SMITH US 69 (0191-01-063)

Items: 195

County: SMITH
Length: N/A
Highway: US 69
District: TYLER
Control Number: 0191-01-063
DBE Goal: N/A
Project: NH 2013(216)
Guaranty: N/A
Time: 430 WORKING DAYS
Engineer's Estimate: $16,519,021.48
Date: 08/08/2018 (7 years ago)
Contract Number: N/A
Type: GR,STRS,ACP BS&SURF,MBGF,SIGNALS,PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$16,519,021.48
$16,738,120.33
Over/Under Est: 1.33% $219,098.85
$17,864,235.85
Over/Under Est: 8.14% $1,345,214.37
Amt Left: 6.73% $1,126,115.52
Over/Under Est: 14.68% $2,424,390.54
Amt Left: 13.18% $2,205,291.69
Delta: -6.04% -$1,079,176.17
Over/Under Est: 29.97% $4,951,192.22
Amt Left: 28.27% $4,732,093.37
Delta: -13.34% -$2,526,801.68

Bid Items & Bid Tabulations

195 Total 0 of 195
SMITH  |  US 69  |  TYLER  |  0191-01-063  |  08/08/2018  |  $16,519,021.48  |  NH 2013(216)  |  GR,STRS,ACP BS&SURF,MBGF,SIG,PV MK  |  430 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
A. L. HELMCAMP, INC.
ARCHER WESTERN CONSTRUCTION, LLC
JB JAMES CONSTRUCTION LLC
PREPARING ROW
STA 65.090 $2,100.000 $3,000.000 $2,000.000 $15,500.000 $2,500.000
REMOVING CONC (RIPRAP)
SY 130.000 $20.000 $19.750 $22.000 $8.330 $60.000
REMOVING STAB BASE & ASPH PAV (6" - 8")
SY 26,743.000 $5.000 $3.500 $3.000 $3.700 $12.000
EXCAVATION (ROADWAY)
CY 20,121.000 $8.000 $5.500 $9.000 $17.000 $20.000
EXCAVATION (SPECIAL)
CY 19,500.000 $8.000 $7.000 $10.000 $7.600 $15.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 51,283.000 $10.000 $7.750 $11.000 $11.000 $40.000
FURNISHING AND PLACING TOPSOIL (4")
SY 9,700.000 $2.500 $1.250 $2.000 $0.820 $4.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 154,000.000 $1.200 $0.820 $0.900 $0.670 $0.750
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 31,000.000 $1.200 $0.820 $0.900 $0.650 $0.750
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 31,000.000 $1.200 $0.820 $0.900 $0.650 $0.750
VEGETATIVE WATERING
MG 1,754.000 $12.000 $1.000 $19.000 $12.000 $15.000
CEMENT
TON 819.000 $140.000 $160.000 $145.000 $137.290 $150.000
CEMENT TREAT (SUBGRADE) (8")
SY 45,508.000 $3.000 $1.850 $4.300 $5.170 $4.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 26,292.000 $3.000 $4.000 $4.000 $2.700 $4.250
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 626.000 $120.000 $160.000 $190.000 $114.000 $150.000
SUPERPAVE MIXTURES SP-C PG64-22
TON 23,670.000 $95.000 $97.000 $98.000 $82.550 $100.000
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 6,836.000 $104.000 $97.000 $99.000 $88.670 $105.000
SUPERPAVE MIXTURES SP-C PG64-22(LEV-UP)
TON 8,403.000 $90.000 $105.000 $100.000 $82.550 $100.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 400.000 $45.000 $90.000 $55.000 $50.320 $56.500
PLANE ASPH CONC PAV(0" TO 4")
SY 4,790.000 $2.500 $5.000 $4.000 $2.410 $1.500
CEM STABIL BKFL
CY 161.000 $120.000 $215.000 $180.000 $150.040 $125.000
CUT & RESTORING PAV
SY 415.000 $120.000 $90.000 $75.000 $113.050 $150.000
FLOWABLE BACKFILL
CY 1,647.000 $200.000 $180.000 $165.000 $129.280 $195.000
TRENCH EXCAVATION PROTECTION
LF 2,945.000 $4.200 $6.000 $12.000 $1.000 $10.000
TEMPORARY SPL SHORING
SF 2,316.000 $20.000 $30.000 $45.000 $40.350 $50.000
DRILL SHAFT (36 IN)
LF 2,067.000 $190.000 $140.000 $150.000 $148.670 $165.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 64.000 $180.000 $165.000 $120.000 $106.060 $135.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 170.000 $190.000 $190.000 $190.000 $178.040 $175.000
CL C CONC (ABUT)
CY 78.900 $850.000 $845.000 $880.000 $940.000 $1,000.000
CL C CONC (CAP)
CY 189.200 $950.000 $830.000 $880.000 $980.000 $1,100.000
CL C CONC (COLUMN)
CY 103.700 $1,200.000 $900.000 $1,000.000 $1,100.000 $1,100.000
CL C CONC (RAIL FOUNDATION)
CY 196.000 $800.000 $500.000 $550.000 $340.000 $500.000
CL E CONC (SEAL SLAB)
CY 140.000 $480.000 $265.000 $250.000 $186.170 $300.000
REINF CONC SLAB
SF 55,200.000 $16.500 $14.750 $18.000 $17.000 $20.000
APPROACH SLAB
CY 211.800 $600.000 $455.000 $450.000 $490.000 $570.000
RETAINING WALL (MSE)
SF 29,949.000 $45.000 $60.000 $56.000 $74.000 $50.000
PRESTR CONC GIRDER (TX46)
LF 8,096.910 $135.000 $145.000 $140.000 $145.000 $163.000
RIPRAP (CONC)(4 IN)
CY 796.000 $475.000 $400.000 $350.000 $515.680 $375.000
RIPRAP (CONC)(5 IN)
CY 529.000 $500.000 $400.000 $350.000 $519.630 $400.000
RIPRAP (STONE PROTECTION)(30 IN)
CY 1,596.000 $100.000 $140.000 $190.000 $199.830 $175.000
RIPRAP (MOW STRIP)(4 IN)
CY 118.000 $500.000 $500.000 $520.000 $515.680 $400.000
RAIL (TY T551)
LF 4,932.000 $60.000 $62.000 $75.000 $55.000 $60.000
RAIL (TY T80SS)
LF 598.000 $75.000 $100.000 $120.000 $106.140 $120.000
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 252.000 $90.000 $70.000 $95.000 $92.980 $175.000
CONC BOX CULV (7 FT X 7 FT)
LF 360.000 $490.000 $600.000 $530.000 $559.660 $1,500.000
CONC BOX CULV (9 FT X 6 FT)(EXTEND)
LF 120.000 $900.000 $585.000 $550.000 $1,008.050 $1,600.000
CONC BOX CULV (9 FT X 7 FT)(EXTEND)
LF 156.000 $1,000.000 $620.000 $650.000 $993.980 $1,700.000
RC PIPE (CL III)(18 IN)
LF 1,226.000 $55.000 $40.000 $47.000 $52.200 $80.000
RC PIPE (CL III)(21 IN)
LF 111.000 $100.000 $50.000 $55.000 $59.390 $100.000
RC PIPE (CL III)(24 IN)
LF 128.000 $65.000 $52.000 $75.000 $69.470 $120.000
RC PIPE (CL III)(30 IN)
LF 143.000 $85.000 $70.000 $80.000 $88.590 $180.000
RC PIPE (CL III)(36 IN)
LF 230.000 $105.000 $92.000 $100.000 $88.730 $230.000
RC PIPE (CL III)(48 IN)
LF 140.000 $150.000 $140.000 $160.000 $179.250 $385.000
RC PIPE (CL V)(18 IN)
LF 728.000 $75.000 $62.000 $68.000 $66.140 $170.000
MANH (COMPL)(PRM)(48IN)
EA 1.000 $3,200.000 $5,000.000 $5,800.000 $2,887.670 $6,000.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 12.000 $3,500.000 $4,400.000 $5,300.000 $1,651.010 $4,000.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 3.000 $3,100.000 $5,800.000 $6,300.000 $4,213.290 $5,500.000
INLET (COMPL)(PCU)(3FT)(LEFT)
EA 2.000 $4,600.000 $6,400.000 $6,800.000 $4,595.170 $6,500.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $4,500.000 $6,400.000 $6,800.000 $4,807.260 $6,500.000
INLET (COMPL)(PSL)(RH)(4FTX4FT)
EA 2.000 $4,200.000 $6,600.000 $7,000.000 $2,766.080 $6,500.000
INLET (COMPL)(PSL)(RH)(6FTX6FT)
EA 1.000 $6,700.000 $6,400.000 $6,800.000 $3,885.420 $9,000.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $5,200.000 $5,700.000 $6,300.000 $2,540.200 $5,000.000
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $4,400.000 $7,000.000 $7,300.000 $3,493.900 $7,500.000
INLET(COMPL)(PSL)(SFG)(3FTX5FT-3FTX5FT)
EA 6.000 $5,100.000 $7,000.000 $7,300.000 $3,328.260 $7,000.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 1.000 $4,200.000 $6,300.000 $6,700.000 $2,535.180 $6,000.000
INLET (COMPL)(TY MSE1)
EA 2.000 $6,200.000 $8,000.000 $4,700.000 $3,666.250 $7,000.000
INLET (COMPL)(TY MSE2)
EA 10.000 $7,200.000 $9,500.000 $5,800.000 $4,810.670 $8,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000 $3,200.000 $6,000.000 $7,500.000 $2,688.060 $7,500.000
WINGWALL (FW - 0) (HW=10 FT)
EA 1.000 $9,000.000 $17,250.000 $45,000.000 $10,523.660 $40,000.000
WINGWALL (FW - 0) (HW=11 FT)
EA 2.000 $22,000.000 $19,000.000 $60,000.000 $12,260.520 $40,000.000
WINGWALL (FW - 0) (HW=9 FT)
EA 2.000 $17,000.000 $15,000.000 $23,000.000 $9,986.370 $30,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 3.000 $800.000 $510.000 $650.000 $550.750 $2,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 13.000 $730.000 $540.000 $700.000 $610.980 $3,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 20.000 $730.000 $600.000 $750.000 $646.120 $3,000.000
SET (TY II) (21 IN) (RCP) (6: 1) (P)
EA 4.000 $1,300.000 $940.000 $800.000 $902.110 $3,250.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $1,150.000 $745.000 $850.000 $761.560 $3,250.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $900.000 $940.000 $900.000 $902.120 $3,750.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 6.000 $2,000.000 $1,500.000 $1,200.000 $1,566.490 $4,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 6.000 $3,600.000 $4,000.000 $3,400.000 $2,903.480 $9,500.000
SET (TY II) (48 IN) (RCP) (6: 1) (P)
EA 2.000 $7,200.000 $6,000.000 $5,000.000 $6,811.460 $9,500.000
ADJUSTING INLET (CAP)
EA 1.000 $1,900.000 $2,800.000 $2,500.000 $774.710 $3,500.000
CLEAN EXIST CULVERTS
EA 3.000 $2,000.000 $4,275.000 $2,500.000 $4,383.940 $2,000.000
REMOV STR (INLET)
EA 1.000 $700.000 $1,200.000 $1,000.000 $800.750 $3,000.000
REMOV STR (PIPE)
EA 25.000 $15.000 $500.000 $750.000 $236.290 $1,500.000
MOBILIZATION
LS 1.000 $1,488,294.230 $1,400,000.000 $1,600,000.000 $1,894,330.000 $1,795,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,650.000 $2,500.000 $14,000.000 $29,502.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,330.000 $30.000 $33.000 $30.000 $30.640 $30.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 1,300.000 $45.000 $70.000 $52.000 $65.310 $65.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 54.000 $45.000 $33.000 $55.000 $30.610 $30.000
ROCK FILTER DAMS (REMOVE)
LF 4,630.000 $8.000 $10.000 $3.000 $9.180 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 2,918.000 $18.000 $16.500 $15.000 $15.310 $15.000
CONSTRUCTION EXITS (REMOVE)
SY 2,918.000 $6.000 $10.000 $1.000 $9.180 $10.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 1,000.000 $25.000 $25.000 $16.000 $30.000 $30.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 80.000 $85.000 $200.000 $70.000 $80.000 $75.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,559.000 $2.700 $2.500 $3.800 $5.180 $2.300
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,559.000 $0.800 $1.100 $1.400 $1.020 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 717.000 $4.000 $4.650 $7.000 $4.340 $4.250
BIODEG EROSN CONT LOGS (REMOVE)
LF 717.000 $0.900 $1.650 $3.000 $1.530 $1.500
CONSTRUCTING DETOURS
SY 4,470.000 $65.000 $70.000 $75.000 $63.320 $85.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 4,920.000 $41.000 $80.000 $70.000 $71.150 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $39.000 $86.000 $70.000 $85.220 $95.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 860.000 $32.000 $8.750 $20.000 $7.420 $12.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 5,430.000 $8.000 $6.250 $12.000 $4.040 $3.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 800.000 $8.000 $5.500 $12.000 $4.250 $4.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 140.000 $10.000 $5.500 $12.000 $17.070 $10.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 4,920.000 $11.000 $9.750 $12.000 $3.770 $5.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 860.000 $9.000 $8.250 $12.000 $3.860 $8.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 160.000 $10.000 $8.250 $12.000 $3.980 $9.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 1,350.000 $47.000 $80.000 $85.000 $83.000 $80.000
PERM CTB (SSCB)(TY 3)(MOD)
LF 330.000 $130.000 $360.000 $300.000 $148.000 $300.000
CONC CURB & GUTTER (TY II)
LF 4,986.000 $20.000 $20.000 $30.000 $23.710 $28.000
DRIVEWAYS (ACP)
SY 1,594.000 $36.000 $33.000 $42.000 $30.550 $50.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,250.000 $20.000 $22.500 $21.000 $22.500 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,700.000 $1,485.000 $1,500.000 $1,550.000 $1,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,000.000 $1,190.000 $1,100.000 $1,275.000 $1,100.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 100.000 $25.000 $22.500 $23.000 $25.500 $24.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 350.000 $57.000 $72.000 $52.000 $90.000 $65.000
REMOVE METAL BEAM GUARD FENCE
LF 913.000 $3.000 $2.200 $4.000 $5.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $2,400.000 $2,915.000 $2,700.000 $2,600.000 $2,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $220.000 $320.000 $250.000 $200.000
CRASH CUSH ATTEN (INSTL)
EA 13.000 $10,500.000 $10,500.000 $12,000.000 $9,016.290 $8,900.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 12.000 $1,800.000 $2,200.000 $3,000.000 $1,809.710 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 11.000 $810.000 $880.000 $2,000.000 $904.850 $875.000
PIPE UNDERDRAINS (TY 6) (6")
LF 450.000 $25.000 $48.000 $42.000 $25.690 $22.000
PIPE UNDERDRAINS FILTER MATL(DRAIN PMT)
SY 3,688.000 $15.000 $16.000 $10.000 $11.220 $1.500
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $390.000 $460.000 $450.000 $907.830 $425.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 4.000 $180.000 $485.000 $230.000 $805.800 $450.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $215.000 $575.000 $230.000 $826.200 $525.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 4.000 $1,350.000 $1,705.000 $1,600.000 $1,576.930 $1,200.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,200.000 $1,705.000 $1,600.000 $1,576.930 $1,225.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 17.000 $3,500.000 $3,520.000 $3,400.000 $3,255.590 $3,300.000
CONDT (PVC) (SCH 40) (2")
LF 2,442.000 $6.000 $5.250 $5.000 $4.880 $10.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 766.000 $20.000 $20.000 $20.000 $18.870 $22.000
CONDT (RM) (3/4")
LF 361.000 $16.000 $15.000 $15.000 $13.790 $15.000
ELEC CONDR (NO.12) BARE
LF 396.000 $3.750 $1.650 $1.600 $1.530 $1.000
ELEC CONDR (NO.12) INSULATED
LF 792.000 $3.750 $1.650 $1.600 $1.530 $1.000
ELEC CONDR (NO.8) BARE
LF 3,333.000 $1.400 $1.900 $1.900 $1.780 $1.000
ELEC CONDR (NO.8) INSULATED
LF 7,148.000 $2.050 $1.900 $1.900 $1.780 $1.150
GROUND BOX TY A (122311)
EA 1.000 $720.000 $505.000 $490.000 $467.990 $715.000
GROUND BOX TY A (122311)W/APRON
EA 10.000 $690.000 $650.000 $630.000 $600.250 $875.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(O)
EA 3.000 $5,100.000 $5,500.000 $5,300.000 $5,086.860 $6,000.000
ALUMINUM SIGNS (TY G)
SF 816.000 $25.000 $26.000 $26.000 $24.240 $18.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 24.000 $480.000 $660.000 $480.000 $567.110 $620.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000 $550.000 $770.000 $600.000 $665.420 $710.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 3.000 $650.000 $790.000 $630.000 $682.990 $725.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $675.000 $1,050.000 $570.000 $904.030 $925.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 4.000 $855.000 $1,200.000 $960.000 $1,003.220 $1,000.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $1,800.000 $2,101.000 $2,100.000 $1,929.290 $2,525.000
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 4.000 $3,000.000 $6,000.000 $5,900.000 $4,248.840 $5,600.000
REMOVE SM RD SN SUP&AM
EA 59.000 $90.000 $165.000 $120.000 $126.230 $75.760
INSTALL LRSS (STRUCT STEEL)
LB 3,406.660 $5.000 $4.000 $3.800 $3.540 $5.200
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 18.000 $80.000 $38.500 $51.000 $55.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 49.000 $22.000 $16.500 $30.000 $28.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $20.000 $16.500 $30.000 $28.000 $5.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 24.000 $26.000 $16.500 $30.000 $28.000 $5.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 19.000 $77.000 $38.500 $51.000 $55.000 $40.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 8.000 $25.000 $27.500 $36.000 $45.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $30.000 $27.500 $36.000 $45.000 $10.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 4.000 $29.000 $27.500 $53.000 $45.000 $10.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 2,940.000 $0.250 $0.550 $0.550 $0.500 $0.310
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 55.000 $0.800 $1.100 $1.100 $1.000 $1.120
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 19,167.000 $0.200 $0.280 $0.300 $0.200 $0.240
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,710.000 $0.600 $0.550 $0.550 $0.300 $0.460
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 18,979.000 $0.200 $0.280 $0.300 $0.200 $0.240
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 1,854.000 $1.000 $1.100 $1.900 $0.650 $1.020
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 7,979.000 $0.800 $0.900 $1.700 $0.560 $0.830
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 451.000 $7.000 $7.700 $8.500 $15.000 $6.580
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 11,688.000 $0.900 $0.900 $1.700 $0.560 $0.830
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 751.000 $0.650 $1.200 $0.500 $1.070 $1.800
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 453.000 $0.650 $1.200 $0.500 $0.780 $1.800
REFL PAV MRK TY I (W)4"(LNDP)(100MIL)
LF 130.000 $2.000 $1.100 $1.100 $2.000 $2.860
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 4,291.000 $0.800 $1.000 $1.000 $1.000 $1.020
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 92.000 $6.000 $6.600 $6.500 $6.500 $6.120
REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)
EA 20.000 $27.000 $55.000 $53.000 $25.000 $62.760
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 8.000 $38.000 $66.000 $64.000 $45.000 $70.920
PAVEMENT SEALER 4"
LF 3,412.000 $0.300 $1.100 $1.100 $0.250 $0.180
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 2,605.000 $0.300 $1.100 $1.100 $0.450 $0.490
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 18,238.000 $0.300 $0.550 $0.550 $0.400 $0.430
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 40.000 $0.300 $1.100 $1.100 $0.400 $0.490
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 19,125.000 $0.300 $0.550 $0.550 $0.400 $0.430
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $120.000 $190.000 $190.000 $250.000 $260.000
PREFAB PAV MRK TY C (W) (WORD)
EA 10.000 $150.000 $250.000 $240.000 $350.000 $350.000
REFL PAV MRKR TY II-A-A
EA 182.000 $3.000 $4.400 $4.500 $4.000 $4.000
REFL PAV MRKR TY II-C-R
EA 345.000 $3.500 $4.400 $4.500 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 52,590.000 $0.400 $0.280 $0.300 $0.250 $0.370
ELIM EXT PAV MRK & MRKS (8")
LF 452.000 $1.000 $0.550 $0.500 $0.500 $0.630
ELIM EXT PAV MRK & MRKS (24")
LF 852.000 $3.000 $2.200 $2.500 $0.750 $3.060
ELIM EXT PAV MRK & MRKS (ARROW)
EA 4.000 $58.000 $55.000 $53.000 $20.000 $51.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 4.000 $91.000 $55.000 $53.000 $25.000 $51.000
PAV SURF PREP FOR MRK (4")
LF 3,412.000 $0.100 $0.280 $0.300 $0.100 $0.370
TEMP TRAF SIGNALS
EA 2.000 $79,200.000 $60,000.000 $56,000.000 $55,446.760 $110,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 28.000 $115.000 $100.000 $450.000 $92.010 $500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $16,000.000 $5,000.000 $10,000.000 $16,508.130 $15,000.000
TMA (STATIONARY)
EA 2.000 $5,500.000 $24,000.000 $15,000.000 $21,108.750 $10,000.000
TMA (MOBILE OPERATION)
DAY 40.000 $350.000 $80.000 $500.000 $50.000 $1,000.000
Totals: $16,519,021.480 $16,738,120.330 $17,864,235.858 $18,943,412.026 $21,470,213.702