REMOVING CONC (RIPRAP)
|
SY
|
52.000
|
$12.000
|
$78.000
|
$40.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
50.000
|
$35.000
|
$82.000
|
$20.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
50.000
|
$9.000
|
$82.000
|
$30.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
5.000
|
$28.000
|
$525.000
|
$100.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
144.000
|
$1.200
|
$25.000
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
48.000
|
$3.750
|
$13.000
|
$30.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
48.000
|
$0.700
|
$9.600
|
$6.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
48.000
|
$0.700
|
$8.820
|
$6.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2.000
|
$8.000
|
$300.000
|
$500.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,000.000
|
$54.000
|
$79.500
|
$88.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
138,508.000
|
$2.000
|
$3.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
11,431.000
|
$2.250
|
$8.000
|
$7.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
22.000
|
$250.000
|
$834.750
|
$500.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
16.000
|
$585.000
|
$2,250.000
|
$1,500.000
|
|
|
RIPRAP (MOW STRIP)(5 IN)
|
CY
|
18.000
|
$425.000
|
$690.000
|
$600.000
|
|
|
RAIL (TY C411)
|
LF
|
233.000
|
$300.000
|
$430.500
|
$350.000
|
|
|
ADJUSTING MANHOLES & INLETS
|
EA
|
1.000
|
$2,500.000
|
$2,300.000
|
$5,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$273,698.000
|
$240,000.000
|
$490,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$15,000.000
|
$11,000.000
|
$40,000.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
50.000
|
$19.000
|
$60.000
|
$40.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$75.000
|
$310.000
|
$75.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
400.000
|
$3.000
|
$6.000
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
400.000
|
$0.550
|
$2.000
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
16.000
|
$96.000
|
$210.000
|
$125.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
50.000
|
$26.000
|
$160.000
|
$75.000
|
|
|
CONC CURB & GUTTER TY II (MOD)
|
LF
|
50.000
|
$30.000
|
$160.000
|
$100.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$32.000
|
$42.000
|
$55.000
|
|
|
MTL THRIE-BEAM GD FEN (STEEL POST)
|
EA
|
2.000
|
$2,300.000
|
$2,782.500
|
$4,000.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,465.000
|
$5,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
6.000
|
$37.000
|
$26.250
|
$45.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
15,030.000
|
$0.200
|
$1.050
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
31,811.000
|
$0.200
|
$1.050
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
12,621.000
|
$0.350
|
$1.050
|
$1.100
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
2,912.000
|
$3.000
|
$3.150
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
31,682.000
|
$0.200
|
$1.050
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
1,310.000
|
$5.000
|
$3.780
|
$4.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
8,851.000
|
$1.550
|
$1.000
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
7,131.000
|
$1.500
|
$1.000
|
$5.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
230.000
|
$1.000
|
$1.050
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
12,621.000
|
$0.850
|
$1.050
|
$1.100
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
318.000
|
$5.000
|
$4.200
|
$5.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
2,912.000
|
$5.500
|
$6.300
|
$7.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
15,030.000
|
$0.330
|
$0.680
|
$0.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
31,811.000
|
$0.350
|
$0.630
|
$0.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
31,682.000
|
$0.350
|
$0.630
|
$0.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
61.000
|
$200.000
|
$215.510
|
$230.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$500.000
|
$383.780
|
$400.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
59.000
|
$250.000
|
$242.030
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
14.000
|
$35.000
|
$78.750
|
$80.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
83.000
|
$3.250
|
$4.200
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
118.000
|
$3.080
|
$4.200
|
$5.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,310.000
|
$3.150
|
$4.200
|
$5.000
|
|
|
MEMBRANE UNDERSEAL
|
GAL
|
2,858.000
|
$4.250
|
$4.000
|
$4.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
834.000
|
$180.000
|
$280.000
|
$175.000
|
|
|
SP MIXES SP-D SAC-A PG70-22
|
TON
|
424.000
|
$175.000
|
$383.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
500.000
|
$4.250
|
$7.500
|
$4.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
34,591.000
|
$4.250
|
$4.000
|
$5.000
|
|
|
TBPFC PG76-22 SAC-A
|
TON
|
10,377.000
|
$200.000
|
$213.000
|
$210.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$9,500.000
|
$30,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
48.000
|
$150.000
|
$376.200
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
48.000
|
$150.000
|
$200.000
|
$300.000
|
|
Totals: |
$3,764,244.490
|
$4,548,986.940
|
$4,999,906.600
|