Job Info for 0245-06-087

County: SMITH Highway: SH 64 Date: 08/03/2022 (2 years ago) Engineer's Estimate: $1,767,280 Control Number: 0245-06-087
Project: STP 2022(809)HES District: TYLER Time: 115 WORKING DAYS Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,767,279.58
L. S. EQUIPMENT CO., INC.   $2,208,247.24 1
24.95% | $440,967.66
REYNOLDS & KAY, LTD.   $2,213,322.79 2
25.24% | $446,043.21
0.23% | $5,075.55
EAST TEXAS BRIDGE, INC.   $2,583,560.00 3
46.19% | $816,280.42
17% | $375,312.76
16.73% | $370,237.21
TEXAS MATERIALS GROUP, INC.   $2,617,266.84 4
48.1% | $849,987.26
18.52% | $409,019.60
1.30% | $33,706.84
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 1.94% $42,840.00
J.C. JOHNSON CONSTRUCTION 1.88% $41,515.05
ISAACS CONSTRUCTION SERVICES LLC 0.98% $21,640.82
CAP RIVER LLC 0.72% $15,899.38
PANOLA SIGN & BARRICADE, INC. 0.46% $10,157.94
PINNACLE GRINDING AND GROOVING LLC 0.39% $8,612.16
SOUTHWEST ENVIRONMENT SERVICES LLC 0.30% $6,624.74
Total: 6.67% $147,290.09

Bid Items

Items: 91, 0 filtered
SMITH SH 64  |  TYLER  |  0245-06-087  |  08/03/2022  |  $1,767,280  |  STP 2022(809)HES  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT T  |  115 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate L. S. EQUIPMENT CO., INC. REYNOLDS & KAY, LTD. EAST TEXAS BRIDGE, INC. TEXAS MATERIALS GROUP, INC.
100 6002 PREPARING ROW STA 10.000 $1,000.000 $1,560.000 $2,100.000 $15,000.000 $10,000.000
110 6001 EXCAVATION (ROADWAY) CY 4,900.000 $8.000 $12.000 $8.000 $10.000 $9.000
132 6021 EMBANKMENT (VEHICLE)(ORD COMP)(TY C) CY 5,451.000 $26.000 $20.000 $4.000 $18.000 $19.000
150 6001 BLADING STA 32.700 $200.000 $125.000 $150.000 $300.000 $200.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 10,883.000 $2.000 $1.000 $2.000 $1.500 $1.350
162 6002 BLOCK SODDING SY 100.000 $10.000 $5.000 $7.500 $10.000 $11.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 5,442.000 $0.200 $0.400 $0.150 $0.250 $0.550
164 6054 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 10,883.000 $0.850 $0.750 $0.850 $0.800 $0.780
164 6055 BONDED FBR MTRX SEED (TEMP)(WARM) SY 5,442.000 $0.650 $0.750 $0.800 $0.800 $0.750
164 6056 BONDED FBR MTRX SEED (TEMP)(COOL) SY 5,442.000 $0.650 $0.750 $0.800 $0.800 $0.750
168 6001 VEGETATIVE WATERING MG 299.000 $11.500 $0.010 $5.000 $25.000 $36.000
260 6001 LIME (HYDRATED LIME (DRY)) TON 43.000 $220.000 $300.000 $300.000 $500.000 $265.000
260 6027 LIME TRT (EXST MATL)(8") SY 2,882.000 $4.000 $6.000 $8.000 $10.000 $10.000
275 6001 CEMENT TON 49.000 $180.000 $600.000 $255.000 $300.000 $235.000
275 6011 CEMENT TREAT(EXIST MATL)(8") SY 2,882.000 $4.000 $5.000 $6.500 $8.000 $6.000
314 6012 EMULS ASPH (EROSN CONT)(CSS-1) GAL 435.000 $3.700 $5.000 $6.000 $7.000 $4.450
316 6406 ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR) GAL 7,838.000 $3.050 $6.000 $5.000 $5.000 $6.550
316 6407 AGGR (TY-PD GR-3 OR TY-PL GR-3) CY 187.000 $111.000 $150.000 $165.000 $135.000 $130.000
351 6002 FLEXIBLE PAVEMENT STRUCTURE REPAIR(6") SY 1,000.000 $56.000 $4.000 $72.000 $65.000 $66.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 1,600.000 $5.000 $5.000 $6.500 $6.000 $3.250
354 6045 PLANE ASPH CONC PAV (2") SY 2,499.000 $2.200 $4.000 $7.500 $6.000 $4.450
420 6071 CL C CONC (COLLAR) EA 3.000 $1,200.000 $1,800.000 $1,000.000 $1,500.000 $1,540.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 310.000 $140.000 $200.000 $135.000 $225.000 $185.000
462 6059 CONC BOX CULV (7 FT X 4 FT)(EXTEND) LF 34.000 $600.000 $950.000 $800.000 $1,000.000 $855.000
464 6003 RC PIPE (CL III)(18 IN) LF 378.000 $55.000 $60.000 $55.000 $55.000 $55.000
464 6005 RC PIPE (CL III)(24 IN) LF 70.000 $70.000 $130.000 $75.000 $75.000 $125.000
464 6007 RC PIPE (CL III)(30 IN) LF 6.000 $90.000 $300.000 $130.000 $100.000 $206.000
464 6008 RC PIPE (CL III)(36 IN) LF 42.000 $101.000 $275.000 $150.000 $150.000 $235.000
466 6007 HEADWALL (CH - FW - 0) (DIA= 30 IN) EA 1.000 $4,750.000 $8,500.000 $5,000.000 $5,000.000 $6,300.000
466 6195 WINGWALL (PW - 2) (HW=6 FT) EA 1.000 $10,000.000 $15,000.000 $22,000.000 $10,000.000 $11,500.000
467 6249 SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C) EA 1.000 $10,140.000 $15,000.000 $16,000.000 $10,000.000 $12,000.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 24.000 $650.000 $995.000 $950.000 $750.000 $900.000
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 4.000 $1,400.000 $1,200.000 $1,500.000 $1,200.000 $1,035.000
467 6422 SET (TY II) (30 IN) (RCP) (6: 1) (C) EA 1.000 $2,000.000 $2,990.000 $2,300.000 $2,000.000 $2,650.000
467 6450 SET (TY II) (36 IN) (RCP) (4: 1) (C) EA 1.000 $4,000.000 $4,000.000 $2,500.000 $2,500.000 $3,200.000
467 6453 SET (TY II) (36 IN) (RCP) (6: 1) (C) EA 1.000 $4,500.000 $5,000.000 $4,500.000 $3,300.000 $3,700.000
467 6454 SET (TY II) (36 IN) (RCP) (6: 1) (P) EA 2.000 $4,500.000 $4,900.000 $4,500.000 $5,500.000 $4,250.000
480 6001 CLEAN EXIST CULVERTS EA 1.000 $2,000.000 $1,000.000 $2,300.000 $2,000.000 $1,650.000
496 6016 REMOV STR (PIPE) EA 13.000 $250.000 $500.000 $500.000 $1,000.000 $650.000
500 6001 MOBILIZATION LS 1.000 $89,054.300 $95,950.000 $263,500.000 $250,000.000 $260,003.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $5,000.000 $2,000.000 $4,500.000 $15,000.000 $39,769.000
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 240.000 $28.000 $50.000 $30.000 $35.000 $31.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 120.000 $32.000 $35.000 $36.000 $40.000 $37.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 360.000 $10.500 $15.000 $8.000 $8.000 $11.000
506 6029 EARTHWORK (EROSN & SEDMT CONT, IN VEH) CY 100.000 $20.000 $150.000 $15.000 $50.000 $6.250
506 6030 BACKHOE WORK (EROSION & SEDMT CONT) HR 100.000 $75.000 $125.000 $60.000 $65.000 $1.050
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 2,500.000 $3.000 $3.500 $3.000 $4.000 $3.250
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 2,500.000 $1.500 $1.000 $0.500 $0.500 $1.050
506 6046 TRACKHOE WORK (EROSION & SEDMT CONT) HR 100.000 $95.000 $125.000 $100.000 $85.000 $0.110
530 6002 INTERSECTIONS (ACP) SY 194.000 $38.000 $45.000 $57.510 $65.000 $44.000
530 6005 DRIVEWAYS (ACP) SY 1,442.000 $40.000 $55.000 $44.620 $45.000 $49.000
530 6008 TURNOUTS (ACP) SY 22.000 $75.000 $55.000 $79.980 $100.000 $44.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 6,128.000 $0.200 $1.000 $0.850 $1.000 $0.520
533 6002 RUMBLE STRIPS (CENTERLINE) LF 3,064.000 $0.200 $1.000 $1.000 $1.000 $0.520
560 6004 MAILBOX INSTALL-S (TWG-POST) TY 2 EA 12.000 $250.000 $300.000 $405.000 $400.000 $365.000
560 6005 MAILBOX INSTALL-D (TWG-POST) TY 2 EA 3.000 $260.000 $350.000 $450.000 $500.000 $420.000
560 6006 MAILBOX INSTALL-M (TWG-POST) TY 2 EA 4.000 $425.000 $500.000 $830.000 $700.000 $740.000
618 6023 CONDT (PVC) (SCH 40) (2") LF 40.000 $10.000 $20.000 $23.000 $25.000 $22.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 4.000 $625.000 $1,000.000 $950.000 $1,200.000 $900.000
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 5.000 $300.000 $500.000 $540.000 $900.000 $500.000
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 1.000 $440.000 $500.000 $700.000 $1,000.000 $640.000
644 6076 REMOVE SM RD SN SUP&AM EA 10.000 $82.000 $200.000 $120.000 $150.000 $115.000
658 6100 INSTL OM ASSM (OM-2Z)(WFLX)GND(BI) EA 8.000 $55.000 $150.000 $85.000 $200.000 $82.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 6,530.000 $0.150 $0.500 $0.550 $0.550 $0.550
662 6012 WK ZN PAV MRK NON-REMOV (W)8"(SLD) LF 2,530.000 $0.300 $0.500 $0.550 $0.550 $0.550
662 6016 WK ZN PAV MRK NON-REMOV (W)24"(SLD) LF 105.000 $3.600 $5.000 $4.500 $5.000 $4.350
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 8,596.000 $0.200 $0.600 $0.550 $0.550 $0.550
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 105.000 $7.000 $16.000 $9.000 $9.000 $8.250
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 127.000 $0.820 $1.500 $1.150 $2.000 $1.080
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 860.000 $0.550 $1.500 $1.150 $2.000 $1.080
662 6112 WK ZN PAV MRK SHT TERM RMV (W)(4") LF 567.000 $1.450 $3.000 $1.450 $2.000 $1.050
662 6113 WK ZN PAV MRK SHT TERM RMV (Y)(4") LF 1,935.000 $1.300 $3.000 $1.450 $2.000 $1.050
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 2,530.000 $0.750 $1.100 $1.150 $1.100 $1.050
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 6,530.000 $0.350 $1.100 $1.150 $1.100 $1.050
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 8,596.000 $0.400 $1.100 $1.150 $1.100 $1.050
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 105.000 $12.000 $16.000 $17.000 $20.000 $16.000
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 10.000 $180.000 $250.000 $260.000 $300.000 $245.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 10.000 $260.000 $300.000 $295.000 $300.000 $265.000
668 6101 PREFAB PAV MRK TY C (Y) (4") (SLD) LF 300.000 $2.000 $5.000 $5.500 $6.000 $5.250
672 6007 REFL PAV MRKR TY I-C EA 127.000 $3.720 $5.000 $4.500 $5.000 $4.250
672 6009 REFL PAV MRKR TY II-A-A EA 430.000 $3.150 $5.000 $4.500 $5.000 $4.250
684 6009 TRF SIG CBL (TY A)(12 AWG)(4 CONDR) LF 40.000 $2.200 $20.000 $7.000 $7.000 $6.350
685 6002 RELOCATE RDSD FLASH BEACON ASSEMBLY EA 2.000 $3,500.000 $2,500.000 $2,400.000 $3,000.000 $2,100.000
3077 6001 SP MIXES SP-B PG64-22 TON 4,197.000 $100.000 $150.000 $143.000 $145.000 $136.000
3077 6011 SP MIXES SP-C PG64-22 TON 843.000 $100.000 $160.000 $147.000 $147.000 $143.000
3077 6022 SP MIXES SP-C SAC-A PG70-22 TON 2,053.000 $108.000 $170.000 $160.000 $160.000 $155.000
3077 6044 SP MIXES SP-D PG64-22 (LEVEL-UP) TON 386.000 $150.000 $175.000 $155.000 $170.000 $180.000
3077 6075 TACK COAT GAL 2,233.000 $3.600 $5.000 $4.750 $5.000 $4.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 134.000 $102.000 $92.000 $85.000 $150.000 $60.000
6185 6002 TMA (STATIONARY) DAY 50.000 $200.000 $178.000 $90.000 $300.000 $295.000
6185 6005 TMA (MOBILE OPERATION) DAY 20.000 $5,000.000 $223.000 $85.000 $300.000 $245.000
Totals: $1,767,279.58 $2,208,247.24 $2,213,322.79 $2,583,560.00 $2,617,266.84