Show Job Controls
Bid Cobra

SMITH VA (0910-16-169)

Items: 30

County: SMITH
Length: N/A
Highway: VA
District: TYLER
Control Number: 0910-16-169
DBE Goal: N/A
Project: F 2022(028)
Guaranty: N/A
Time: 86 WORKING DAYS
Engineer's Estimate: $157,515.00
Date: 09/02/2021 (4 years ago)
Contract Number: N/A
Type: LANDSCAPE DEVELOPMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (1)
E
Engineer's Estimate
$157,515.00
$157,495.00
Over/Under Est: -0.01% -$20.00
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 8.32% $13,103.58
Total: 8.32% $13,103.58

Bid Items & Bid Tabulations

30 Total 0 of 30
SMITH  |  VA  |  TYLER  |  0910-16-169  |  09/02/2021  |  $157,515.00  |  F 2022(028)  |  LANDSCAPE DEVELOPMENT  |  86 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TIGHT LINE CONSTRUCTION, LLC
REMOVING CONC (CURB)
LF 30.000 $35.000 $50.000
BLOCK SODDING
SY 145.000 $5.000 $12.000
VEGETATIVE WATERING
MG 5.000 $30.000 $100.000
IRRIGATION SYSTEM (TY I)
LS 1.000 $16,000.000 $8,000.000
IRRIGATION SYSTEM (TY II)
LS 1.000 $16,000.000 $8,000.000
IRRIGATION SYSTEM (TY III)
LS 1.000 $7,000.000 $8,000.000
IRRIGATION SYSTEM (TY IV)
LS 1.000 $14,000.000 $8,000.000
PLANT MATERIAL (1-GAL)
EA 140.000 $14.000 $20.000
PLANT MATERIAL (5-GAL)
EA 22.000 $33.000 $50.000
LANDSCAPE EDGE
LF 446.000 $22.000 $25.000
PLANT BED PREPARATION
SY 255.000 $35.000 $10.000
PLANT MATERIAL (30 GAL) (TREE)
EA 18.000 $490.000 $300.000
PLANT MATERIAL (45 GAL) (TREE)
EA 16.000 $500.000 $450.000
MOBILIZATION
LS 1.000 $13,665.000 $20,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,000.000 $1,500.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 200.000 $4.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 200.000 $2.000 $1.000
CONC CURB (TY II)
LF 30.000 $40.000 $50.000
CONC SIDEWALKS (4")
SY 14.000 $70.000 $100.000
CONC SIDEWALKS (6")
SY 74.000 $115.000 $100.000
CURB RAMPS
SY 22.000 $275.000 $250.000
GROUND BOX TY D (162922)
EA 2.000 $1,000.000 $750.000
REMOVE GROUND BOX
EA 2.000 $250.000 $400.000
PREFAB PAV MRK TY B (W)(24")(SLD)
LF 15.000 $25.000 $45.000
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 161.000 $10.000 $25.000
ELIM EXT PAV MRK & MRKS (12")
LF 175.000 $2.000 $10.000
ELIM EXT PAV MRK & MRKS (24")
LF 19.000 $3.000 $15.000
LANDSCAPE AMENITY (TY 1)
EA 2.000 $4,200.000 $15,000.000
LANDSCAPE AMENITY (TY 2)
EA 1.000 $450.000 $8,000.000
TMA (STATIONARY)
DAY 20.000 $200.000 $1.000
Totals: $157,515.000 $157,495.000