A
Project: C 2075-1-58
Guaranty: N/A
Time: 144 WORKING DAYS
Engineer's Estimate: $3,764,244.49
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$3,764,244.49
Over/Under Est: 20.85% $784,742.45
Over/Under Est: 32.83% $1,235,662.11
Amt Left: 9.91% $450,919.66
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 4.79% $217,928.42
PANOLA SIGN & BARRICADE, INC. 0.69% $31,392.61
MORRIS COUNTY CONTRACTORS, L.L.C. 0.31% $14,103.93
SOUTHWEST ENVIRONMENT SERVICES LLC 0.03% $1,364.90
Total: 5.82% $264,789.86

Bid Items & Bid Tabulations

61 Total 0 of 61
SMITH  |  SL 323  |  TYLER  |  2075-01-058  |  02/01/2023  |  $3,764,244.49  |  C 2075-1-58  |  RESURF ROADWAY  |  144 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 52.000 $12.000 $78.000 $40.000
REMOVING CONC (CURB)
LF 50.000 $35.000 $82.000 $20.000
REMOVING CONC (CURB AND GUTTER)
LF 50.000 $9.000 $82.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 5.000 $28.000 $525.000 $100.000
FURNISHING AND PLACING TOPSOIL (4")
SY 144.000 $1.200 $25.000 $30.000
BLOCK SODDING
SY 48.000 $3.750 $13.000 $30.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 48.000 $0.700 $9.600 $6.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 48.000 $0.700 $8.820 $6.000
VEGETATIVE WATERING
MG 2.000 $8.000 $300.000 $500.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 5,000.000 $54.000 $79.500 $88.000
PLANE ASPH CONC PAV (1.5")
SY 138,508.000 $2.000 $3.000 $3.000
PLANE ASPH CONC PAV (2")
SY 11,431.000 $2.250 $8.000 $7.000
FLOWABLE BACKFILL
CY 22.000 $250.000 $834.750 $500.000
CL C CONC (RAIL FOUNDATION)
CY 16.000 $585.000 $2,250.000 $1,500.000
RIPRAP (MOW STRIP)(5 IN)
CY 18.000 $425.000 $690.000 $600.000
RAIL (TY C411)
LF 233.000 $300.000 $430.500 $350.000
ADJUSTING MANHOLES & INLETS
EA 1.000 $2,500.000 $2,300.000 $5,000.000
MOBILIZATION
LS 1.000 $273,698.000 $240,000.000 $490,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $15,000.000 $11,000.000 $40,000.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 50.000 $19.000 $60.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 16.000 $75.000 $310.000 $75.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $3.000 $6.000 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $0.550 $2.000 $2.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 16.000 $96.000 $210.000 $125.000
CONC CURB & GUTTER (TY II)
LF 50.000 $26.000 $160.000 $75.000
CONC CURB & GUTTER TY II (MOD)
LF 50.000 $30.000 $160.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $32.000 $42.000 $55.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 2.000 $2,300.000 $2,782.500 $4,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,000.000 $3,465.000 $5,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 6.000 $37.000 $26.250 $45.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 15,030.000 $0.200 $1.050 $1.100
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 31,811.000 $0.200 $1.050 $1.100
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 12,621.000 $0.350 $1.050 $1.100
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,912.000 $3.000 $3.150 $3.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 31,682.000 $0.200 $1.050 $1.100
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 1,310.000 $5.000 $3.780 $4.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 8,851.000 $1.550 $1.000 $2.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 7,131.000 $1.500 $1.000 $5.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 230.000 $1.000 $1.050 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 12,621.000 $0.850 $1.050 $1.100
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 318.000 $5.000 $4.200 $5.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,912.000 $5.500 $6.300 $7.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 15,030.000 $0.330 $0.680 $0.700
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 31,811.000 $0.350 $0.630 $0.700
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 31,682.000 $0.350 $0.630 $0.700
PREFAB PAV MRK TY C (W) (ARROW)
EA 61.000 $200.000 $215.510 $230.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $500.000 $383.780 $400.000
PREFAB PAV MRK TY C (W) (WORD)
EA 59.000 $250.000 $242.030 $250.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 14.000 $35.000 $78.750 $80.000
REFL PAV MRKR TY I-C
EA 83.000 $3.250 $4.200 $5.000
REFL PAV MRKR TY II-A-A
EA 118.000 $3.080 $4.200 $5.000
REFL PAV MRKR TY II-C-R
EA 1,310.000 $3.150 $4.200 $5.000
MEMBRANE UNDERSEAL
GAL 2,858.000 $4.250 $4.000 $4.000
SP MIXES SP-C SAC-A PG70-22
TON 834.000 $180.000 $280.000 $175.000
SP MIXES SP-D SAC-A PG70-22
TON 424.000 $175.000 $383.000 $175.000
TACK COAT
GAL 500.000 $4.250 $7.500 $4.000
TBPFC (MEMBRANE)
GAL 34,591.000 $4.250 $4.000 $5.000
TBPFC PG76-22 SAC-A
TON 10,377.000 $200.000 $213.000 $210.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,000.000 $9,500.000 $30,000.000
TMA (STATIONARY)
DAY 48.000 $150.000 $376.200 $300.000
TMA (MOBILE OPERATION)
DAY 48.000 $150.000 $200.000 $300.000
Totals: $3,764,244.490 $4,548,986.940 $4,999,906.600