Show Job Controls
Bid Cobra

SMITH US 69 (0191-01-094)

Items: 100

County: SMITH
Length: N/A
Highway: US 69
District: TYLER
Control Number: 0191-01-094
DBE Goal: N/A
Project: C 191-1-94
Guaranty: N/A
Time: 134 WORKING DAYS
Engineer's Estimate: $5,780,392.30
Date: 02/02/2023 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$5,780,392.30
Over/Under Est: 34.91% $2,017,745.47
Over/Under Est: 55.7% $3,219,617.70
Amt Left: 15.41% $1,201,872.23
Subcontractor Percentage Amount
BAKER & COMPANY CONSTRUCTION, LLC 10.40% $816,554.45
STRIPING TECHNOLOGY, L.P. 2.70% $211,990.10
JM YANEZ CONSTRUCTION, INC. 2.65% $208,064.36
TRUE ROADS CONSTRUCTION LLC 2.35% $184,509.90
MORRIS COUNTY CONTRACTORS, L.L.C. 1.33% $104,424.75
INNOVATIVE ROADWAY SOLUTIONS, LLC 1.13% $88,721.78
PANOLA SIGN & BARRICADE, INC. 1.04% $81,655.45
RED BARON BUILDING COMPANY, LLC 0.81% $63,597.03
SOUTHWEST ENVIRONMENT SERVICES LLC 0.73% $57,315.84
ISAACS CONSTRUCTION SERVICES LLC 0.22% $17,273.27
SURFACE PREPARATION TECHNOLOGIES, LLC 0.21% $16,488.12
AABA MOWING CONTRACTORS, LIMITED LIABILITY COMPANY 0.10% $7,851.49
CAP RIVER LLC 0.00% $0.00
Total: 23.67% $1,858,446.54

Bid Items & Bid Tabulations

100 Total 0 of 100
SMITH  |  US 69  |  TYLER  |  0191-01-094  |  02/02/2023  |  $5,780,392.30  |  C 191-1-94  |  REHAB EXIST ROADWAY  |  134 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 5.000 $3,000.000 $30,000.000 $10,000.000
REMOVING CONC (MEDIANS)
SY 8.000 $20.000 $136.500 $300.000
REMOVING STB BASE AND ASPH PAV(10-14")
SY 500.000 $7.000 $30.000 $30.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 135.000 $20.240 $103.650 $30.000
EMBANKMENT (VEHICLE)(DENS CONT)(TY C)
CY 5,700.000 $3.500 $49.000 $30.000
BACKFILL (TY A)
STA 307.000 $282.970 $700.000 $300.000
BLADING
HR 50.000 $159.160 $130.000 $300.000
FURNISHING AND PLACING TOPSOIL (4")
SY 20,200.000 $1.070 $16.000 $2.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 10,650.000 $0.130 $0.120 $0.150
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 19,100.000 $0.520 $0.660 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 10,650.000 $0.700 $0.630 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 10,650.000 $0.690 $0.610 $0.750
VEGETATIVE WATERING
MG 444.000 $9.500 $29.000 $40.000
CEMENT
TON 46.000 $231.000 $310.000 $400.000
CEMENT TREAT (EXIST MATL) (6")
SY 3,533.000 $12.000 $14.000 $7.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 3,030.000 $8.030 $5.000 $8.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 4,300.000 $61.000 $86.000 $90.000
PLANE ASPH CONC PAV (1.5")
SY 1,758.000 $5.480 $8.880 $10.000
PLANE ASPH CONC PAV (2")
SY 72,077.000 $4.990 $3.840 $7.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 2,838.000 $6.510 $11.260 $10.000
CEM STABIL BKFL
CY 30.000 $217.600 $500.000 $600.000
CUT & RESTORE ASPH PAVING
SY 100.000 $250.000 $402.000 $450.000
FLOWABLE BACKFILL
CY 79.000 $190.070 $435.000 $1,000.000
CL A CONC (MISC)
SY 587.000 $300.000 $183.000 $300.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 34.000 $195.850 $378.000 $500.000
RIPRAP (CONC)(5 IN)
CY 3.000 $625.000 $945.000 $2,000.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 90.000 $425.000 $225.000 $400.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 134.000 $150.000 $277.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 53.000 $540.000 $650.000 $700.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 520.000 $45.000 $100.000 $50.000
RETROFIT RAIL (ADD HSS)
LF 413.000 $123.490 $150.000 $300.000
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
LF 12.000 $849.000 $1,075.000 $2,000.000
RC PIPE (CL III)(18 IN)
LF 239.000 $59.900 $130.000 $65.000
RC PIPE (CL III)(24 IN)
LF 76.000 $76.000 $135.000 $85.000
RC PIPE (CL III)(48 IN)
LF 115.000 $238.000 $237.000 $300.000
INLET (COMPL)(PSL)(FG)(8FTX8FT-4FTX4FT)
EA 1.000 $10,200.000 $18,750.000 $30,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000 $871.000 $1,800.000 $800.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 3.000 $1,251.000 $2,200.000 $1,500.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 1.000 $10,000.000 $16,500.140 $13,000.000
MOBILIZATION
LS 1.000 $515,633.010 $785,000.000 $800,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,000.000 $35,000.000 $50,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 80.000 $30.710 $30.500 $50.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 240.000 $32.000 $35.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 320.000 $8.110 $10.000 $15.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 40.000 $45.000 $115.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 40.000 $72.000 $115.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,000.000 $2.900 $3.150 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,000.000 $0.600 $1.050 $1.000
CONC CURB (MONO) (TY II)
LF 805.000 $11.500 $70.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 32,188.000 $0.300 $0.200 $1.000
RUMBLE STRIPS (CENTERLINE)
LF 16,094.000 $0.380 $0.200 $2.000
MTL W-BEAM GD FEN (STEEL POST)
LF 625.000 $29.000 $35.250 $40.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $2,000.000 $2,257.500 $2,600.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 2.000 $996.050 $892.500 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 820.000 $5.000 $3.250 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $150.000 $210.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,000.000 $3,123.750 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $350.000 $210.000 $255.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 25.000 $715.000 $705.600 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 4.000 $686.000 $762.300 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $845.000 $762.300 $800.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000 $900.000 $1,058.400 $1,500.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 2.000 $650.000 $565.950 $600.000
REMOVE SM RD SN SUP&AM
EA 15.000 $90.000 $98.700 $150.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $37.000 $26.250 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 11.000 $150.000 $47.250 $75.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 14,866.000 $0.310 $1.580 $1.700
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,866.000 $0.320 $1.580 $1.700
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 7,531.000 $1.400 $1.560 $2.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 7,531.000 $1.020 $1.630 $2.000
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 823.000 $1.200 $1.050 $1.100
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
LF 539.000 $1.500 $1.050 $1.100
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 14,294.000 $1.020 $1.050 $1.100
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 34,812.000 $0.660 $0.680 $0.750
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 33,794.000 $0.540 $0.680 $0.750
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 35,108.000 $0.590 $0.680 $0.750
PREFAB PAV MRK TY C (W) (12") (SLD)
LF 2,129.000 $5.000 $8.400 $10.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 1,072.000 $12.000 $13.650 $15.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 85.000 $204.590 $195.040 $200.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 4.000 $372.220 $278.850 $300.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 8.000 $400.000 $305.100 $350.000
PREFAB PAV MRK TY C (W) (WORD)
EA 89.000 $231.660 $233.680 $26.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 140.000 $50.000 $35.440 $36.000
PREFAB PAV MRK TY C (Y) (12") (SLD)
LF 493.000 $7.450 $8.400 $10.000
REFL PAV MRKR TY I-C
EA 586.000 $4.850 $3.780 $5.000
REFL PAV MRKR TY II-A-A
EA 474.000 $3.940 $3.780 $5.000
REFL PAV MRKR TY II-C-R
EA 586.000 $4.150 $3.780 $5.000
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
AC 0.500 $3,000.000 $16,800.000 $50,000.000
MEMBRANE UNDERSEAL
GAL 14,415.000 $5.000 $4.130 $7.000
FRICTIONAL ASPH SURF PRESERV TRTMT
SY 25,048.000 $1.450 $3.180 $4.000
SP MIXES SP-B PG64-22
TON 2,481.000 $175.000 $210.000 $220.000
SP MIXES SP-C SAC-A PG70-22
TON 7,928.000 $175.000 $192.840 $220.000
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 520.000 $215.000 $255.000 $350.000
TACK COAT
GAL 1,075.000 $3.210 $7.010 $6.000
TBPFC (MEMBRANE)
GAL 23,005.000 $5.660 $4.130 $8.000
TBPFC PG76-22 SAC-A
TON 5,752.000 $217.910 $250.000 $350.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $10,050.000 $18,000.000 $50,000.000
TMA (STATIONARY)
DAY 140.000 $244.000 $125.000 $300.000
TMA (MOBILE OPERATION)
DAY 45.000 $419.000 $250.000 $300.000
REML & DISPL DRIFTWOOD & DEBRIS
CY 10.000 $100.000 $350.000 $2,000.000
Totals: $5,780,392.300 $7,798,137.770 $9,000,010.000