SMITH FM 344 (0927-01-030)

Items: 87

County: SMITH
Length: N/A
Highway: FM 344
District: TYLER
Control Number: 0927-01-030
DBE Goal: N/A
Project: STP 2B20(056)HES
Guaranty: N/A
Time: 195 WORKING DAYS
Engineer's Estimate: $2,068,567.95
Date: 08/06/2020 (5 years ago)
Contract Number: N/A
Type: IMPROVE DRAINAGE, UPGRADE GUARD RAIL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (10)
E
Engineer's Estimate
$2,068,567.95
Over/Under Est: -11.36% -$235,020.12
Over/Under Est: 1.73% $35,731.95
Amt Left: 14.77% $270,752.07
$2,107,353.65
Over/Under Est: 1.88% $38,785.70
Amt Left: 14.93% $273,805.82
Delta: -0.15% -$3,053.75
Over/Under Est: 2.7% $55,941.30
Amt Left: 15.87% $290,961.42
Delta: -0.81% -$17,155.60
$2,151,620.35
Over/Under Est: 4.01% $83,052.40
Amt Left: 17.35% $318,072.52
Delta: -1.28% -$27,111.10
Over/Under Est: 7.61% $157,399.00
Amt Left: 21.4% $392,419.12
Delta: -3.46% -$74,346.60
$2,255,114.00
Over/Under Est: 9.02% $186,546.05
Amt Left: 22.99% $421,566.17
Delta: -1.31% -$29,147.05
$2,561,644.19
Over/Under Est: 23.84% $493,076.24
Amt Left: 39.71% $728,096.36
Delta: -13.59% -$306,530.19
$2,787,547.75
Over/Under Est: 34.76% $718,979.80
Amt Left: 52.03% $953,999.92
Delta: -8.82% -$225,903.56
$3,238,525.50
Over/Under Est: 56.56% $1,169,957.55
Amt Left: 76.63% $1,404,977.67
Delta: -16.18% -$450,977.75

Bid Items & Bid Tabulations

87 Total 0 of 87
SMITH  |  FM 344  |  TYLER  |  0927-01-030  |  08/06/2020  |  $2,068,567.95  |  STP 2B20(056)HES  |  IMPROVE DRAINAGE, UPGRADE GUARD RAIL  |  195 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
A R BROTHERS CONSTRUCTION SERVICES, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PIERCE R & B LLC
BAKER & COMPANY CONSTRUCTION, LLC
REYNOLDS & KAY, LTD.
EAST TEXAS BRIDGE, INC.
SJ&J CONSTRUCTION, LLC
DBI SERVICES, LLC
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
AC 5.000 $8,000.000 $25,000.000 $7,500.000 $5,200.000 $5,300.000 $5,000.000 $8,000.000 $2,500.000 $7,000.000 $2,499.000 $40,000.000
REMOVING CONC (DRIVEWAYS)
SY 620.000 $15.000 $17.000 $22.000 $15.000 $13.000 $16.000 $30.000 $20.000 $15.000 $20.000 $20.000
REMOVING CONC (MISC)
SY 24.000 $15.000 $17.000 $100.000 $30.000 $55.000 $18.000 $30.000 $20.000 $200.000 $20.000 $20.000
EXCAVATION (SPECIAL)
CY 80.000 $20.000 $6.000 $35.000 $45.000 $36.000 $20.000 $40.000 $25.000 $30.000 $20.000 $50.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,166.000 $20.000 $12.000 $18.000 $20.000 $24.000 $20.000 $30.000 $30.000 $15.000 $20.000 $35.000
BLADING
HR 200.000 $175.000 $25.000 $250.000 $95.000 $150.000 $135.000 $100.000 $100.000 $190.000 $150.000 $150.000
FURNISHING AND PLACING TOPSOIL (4")
SY 8,129.000 $1.500 $3.000 $4.000 $2.000 $2.500 $3.000 $4.000 $4.000 $6.000 $1.000 $6.000
BLOCK SODDING
SY 200.000 $8.000 $6.500 $7.500 $6.000 $5.500 $7.250 $6.000 $5.000 $8.000 $3.000 $6.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 8,129.000 $0.800 $0.720 $1.100 $1.100 $0.750 $0.850 $0.800 $1.000 $0.910 $0.750 $1.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 4,065.000 $0.750 $0.650 $1.100 $1.100 $0.700 $0.700 $0.700 $1.000 $0.820 $0.750 $1.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 4,065.000 $0.750 $0.630 $1.100 $1.100 $0.700 $0.680 $0.700 $1.000 $0.800 $0.750 $1.000
VEGETATIVE WATERING
MG 270.000 $12.000 $9.000 $2.000 $50.000 $11.000 $10.000 $10.000 $20.000 $75.000 $10.000 $35.000
CUT & RESTORING PAV
SY 12.000 $100.000 $110.000 $180.000 $110.000 $110.000 $165.000 $150.000 $150.000 $150.000 $200.000 $200.000
FLOWABLE BACKFILL
CY 28.000 $250.000 $158.000 $250.000 $300.000 $1,100.000 $175.000 $360.000 $200.000 $250.000 $250.000 $350.000
TRENCH EXCAVATION PROTECTION
LF 32.000 $10.000 $6.000 $15.000 $20.000 $450.000 $1.000 $100.000 $30.000 $15.000 $2.000 $10.000
CL C CONC (COLLAR)
EA 70.000 $1,050.000 $200.000 $975.000 $985.000 $506.000 $425.000 $800.000 $500.000 $350.000 $999.000 $1,500.000
RIPRAP (CONC)(4 IN)
CY 28.000 $650.000 $434.000 $500.000 $550.000 $200.000 $675.000 $600.000 $600.000 $475.000 $500.000 $550.000
RIPRAP (CONC)(5 IN)
CY 33.000 $550.000 $449.000 $475.000 $615.000 $484.000 $635.000 $600.000 $650.000 $500.000 $500.000 $650.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 35.000 $130.000 $158.000 $190.000 $175.000 $510.000 $205.000 $200.000 $180.000 $235.000 $500.000 $185.000
RIPRAP (MOW STRIP)(4 IN)
CY 235.000 $500.000 $400.000 $525.000 $495.000 $655.000 $630.000 $500.000 $600.000 $525.000 $500.000 $550.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 58.000 $450.000 $300.000 $505.000 $475.000 $497.000 $455.000 $1,000.000 $450.000 $850.000 $600.000 $450.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 33.000 $450.000 $350.000 $560.000 $490.000 $845.000 $485.000 $1,000.000 $500.000 $1,000.000 $600.000 $550.000
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
LF 33.000 $500.000 $400.000 $590.000 $500.000 $830.000 $507.000 $1,100.000 $600.000 $1,200.000 $600.000 $550.000
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
LF 17.000 $650.000 $550.000 $740.000 $625.000 $428.000 $730.000 $1,200.000 $700.000 $1,355.000 $600.000 $650.000
CONC BOX CULV (7 FT X 4 FT)(EXTEND)
LF 24.000 $750.000 $600.000 $750.000 $675.000 $42.000 $1,000.000 $1,200.000 $800.000 $1,500.000 $600.000 $750.000
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
LF 42.000 $400.000 $350.000 $405.000 $350.000 $64.000 $450.000 $900.000 $450.000 $850.000 $600.000 $350.000
RC PIPE (CL III)(18 IN)
LF 1,422.000 $40.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(24 IN)
LF 520.000 $55.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
RC PIPE (CL III)(30 IN)
LF 44.000 $95.000 $90.000 $80.000 $100.000 $145.000 $97.000 $95.000 $160.000 $115.000 $100.000 $125.000
RC PIPE (CL III)(36 IN)
LF 26.000 $105.000 $150.000 $120.000 $142.000 $128.000 $140.000 $135.000 $250.000 $130.000 $120.000 $150.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $4,000.000 $5,000.000 $7,000.000 $5,500.000 $5,050.000 $6,000.000 $8,000.000 $6,500.000 $8,500.000 $4,999.000 $8,500.000
HEADWALL (CH - FW - 0) (DIA= 18 IN)
EA 3.000 $2,500.000 $3,000.000 $3,300.000 $3,500.000 $5,200.000 $1,600.000 $3,500.000 $5,000.000 $4,500.000 $3,999.000 $2,000.000
HEADWALL (CH - FW - 0) (DIA= 24 IN)
EA 4.000 $4,000.000 $4,000.000 $3,500.000 $4,500.000 $5,600.000 $1,800.000 $4,500.000 $6,000.000 $5,400.000 $4,999.000 $2,500.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 3.000 $5,500.000 $5,000.000 $4,500.000 $5,500.000 $5,500.000 $1,900.000 $6,000.000 $7,000.000 $6,500.000 $4,999.000 $2,850.000
HEADWALL (CH - FW - 0) (DIA= 36 IN)
EA 3.000 $6,500.000 $6,000.000 $4,800.000 $6,500.000 $5,600.000 $3,700.000 $7,000.000 $8,000.000 $8,200.000 $5,999.000 $3,300.000
HEADWALL (CH - FW - 15) (DIA= 24 IN)
EA 1.000 $4,000.000 $5,000.000 $3,400.000 $8,500.000 $7,700.000 $1,800.000 $6,500.000 $6,500.000 $5,000.000 $9,999.000 $3,500.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 2.000 $4,500.000 $4,500.000 $4,600.000 $6,750.000 $6,900.000 $1,800.000 $6,500.000 $6,500.000 $7,500.000 $5,999.000 $3,500.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,500.000 $6,000.000 $7,000.000 $8,200.000 $7,700.000 $3,600.000 $7,500.000 $7,000.000 $8,500.000 $6,999.000 $6,500.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $5,500.000 $5,000.000 $6,800.000 $7,500.000 $7,200.000 $1,800.000 $7,500.000 $6,500.000 $8,000.000 $5,999.000 $6,500.000
WINGWALL (FW - 0) (HW=3 FT)
EA 6.000 $5,000.000 $5,500.000 $5,500.000 $6,000.000 $7,200.000 $6,500.000 $4,000.000 $5,000.000 $5,500.000 $5,999.000 $12,000.000
WINGWALL (FW - 0) (HW=4 FT)
EA 6.000 $6,000.000 $6,700.000 $6,500.000 $6,500.000 $8,000.000 $7,500.000 $5,000.000 $6,000.000 $6,800.000 $6,999.000 $12,500.000
WINGWALL (FW - 0) (HW=5 FT)
EA 3.000 $7,000.000 $8,000.000 $7,200.000 $8,750.000 $9,600.000 $9,800.000 $7,500.000 $7,000.000 $9,500.000 $7,999.000 $13,500.000
WINGWALL (PW - 1) (HW=5 FT)
EA 2.000 $10,000.000 $9,000.000 $10,500.000 $12,500.000 $9,100.000 $10,500.000 $10,000.000 $9,000.000 $14,000.000 $12,999.000 $15,000.000
WINGWALL (PW - 1) (HW=6 FT)
EA 1.000 $12,000.000 $12,000.000 $14,250.000 $15,500.000 $13,900.000 $12,000.000 $13,000.000 $10,000.000 $18,000.000 $14,999.000 $17,000.000
SET (TY I)(S=2 FT)(HW=3FT)(3:1)(C)
EA 1.000 $7,500.000 $5,000.000 $5,400.000 $5,500.000 $7,400.000 $7,100.000 $2,500.000 $7,000.000 $8,050.000 $9,999.000 $15,000.000
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
EA 4.000 $8,000.000 $5,500.000 $5,500.000 $7,250.000 $6,600.000 $9,000.000 $3,000.000 $7,000.000 $8,800.000 $9,999.000 $16,500.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 20.000 $700.000 $600.000 $525.000 $720.000 $980.000 $685.000 $500.000 $760.000 $700.000 $999.000 $1,850.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 5.000 $750.000 $600.000 $560.000 $650.000 $1,140.000 $680.000 $535.000 $786.000 $850.000 $1,099.000 $1,850.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 205.000 $650.000 $600.000 $625.000 $575.000 $680.000 $755.000 $600.000 $851.000 $900.000 $1,099.000 $1,250.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 20.000 $850.000 $600.000 $665.000 $750.000 $1,100.000 $770.000 $635.000 $864.000 $1,050.000 $1,099.000 $2,000.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $900.000 $600.000 $770.000 $880.000 $1,200.000 $850.000 $750.000 $942.000 $1,150.000 $1,099.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 31.000 $925.000 $900.000 $975.000 $1,200.000 $1,150.000 $1,000.000 $950.000 $1,100.000 $1,300.000 $1,399.000 $2,000.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 4.000 $1,800.000 $1,500.000 $1,125.000 $1,600.000 $1,500.000 $1,150.000 $1,100.000 $1,200.000 $1,500.000 $1,399.000 $3,000.000
CLEAN EXIST CULVERTS
EA 46.000 $1,500.000 $200.000 $1,100.000 $1,000.000 $1,400.000 $2,100.000 $800.000 $700.000 $1,500.000 $1,699.000 $1,500.000
REMOV STR (PIPE)
EA 120.000 $350.000 $170.000 $165.000 $350.000 $350.000 $425.000 $350.000 $400.000 $100.000 $499.000 $500.000
MOBILIZATION
LS 1.000 $200,000.000 $170,000.000 $200,000.000 $200,000.000 $135,000.000 $220,000.000 $200,000.000 $170,000.000 $240,000.000 $300,000.000 $300,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $1,500.000 $4,000.000 $5,000.000 $5,500.000 $3,000.000 $6,000.000 $6,000.000 $6,000.000 $7,999.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,120.000 $32.000 $29.500 $32.000 $35.250 $32.000 $33.000 $33.000 $18.000 $35.000 $50.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 3,120.000 $10.000 $8.500 $9.000 $10.000 $5.000 $8.500 $9.000 $10.000 $10.000 $10.000 $15.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 400.000 $20.000 $15.000 $25.000 $12.000 $24.000 $13.000 $30.000 $10.000 $30.000 $20.000 $50.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 200.000 $65.000 $105.000 $150.000 $75.000 $90.000 $50.000 $100.000 $60.000 $60.000 $60.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 16,800.000 $2.500 $2.450 $2.350 $2.600 $3.000 $2.500 $2.500 $2.000 $3.000 $5.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 16,800.000 $0.800 $0.800 $0.800 $1.000 $0.500 $0.850 $0.900 $1.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 400.000 $4.500 $4.750 $4.400 $4.500 $4.500 $4.250 $5.000 $6.000 $5.000 $5.000 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 400.000 $2.000 $1.000 $0.900 $1.000 $1.000 $0.850 $1.000 $1.000 $1.000 $1.000 $9.000
INTERSECTIONS (ACP)
SY 358.000 $40.000 $69.000 $55.000 $60.000 $58.000 $77.000 $40.000 $100.000 $80.000 $69.000 $45.000
DRIVEWAYS (ACP)
SY 3,909.000 $35.000 $50.000 $48.000 $42.000 $39.000 $40.000 $40.000 $45.000 $70.000 $69.000 $45.000
DRIVEWAYS (CONC) (HES)
SY 620.000 $90.000 $90.000 $90.000 $98.000 $86.000 $90.000 $135.000 $150.000 $95.000 $69.000 $125.000
MTL W-BEAM GD FEN (TIM POST)
LF 2,275.000 $20.000 $17.000 $22.000 $19.000 $19.000 $20.000 $19.000 $26.000 $25.000 $25.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,550.000 $1,220.000 $1,450.000 $1,342.000 $1,300.000 $1,400.000 $1,500.000 $1,800.000 $1,900.000 $1,699.000 $1,850.000
SHORT RADIUS
LF 93.750 $25.000 $33.000 $50.000 $37.000 $36.000 $38.000 $37.000 $60.000 $30.000 $30.000 $50.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,100.000 $925.000 $1,250.000 $1,020.000 $1,000.000 $1,050.000 $1,000.000 $900.000 $1,450.000 $1,300.000 $1,850.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,000.000 $690.000 $1,100.000 $760.000 $760.000 $790.000 $800.000 $60.000 $1,430.000 $800.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 450.000 $3.000 $3.000 $2.500 $3.500 $3.300 $3.450 $3.500 $3.000 $2.000 $3.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $175.000 $250.000 $220.000 $275.000 $275.000 $285.000 $300.000 $500.000 $190.000 $250.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 22.000 $2,700.000 $2,300.000 $2,600.000 $2,530.000 $2,500.000 $2,650.000 $2,600.000 $2,600.000 $3,100.000 $3,000.000 $2,650.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $150.000 $220.000 $165.000 $165.000 $172.000 $200.000 $400.000 $250.000 $250.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $25.000 $20.000 $16.500 $22.000 $22.000 $17.000 $25.000 $40.000 $25.000 $30.000 $50.000
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
EA 118.000 $55.000 $45.000 $50.000 $50.000 $76.000 $23.000 $60.000 $90.000 $85.000 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 65.000 $30.000 $21.000 $27.500 $23.000 $23.000 $24.000 $25.000 $90.000 $25.000 $50.000 $50.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 6.000 $250.000 $225.000 $550.000 $250.000 $275.000 $450.000 $550.000 $220.000 $375.000 $300.000 $250.000
THERMOPLASTIC PIPE(24 IN)(PP)(TYPE III)
LF 178.000 $55.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
THERMOPLASTIC PIPE(18 IN)(PP)(TYPE III)
LF 1,632.000 $40.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000 $0.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $100.000 $85.000 $100.000 $150.000 $119.000 $85.000 $200.000 $100.000 $65.000 $100.000 $150.000
TMA (STATIONARY)
DAY 184.000 $200.000 $50.000 $100.000 $200.000 $200.000 $145.000 $150.000 $100.000 $250.000 $199.000 $350.000
1
RC PIPE (CL III)(18 IN)
LF 3,054.000 $40.000 $37.000 $40.000 $38.000 $42.000 $50.000 $47.000 $70.000 $35.000 $80.000 $85.000
1
RC PIPE (CL III)(24 IN)
LF 698.000 $55.000 $57.000 $60.000 $65.000 $64.000 $70.000 $70.000 $90.000 $75.000 $90.000 $105.000
Totals: $2,229,117.950 $1,833,547.830 $2,104,299.900 $2,107,353.650 $2,124,509.250 $2,151,620.350 $2,225,966.950 $2,255,114.000 $2,561,644.190 $2,787,547.750 $3,238,525.500