SMITH SH 110 (0165-01-107)

Items: 41

County: SMITH
Length: N/A
Highway: SH 110
District: TYLER
Control Number: 0165-01-107
DBE Goal: N/A
Project: F 2024(022)
Guaranty: N/A
Time: 47 WORKING DAYS
Engineer's Estimate: $5,785,891.85
Date: 09/06/2023 (2 years ago)
Contract Number: N/A
Type: PREVENTIVE MAINTENANCE
Mail/Deliver Bids To: N/A
PAUL SCHNEIDER
TRAVIS SINGLETON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$5,785,891.85
$6,495,390.00
Over/Under Est: 12.26% $709,498.15
Over/Under Est: 15.45% $894,063.70
Amt Left: 2.84% $184,565.55
Subcontractor Percentage Amount
STRIPING TECHNOLOGY, L.P. 2.84% $184,469.08
FLEX SUPPLY, LLC 0.17% $11,042.16
Total: 3.01% $195,511.24

Bid Items & Bid Tabulations

41 Total 0 of 41
SMITH  |  SH 110  |  TYLER  |  0165-01-107  |  09/06/2023  |  $5,785,891.85  |  F 2024(022)  |  PREVENT MAINT  |  47 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
EAST TEXAS BRIDGE, INC.
REMOVING CONC (CURB AND GUTTER)
LF 500.000 $20.000 $50.000 $25.000
REMOVING CONC (SIDEWALK OR RAMP)
SY 7.000 $35.000 $100.000 $100.000
BLOCK SODDING
SY 15.000 $21.150 $10.000 $150.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 10,000.000 $135.000 $100.000 $90.000
PLANE ASPH CONC PAV (2")
SY 121,421.000 $6.150 $10.000 $8.000
ADJUSTING MANHOLES
EA 10.000 $2,000.000 $2,500.000 $2,500.000
MOBILIZATION
LS 1.000 $500,000.000 $600,000.000 $590,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $9,000.000 $20,000.000 $50,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $5.500 $18.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $3.000 $9.000 $5.000
CONC CURB & GUTTER (TY II)
LF 500.000 $55.000 $60.000 $65.000
CURB RAMPS (TY 1)
EA 1.000 $3,500.000 $3,250.000 $5,000.000
CURB RAMPS (TY 7)
EA 1.000 $3,500.000 $3,250.000 $5,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 3.000 $719.000 $1,150.000 $2,000.000
REMOVE SM RD SN SUP&AM
EA 3.000 $200.000 $50.000 $150.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 8,984.000 $0.540 $2.000 $1.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 2,582.000 $4.970 $12.000 $3.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 3,158.000 $1.020 $2.000 $1.150
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 21,055.000 $0.520 $2.000 $1.150
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 3,754.000 $1.590 $3.000 $2.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 6,813.000 $2.200 $3.000 $2.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 179.000 $1.500 $2.000 $2.300
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 114.000 $1.080 $2.000 $2.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 8,984.000 $1.410 $2.000 $1.150
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,582.000 $7.470 $10.000 $8.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 15,538.000 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 41,336.000 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 5,383.000 $1.000 $1.000 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 42,805.000 $1.000 $1.000 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 60.000 $222.000 $250.000 $230.000
PREFAB PAV MRK TY C (W) (WORD)
EA 39.000 $267.000 $350.000 $275.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 6.000 $650.000 $850.000 $800.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 30.000 $49.000 $100.000 $120.000
REFL PAV MRKR TY I-C
EA 367.000 $4.370 $7.000 $6.000
REFL PAV MRKR TY II-A-A
EA 292.000 $4.000 $7.000 $6.000
REFL PAV MRKR TY II-C-R
EA 446.000 $4.290 $7.000 $6.000
MEMBRANE UNDERSEAL
GAL 24,285.000 $4.160 $6.000 $6.500
SP MIXES SP-C SAC-A PG70-22
TON 13,356.000 $200.000 $220.000 $250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $16,500.000 $16,500.000 $30,000.000
TMA (STATIONARY)
DAY 40.000 $300.000 $250.000 $1,000.000
TMA (MOBILE OPERATION)
DAY 20.000 $300.000 $550.000 $1,000.000
Totals: $5,785,891.850 $6,495,390.000 $6,679,955.550