Show Job Controls
Bid Cobra

SMITH VA (0910-00-133)

Items: 73

County: SMITH
Length: N/A
Highway: VA
District: TYLER
Control Number: 0910-00-133
DBE Goal: N/A
Project: F 2022(963)
Guaranty: N/A
Time: 105 WORKING DAYS
Engineer's Estimate: $419,806.47
Date: 08/03/2022 (3 years ago)
Contract Number: N/A
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Mail/Deliver Bids To: N/A
WILL BUSKELL
STACY WYLIE1
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$419,806.47
$548,791.16
Over/Under Est: 30.72% $128,984.69
Over/Under Est: 102.57% $430,586.53
Amt Left: 54.96% $301,601.84
Subcontractor Percentage Amount
CLASSIC TEJAS CONSTRUCTION, INC. 2.49% $15,981.00
GRADY CRAWFORD CONSTRUCTION COMPANY, INC. 0.75% $4,813.55
Total: 3.24% $20,794.55

Bid Items & Bid Tabulations

73 Total 0 of 73
SMITH  |  VA  |  TYLER  |  0910-00-133  |  08/03/2022  |  $419,806.47  |  F 2022(963)  |  BICYCLE AND PEDESTRIAN IMPRVS  |  105 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ENCINO LANDSCAPE, INC.
FNH CONSTRUCTION, LLC
PREPARING ROW
STA 17.000 $1,000.000 $1,000.000 $3,000.000
PREP ROW (TREE)(24"-30"DIA)
EA 2.000 $2,000.000 $2,000.000 $5,000.000
REMOVING CONC (PAV)
SY 57.000 $3.100 $20.000 $50.000
REMOVING CONC (MEDIANS)
SY 103.000 $5.500 $20.000 $20.000
REMOVING CONC (SIDEWALKS)
SY 303.000 $4.900 $20.000 $20.000
REMOVING CONC (DRIVEWAYS)
SY 160.000 $14.500 $20.000 $20.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 298.000 $3.000 $20.000 $20.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 10.000 $19.000 $50.000 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 550.000 $1.000 $1.000 $10.000
BLOCK SODDING
SY 550.000 $4.000 $2.000 $10.000
VEGETATIVE WATERING
MG 0.006 $6.000 $10.000 $500,000.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 151.000 $40.000 $100.000 $150.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 30.000 $255.000 $300.000 $300.000
CL A CONC (MISC)
CY 19.000 $170.000 $600.000 $2,000.000
MOBILIZATION
LS 1.000 $37,165.130 $40,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $5,525.000 $6,000.000 $8,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,120.000 $2.900 $6.000 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,120.000 $0.650 $1.000 $2.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 65.000 $1.500 $1.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 65.000 $4.500 $4.000 $18.000
COLORED TEXTURED CONC (6")
SY 148.000 $75.000 $200.000 $200.000
CONC CURB (TY II)
LF 728.000 $30.000 $20.000 $55.000
CONC CURB (MONO) (TY II)
LF 78.000 $5.000 $20.000 $55.000
DRIVEWAYS (CONC) (HES)
SY 160.000 $80.000 $120.000 $150.000
CONC SIDEWALKS (4")
SY 577.000 $65.000 $100.000 $65.000
CURB RAMPS (TY 1)
EA 8.000 $1,790.000 $1,500.000 $3,000.000
CURB RAMPS (TY 2)
EA 9.000 $2,360.000 $2,500.000 $3,000.000
CURB RAMPS (TY 7)
EA 4.000 $1,000.000 $2,100.000 $3,000.000
CURB RAMPS (TY 10)
EA 7.000 $2,600.000 $2,400.000 $3,000.000
CURB RAMPS (TY 21)
EA 9.000 $1,900.000 $2,500.000 $3,000.000
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
SF 12.000 $60.000 $200.000 $500.000
RELOCATE EXISTING MAILBOX
EA 1.000 $500.000 $400.000 $1,500.000
IN RD IL (TY ST) 40T-10 (250W EQ) LED
EA 3.000 $6,000.000 $9,999.000 $7,000.000
CONDT (PVC) (SCH 40) (2")
LF 180.000 $12.000 $15.000 $20.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 160.000 $30.000 $35.000 $40.000
ELEC CONDR (NO.8) BARE
LF 370.000 $1.800 $2.000 $3.000
ELEC CONDR (NO.8) INSULATED
LF 530.000 $1.800 $2.000 $3.000
GROUND BOX TY D (162922)W/APRON
EA 2.000 $975.000 $1,000.000 $1,500.000
ELC SRV TY D 120/240 070(NS)AL(E)SP(O)
EA 2.000 $5,250.000 $8,000.000 $6,500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 38.000 $530.000 $600.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 6.000 $515.000 $750.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)UB(P)
EA 32.000 $550.000 $750.000 $1,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 1.000 $650.000 $600.000 $850.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 400.000 $0.850 $1.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,657.000 $6.000 $7.000 $8.000
REFL PAV MRK TY II (W) 8" (SLD)
LF 100.000 $0.250 $1.000 $2.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 237.000 $4.000 $5.000 $5.000
REFL PAV MRK TY II (W) (ARROW)
EA 1.000 $60.000 $100.000 $250.000
REFL PAV MRK TY II (W) (WORD)
EA 1.000 $75.000 $100.000 $250.000
REFL PAV MRK TY II (Y) 4" (SLD)
LF 546.000 $0.100 $0.500 $1.500
PAVEMENT SEALER 4"
LF 3,173.000 $0.100 $0.500 $0.500
PAVEMENT SEALER 8"
LF 500.000 $0.250 $0.500 $1.500
PAVEMENT SEALER 24"
LF 1,894.000 $2.000 $3.000 $5.000
PAVEMENT SEALER (ARROW)
EA 5.000 $25.000 $40.000 $250.000
PAVEMENT SEALER (WORD)
EA 5.000 $30.000 $40.000 $250.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 2,460.000 $0.350 $0.500 $1.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $200.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $245.000 $250.000 $300.000
PREFAB PAV MRK TY C (Y) (4") (SLD)
LF 167.000 $3.300 $4.000 $6.000
REFL PAV MRKR TY I-A
EA 72.000 $3.200 $4.000 $6.000
REFL PAV MRKR TY I-C
EA 25.000 $3.200 $4.000 $6.000
REFL PAV MRKR TY II-C-R
EA 35.000 $3.500 $5.000 $6.000
ELIM EXT PAV MRK & MRKS (4")
LF 2,442.000 $0.300 $0.500 $0.750
ELIM EXT PAV MRK & MRKS (24")
LF 121.000 $4.500 $4.000 $6.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 2.000 $35.000 $50.000 $200.000
PAV SURF PREP FOR MRK (4")
LF 3,006.000 $0.050 $0.100 $0.500
PAV SURF PREP FOR MRK (8")
LF 500.000 $0.100 $0.100 $0.750
PAV SURF PREP FOR MRK (24")
LF 1,894.000 $0.650 $0.500 $3.000
PAV SURF PREP FOR MRK (ARROW)
EA 5.000 $26.000 $10.000 $100.000
PAV SURF PREP FOR MRK (WORD)
EA 5.000 $27.000 $10.000 $100.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 56.000 $80.000 $100.000 $250.000
TMA (STATIONARY)
DAY 70.000 $150.000 $200.000 $350.000
TMA (MOBILE OPERATION)
DAY 140.000 $150.000 $150.000 $550.000
Totals: $419,806.466 $548,791.160 $850,393.000