PREPARING ROW
|
STA
|
57.730
|
$2,000.000
|
$1,000.000
|
$8,000.000
|
$2,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
876.000
|
$15.000
|
$6.700
|
$20.000
|
$18.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
123.000
|
$5.000
|
$9.000
|
$15.000
|
$18.000
|
|
|
REMOVING CONC (MISC)
|
SY
|
13.000
|
$20.000
|
$40.000
|
$30.000
|
$120.000
|
|
|
REMOVING CONC (PAVERS)
|
SY
|
37.000
|
$15.000
|
$30.000
|
$30.000
|
$85.000
|
|
|
REMOVING CONC (FLUME)
|
SY
|
70.000
|
$12.000
|
$15.000
|
$30.000
|
$45.000
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
3,686.000
|
$7.000
|
$5.000
|
$6.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
84,288.000
|
$10.000
|
$2.400
|
$6.750
|
$9.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
39,540.000
|
$10.000
|
$3.200
|
$8.000
|
$6.500
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
2,010.000
|
$12.000
|
$60.000
|
$10.000
|
$75.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
103,958.000
|
$2.000
|
$1.000
|
$0.900
|
$0.900
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
103,958.000
|
$1.000
|
$0.820
|
$0.820
|
$0.900
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
51,979.000
|
$1.000
|
$0.800
|
$0.820
|
$0.900
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
51,979.000
|
$1.000
|
$0.800
|
$0.820
|
$0.900
|
|
|
VEGETATIVE WATERING
|
MG
|
2,287.000
|
$15.000
|
$1.000
|
$7.000
|
$16.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
250.000
|
$2.250
|
$1.350
|
$2.000
|
$5.000
|
|
|
WILDFLOWER SEEDING
|
AC
|
22.000
|
$500.000
|
$1,900.000
|
$1,200.000
|
$1,300.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(11")
|
SY
|
56,107.000
|
$15.000
|
$20.500
|
$22.000
|
$20.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
532.000
|
$190.000
|
$175.000
|
$190.000
|
$170.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
29,554.000
|
$4.000
|
$1.750
|
$3.750
|
$3.000
|
|
|
CEMENT
|
TON
|
532.000
|
$165.000
|
$155.000
|
$155.000
|
$170.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
29,554.000
|
$4.000
|
$1.250
|
$2.250
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,222.000
|
$4.000
|
$4.000
|
$6.000
|
$4.500
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
2,071.000
|
$3.300
|
$3.650
|
$6.000
|
$3.500
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
22,521.000
|
$3.000
|
$3.000
|
$3.500
|
$3.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
536.000
|
$120.000
|
$130.000
|
$130.000
|
$120.000
|
|
|
D-GR HMA (SQ) TY-D PG64_22(LEVEL-UP)
|
TON
|
474.000
|
$120.000
|
$120.000
|
$114.000
|
$145.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
|
TON
|
6,667.000
|
$95.000
|
$85.000
|
$99.000
|
$120.000
|
|
|
SUPERPAVE MIXTURES SP-C PG70-22
|
TON
|
16,366.000
|
$90.000
|
$85.000
|
$97.000
|
$120.000
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
4,020.000
|
$2.500
|
$3.000
|
$3.000
|
$3.000
|
|
|
TBPFC (ASPHALT)(PG 76-22)
|
TON
|
56.000
|
$150.000
|
$420.000
|
$150.000
|
$195.000
|
|
|
TBPFC (AGGREGATE) (SAC-A)
|
TON
|
872.000
|
$150.000
|
$420.000
|
$150.000
|
$195.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
270.000
|
$55.000
|
$77.000
|
$50.000
|
$75.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,037.000
|
$2.000
|
$3.500
|
$4.000
|
$4.000
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
1,498.000
|
$2.000
|
$4.800
|
$4.000
|
$4.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
2,133.000
|
$2.000
|
$3.400
|
$4.000
|
$4.000
|
|
|
CEM STABIL BKFL
|
CY
|
50.000
|
$160.000
|
$250.000
|
$225.000
|
$212.000
|
|
|
CUT & RESTORING PAV
|
SY
|
196.000
|
$110.000
|
$105.000
|
$85.000
|
$79.500
|
|
|
FLOWABLE BACKFILL
|
CY
|
132.000
|
$150.000
|
$200.000
|
$225.000
|
$132.500
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
1,210.000
|
$4.500
|
$7.500
|
$5.000
|
$10.600
|
|
|
TEMPORARY SPL SHORING
|
SF
|
5,910.000
|
$20.000
|
$22.000
|
$35.000
|
$31.800
|
|
|
TEMPORARY SPL SHORING (SOIL NAIL)
|
SF
|
10,047.000
|
$20.000
|
$12.000
|
$15.000
|
$13.780
|
|
|
SOIL NAIL ANCHORS
|
LF
|
32,268.000
|
$15.000
|
$15.000
|
$15.000
|
$20.410
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
71.000
|
$75.000
|
$110.000
|
$100.000
|
$195.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
250.000
|
$150.000
|
$400.000
|
$375.000
|
$370.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
42.000
|
$100.000
|
$110.000
|
$90.000
|
$78.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
56.000
|
$150.000
|
$120.000
|
$175.000
|
$165.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
330.000
|
$700.000
|
$950.000
|
$500.000
|
$460.000
|
|
|
CL A CONC (MISC)
|
SY
|
611.000
|
$45.000
|
$45.000
|
$70.000
|
$40.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
5.000
|
$1,200.000
|
$700.000
|
$750.000
|
$1,100.000
|
|
|
CL C CONC (ABUT)(EXTEND)
|
CY
|
28.800
|
$1,600.000
|
$1,000.000
|
$950.000
|
$1,200.000
|
|
|
CL C CONC (CAP)
|
CY
|
13.400
|
$1,100.000
|
$1,150.000
|
$950.000
|
$1,600.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
9.700
|
$900.000
|
$1,215.000
|
$950.000
|
$1,700.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
128.000
|
$800.000
|
$515.000
|
$520.000
|
$800.000
|
|
|
CL E CONC (SEAL SLAB)(NON-REINF)
|
CY
|
30.000
|
$200.000
|
$425.000
|
$300.000
|
$430.000
|
|
|
REINF CONC SLAB (EXTEND SLAB)
|
SF
|
2,535.000
|
$35.000
|
$23.750
|
$28.000
|
$27.000
|
|
|
APPROACH SLAB
|
CY
|
29.100
|
$400.000
|
$550.000
|
$475.000
|
$1,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
32,252.000
|
$50.000
|
$46.000
|
$54.000
|
$74.000
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
12,736.000
|
$40.000
|
$30.000
|
$60.000
|
$43.000
|
|
|
PRESTR CONC GIRDER (TX28)
|
LF
|
334.540
|
$125.000
|
$170.000
|
$175.000
|
$170.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
47,595.000
|
$0.600
|
$0.840
|
$0.400
|
$0.820
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
524.100
|
$400.000
|
$360.000
|
$400.000
|
$424.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
20.000
|
$150.000
|
$235.000
|
$200.000
|
$265.000
|
|
|
RIPRAP (CONC)(FLUME)
|
CY
|
68.000
|
$450.000
|
$400.000
|
$500.000
|
$530.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
130.300
|
$500.000
|
$455.000
|
$450.000
|
$530.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$20,000.000
|
$600,000.000
|
$300,000.000
|
$603,670.000
|
|
|
RAIL (TY SSTR)
|
LF
|
3,510.600
|
$53.000
|
$60.000
|
$80.000
|
$95.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
38.000
|
$90.000
|
$60.000
|
$60.000
|
$95.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
478.000
|
$350.000
|
$350.000
|
$290.000
|
$498.200
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
222.000
|
$800.000
|
$600.000
|
$820.000
|
$1,113.000
|
|
|
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
|
LF
|
80.000
|
$2,000.000
|
$1,000.000
|
$1,500.000
|
$1,272.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,132.000
|
$50.000
|
$35.000
|
$40.000
|
$45.580
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
636.000
|
$70.000
|
$48.000
|
$50.000
|
$55.120
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
96.000
|
$100.000
|
$90.000
|
$105.000
|
$84.800
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
82.000
|
$90.000
|
$42.500
|
$50.000
|
$50.880
|
|
|
RC PIPE (CL IV)(36 IN)
|
LF
|
60.000
|
$120.000
|
$100.000
|
$150.000
|
$100.700
|
|
|
INLET (COMPL)(PCO)(5FT)(BOTH)
|
EA
|
5.000
|
$6,000.000
|
$5,750.000
|
$6,000.000
|
$4,218.800
|
|
|
INLET (COMPL)(PCU)(5FT)(BOTH)
|
EA
|
1.000
|
$6,000.000
|
$6,300.000
|
$6,500.000
|
$4,717.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$3,400.000
|
$4,500.000
|
$5,000.000
|
$3,195.900
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$4,000.000
|
$5,200.000
|
$6,000.000
|
$3,879.600
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
4.000
|
$4,500.000
|
$6,150.000
|
$6,000.000
|
$4,515.600
|
|
|
WINGWALL (FW - 0) (HW=4 FT)
|
EA
|
1.000
|
$5,000.000
|
$8,000.000
|
$5,000.000
|
$9,858.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
1.000
|
$7,000.000
|
$12,000.000
|
$9,000.000
|
$17,808.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$12,000.000
|
$18,000.000
|
$20,000.000
|
$71,020.000
|
|
|
WINGWALL (PW - 2) (HW=9 FT)
|
EA
|
1.000
|
$25,000.000
|
$24,000.000
|
$40,000.000
|
$46,640.000
|
|
|
HEADWALL (CH - PW - 0)(DIA= 24 IN)(MOD)
|
EA
|
1.000
|
$5,000.000
|
$3,850.000
|
$3,000.000
|
$4,770.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$600.000
|
$545.000
|
$500.000
|
$795.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$700.000
|
$600.000
|
$575.000
|
$795.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$700.000
|
$600.000
|
$575.000
|
$795.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,200.000
|
$900.000
|
$1,000.000
|
$954.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$3,600.000
|
$2,500.000
|
$3,500.000
|
$1,590.000
|
|
|
REMOV STR (SET)
|
EA
|
9.000
|
$400.000
|
$150.000
|
$500.000
|
$530.000
|
|
|
REMOV STR (PIPE)
|
EA
|
7.000
|
$500.000
|
$700.000
|
$500.000
|
$1,007.000
|
|
|
REMOVE STR (JUNCTION BOX)
|
EA
|
1.000
|
$600.000
|
$600.000
|
$1,000.000
|
$795.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
2.000
|
$500.000
|
$300.000
|
$500.000
|
$583.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,100,000.000
|
$1,100,000.000
|
$1,100,000.000
|
$1,300,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$8,000.000
|
$5,000.000
|
$8,000.000
|
$8,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
595.000
|
$25.000
|
$23.000
|
$26.000
|
$44.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
50.000
|
$28.000
|
$27.500
|
$35.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
645.000
|
$8.000
|
$8.800
|
$2.000
|
$5.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
336.000
|
$20.000
|
$23.000
|
$25.000
|
$24.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
336.000
|
$8.000
|
$9.900
|
$2.000
|
$3.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
175.000
|
$25.000
|
$25.000
|
$40.000
|
$18.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
320.000
|
$110.000
|
$150.000
|
$75.000
|
$75.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,888.000
|
$3.250
|
$1.800
|
$3.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,888.000
|
$1.000
|
$0.550
|
$0.500
|
$1.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
795.000
|
$5.000
|
$3.850
|
$6.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
795.000
|
$1.500
|
$0.800
|
$0.500
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
320.000
|
$110.000
|
$150.000
|
$125.000
|
$95.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,053.000
|
$75.000
|
$75.000
|
$87.000
|
$80.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
8,940.000
|
$25.000
|
$80.000
|
$75.000
|
$70.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,430.000
|
$5.000
|
$11.500
|
$10.000
|
$12.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
8,940.000
|
$10.000
|
$9.500
|
$6.000
|
$13.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
2,107.000
|
$55.000
|
$80.000
|
$85.000
|
$70.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
8,261.000
|
$20.000
|
$20.000
|
$21.000
|
$21.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
163.000
|
$35.000
|
$35.000
|
$100.000
|
$52.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
810.000
|
$0.500
|
$4.400
|
$2.000
|
$10.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,700.000
|
$20.000
|
$24.750
|
$21.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,000.000
|
$1,675.000
|
$1,800.000
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,000.000
|
$1,375.000
|
$1,200.000
|
$1,200.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,162.500
|
$3.000
|
$4.400
|
$3.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
7.000
|
$200.000
|
$120.000
|
$300.000
|
$320.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
3.000
|
$300.000
|
$275.000
|
$200.000
|
$270.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$275.000
|
$300.000
|
$270.000
|
|
|
GDRAIL END TRT(INST)(WOOD POST)(TY II)
|
EA
|
9.000
|
$2,600.000
|
$2,650.000
|
$3,000.000
|
$2,800.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
11.000
|
$10,000.000
|
$13,500.000
|
$12,000.000
|
$13,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,100.000
|
$3,400.000
|
$2,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
11.000
|
$750.000
|
$1,050.000
|
$600.000
|
$2,000.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
2,000.000
|
$25.000
|
$32.000
|
$42.000
|
$30.000
|
|
|
HI MST IL POLE (175 FT)( 80 MPH)
|
EA
|
10.000
|
$30,000.000
|
$50,000.000
|
$32,000.000
|
$31,000.000
|
|
|
HI MST IL ASM (12-400W)(SYM)
|
EA
|
11.000
|
$30,000.000
|
$31,000.000
|
$28,000.000
|
$28,000.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
4,395.000
|
$8.000
|
$5.500
|
$12.000
|
$11.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
460.000
|
$20.000
|
$24.000
|
$28.000
|
$27.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
15,300.000
|
$2.000
|
$3.450
|
$2.200
|
$2.100
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
17.000
|
$800.000
|
$640.000
|
$1,500.000
|
$1,400.000
|
|
|
ELC SRV TY A 240/480 060(NS)AL(T)OC(O)
|
EA
|
2.000
|
$8,000.000
|
$6,050.000
|
$9,000.000
|
$8,200.000
|
|
|
ELC SRV TY A 240/480 100(NS)AL(T)OC(O)
|
EA
|
1.000
|
$8,000.000
|
$6,050.000
|
$9,000.000
|
$8,300.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
60.000
|
$20.000
|
$20.000
|
$22.000
|
$22.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
615.500
|
$22.000
|
$30.000
|
$27.000
|
$27.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$600.000
|
$650.000
|
$700.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
13.000
|
$575.000
|
$725.000
|
$800.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
5.000
|
$875.000
|
$800.000
|
$900.000
|
$920.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
14.000
|
$875.000
|
$945.000
|
$1,000.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$900.000
|
$930.000
|
$1,200.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
12.000
|
$350.000
|
$440.000
|
$500.000
|
$490.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
9.000
|
$450.000
|
$530.000
|
$600.000
|
$570.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,600.000
|
$2,750.000
|
$3,500.000
|
$3,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
37.000
|
$85.000
|
$135.000
|
$200.000
|
$180.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,583.300
|
$5.750
|
$6.300
|
$4.700
|
$4.700
|
|
|
RELOCATE LRSA
|
EA
|
5.000
|
$3,300.000
|
$35,000.000
|
$3,200.000
|
$3,100.000
|
|
|
REMOVE LRSA
|
EA
|
10.000
|
$825.000
|
$1,330.000
|
$800.000
|
$750.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 2(WC)GND
|
EA
|
18.000
|
$50.000
|
$70.000
|
$50.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
63.000
|
$20.000
|
$33.000
|
$20.000
|
$30.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
13.000
|
$70.000
|
$70.000
|
$50.000
|
$60.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
45.000
|
$32.000
|
$50.000
|
$30.000
|
$60.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
1,351.000
|
$0.250
|
$0.280
|
$0.270
|
$0.270
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
24,890.000
|
$0.250
|
$0.160
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
27,796.000
|
$0.200
|
$0.160
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
678.000
|
$1.000
|
$2.200
|
$2.200
|
$2.120
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
70.000
|
$1.500
|
$1.200
|
$2.000
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
300.000
|
$1.300
|
$1.100
|
$1.100
|
$1.060
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
6,839.000
|
$0.800
|
$0.900
|
$1.000
|
$0.890
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
70.000
|
$5.500
|
$6.000
|
$6.000
|
$5.830
|
|
REFL PAV MRK TY I(W)(EXIT GORE)(100MIL)
|
EA
|
2.000
|
$640.000
|
$825.000
|
$800.000
|
$795.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
28.000
|
$55.000
|
$44.000
|
$44.000
|
$42.400
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,587.000
|
$0.350
|
$1.100
|
$1.100
|
$1.060
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
16,360.000
|
$0.300
|
$0.550
|
$0.550
|
$0.530
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
4,515.000
|
$0.500
|
$1.100
|
$1.100
|
$1.060
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
13,605.000
|
$0.300
|
$0.550
|
$0.550
|
$0.530
|
|
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
|
LF
|
175.000
|
$2.500
|
$3.850
|
$4.000
|
$3.710
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
4.000
|
$200.000
|
$235.000
|
$250.000
|
$227.900
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
1.000
|
$370.000
|
$365.000
|
$400.000
|
$355.100
|
|
PREFAB PAV MRK TY C (W) (UTURN ARROW)
|
EA
|
4.000
|
$235.000
|
$390.000
|
$400.000
|
$376.300
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$260.000
|
$245.000
|
$250.000
|
$238.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
46.000
|
$3.000
|
$4.400
|
$5.000
|
$4.240
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
400.000
|
$3.000
|
$4.400
|
$5.000
|
$4.240
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
5,371.000
|
$0.500
|
$0.330
|
$0.330
|
$0.320
|
|
|
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
|
SF
|
35,874.000
|
$0.800
|
$2.000
|
$0.900
|
$1.880
|
|
|
INSTALL LUMINAIRE 400 W EQ (LED)
|
EA
|
132.000
|
$1,000.000
|
$1,925.000
|
$1,800.000
|
$1,800.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$12,000.000
|
$15,000.000
|
$9,000.000
|
$12,000.000
|
|
|
RELOCATE HIGH MAST LIGHTING (150 FT)
|
EA
|
1.000
|
$20,000.000
|
$16,500.000
|
$13,000.000
|
$13,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$200.000
|
$100.000
|
$200.000
|
$300.000
|
|
Totals: |
$14,229,479.375
|
$14,842,182.970
|
$16,028,348.800
|
$17,871,388.990
|