SMITH VA (0910-00-134)

Items: 42

County: SMITH
Length: N/A
Highway: VA
District: TYLER
Control Number: 0910-00-134
DBE Goal: N/A
Project: F 2022(964)
Guaranty: N/A
Time: 63 WORKING DAYS
Engineer's Estimate: $435,667.19
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
WILL BUSKELL
STACY WYLIE1
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$435,667.19
$470,054.60
Over/Under Est: 7.89% $34,387.41
Over/Under Est: 16.08% $70,035.51
Amt Left: 7.58% $35,648.10
Over/Under Est: 20.02% $87,215.81
Amt Left: 11.24% $52,828.40
Delta: -3.40% -$17,180.30
Over/Under Est: 22.09% $96,228.51
Amt Left: 13.16% $61,841.10
Delta: -1.72% -$9,012.70
Over/Under Est: 33.77% $147,145.81
Amt Left: 23.99% $112,758.40
Delta: -9.57% -$50,917.30

Bid Items & Bid Tabulations

42 Total 0 of 42
SMITH  |  VA  |  TYLER  |  0910-00-134  |  08/03/2022  |  $435,667.19  |  F 2022(964)  |  BICYCLE AND PEDESTRIAN IMPRVS  |  63 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
THK CONSTRUCTION LLC
BUILT RIGHT CONSTRUCTION OF OKLAHOMA, LLC
REMOVING CONC (CURB)
LF 33.000 $16.140 $14.000 $20.000 $50.000 $20.000 $10.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 38.000 $25.230 $12.000 $20.000 $50.000 $50.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 30.000 $22.690 $15.000 $20.000 $50.000 $20.000 $25.000
FURNISHING AND PLACING TOPSOIL (4")
SY 1,053.000 $3.650 $3.000 $1.000 $10.000 $25.000 $15.000
BLOCK SODDING
SY 1,053.000 $4.960 $11.000 $3.000 $10.000 $10.000 $6.500
VEGETATIVE WATERING
MG 11.600 $5.430 $1.000 $7.000 $150.000 $10.000 $25.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 62.000 $61.950 $110.000 $100.000 $150.000 $202.000 $300.000
RETAINING WALL (CAST - IN - PLACE)
SF 104.000 $62.180 $75.000 $75.000 $200.000 $160.000 $300.000
MOBILIZATION
LS 1.000 $39,477.000 $70,189.000 $40,000.000 $50,000.000 $40,000.000 $60,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $9,891.300 $1,100.000 $7,000.000 $8,500.000 $5,000.000 $4,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $3.740 $1.000 $6.000 $4.000 $10.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.400 $1.000 $1.000 $2.000 $10.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 190.000 $4.900 $1.000 $3.000 $18.000 $20.000 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 190.000 $1.270 $1.000 $1.000 $9.000 $20.000 $1.500
CONC CURB & GUTTER (TY II)
LF 78.000 $105.000 $52.000 $30.000 $55.000 $70.000 $50.000
DRIVEWAYS (ACP)
SY 108.000 $41.110 $108.000 $120.000 $55.000 $153.000 $100.000
DRIVEWAYS (CONC) (HES)
SY 797.000 $113.000 $140.000 $120.000 $150.000 $125.500 $250.000
CONC SIDEWALKS (4")
SY 1,755.000 $78.360 $108.000 $120.000 $65.000 $70.000 $80.000
CURB RAMPS (TY 1)
EA 7.000 $1,995.000 $2,290.000 $2,000.000 $3,000.000 $4,000.000 $2,000.000
CURB RAMPS (TY 10)
EA 4.000 $1,824.970 $2,101.000 $2,400.000 $3,000.000 $4,000.000 $2,000.000
GROUND BOX TY A (122311)
EA 5.000 $708.750 $990.000 $1,000.000 $1,500.000 $990.000 $1,200.000
REMOVE GROUND BOX
EA 5.000 $420.000 $495.000 $500.000 $650.000 $495.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $814.000 $330.000 $800.000 $1,000.000 $2,500.000 $775.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,211.270 $165.000 $1,000.000 $1,000.000 $2,500.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $1,133.620 $660.000 $1,200.000 $1,000.000 $2,500.000 $1,225.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 8.000 $640.500 $110.000 $500.000 $1,000.000 $2,500.000 $450.000
REMOVE SM RD SN SUP&AM
EA 12.000 $111.050 $55.000 $200.000 $150.000 $100.000 $115.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 792.000 $7.480 $7.000 $8.000 $10.000 $6.600 $6.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 1.000 $137.640 $220.000 $200.000 $250.000 $220.000 $220.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 9.000 $0.630 $11.000 $0.500 $20.000 $11.000 $15.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 792.000 $6.300 $3.000 $5.000 $5.000 $3.300 $3.250
REFL PAV MRK TY II (W) (ARROW)
EA 1.000 $78.750 $110.000 $100.000 $250.000 $110.000 $120.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 9.000 $0.670 $11.000 $0.500 $20.000 $11.000 $12.000
ELIM EXT PAV MRK & MRKS (8")
LF 332.000 $2.100 $2.000 $1.000 $5.000 $2.200 $2.250
ELIM EXT PAV MRK & MRKS (24")
LF 174.000 $3.660 $3.000 $4.000 $5.000 $3.300 $3.250
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $60.250 $110.000 $50.000 $250.000 $110.000 $120.000
PAV SURF PREP FOR MRK (4")
LF 9.000 $0.110 $1.000 $0.500 $2.000 $1.100 $1.000
PAV SURF PREP FOR MRK (24")
LF 792.000 $2.360 $2.000 $1.000 $5.000 $2.200 $2.250
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $24.070 $83.000 $10.000 $250.000 $82.500 $75.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,280.000 $1.000 $10,000.000 $12,500.000 $15,000.000 $2,500.000
TMA (STATIONARY)
DAY 55.000 $196.000 $1.000 $200.000 $250.000 $300.000 $225.000
TMA (MOBILE OPERATION)
DAY 8.000 $215.000 $1.000 $300.000 $850.000 $300.000 $250.000
Totals: $435,667.188 $470,054.600 $505,702.700 $522,883.000 $531,895.700 $582,813.000