Show Job Controls
Bid Cobra

SMITH SH 31 (0164-04-163)

Items: 60

County: SMITH
Length: N/A
Highway: SH 31
District: TYLER
Control Number: 0164-04-163
DBE Goal: N/A
Project: STP 2023(572)HES
Guaranty: N/A
Time: 38 WORKING DAYS
Engineer's Estimate: $1,025,662.10
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$1,025,662.10
$1,235,384.00
Over/Under Est: 20.45% $209,721.90
Over/Under Est: 57.07% $585,309.90
Amt Left: 30.4% $375,588.00

Bid Items & Bid Tabulations

60 Total 0 of 60
SMITH  |  SH 31  |  TYLER  |  0164-04-163  |  04/05/2023  |  $1,025,662.10  |  STP 2023(572)HES  |  HAZARD ELIM & SAFETY  |  38 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNH CONSTRUCTION, LLC
L. S. EQUIPMENT CO., INC.
REMOVING CONC (DRIVEWAYS)
SY 240.000 $17.000 $20.000 $40.000
EXCAVATION (ROADWAY)
CY 1,500.000 $8.000 $20.000 $35.000
SUBGRADE WIDENING (ORD COMP)
STA 37.000 $265.000 $450.000 $1,000.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 1,500.000 $30.000 $50.000 $40.000
BACKFILL (TY A)
STA 4.000 $275.000 $250.000 $500.000
BLADING
STA 41.000 $200.000 $250.000 $200.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,081.000 $1.100 $8.000 $2.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,041.000 $0.250 $0.500 $2.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 2,081.000 $0.700 $0.500 $2.000
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 1,041.000 $0.700 $0.500 $2.000
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 1,041.000 $0.700 $0.500 $2.000
VEGETATIVE WATERING
MG 23.000 $10.000 $50.000 $10.000
CEMENT
TON 56.000 $240.000 $300.000 $500.000
CEMENT TREAT(EXIST MATL)(8")
SY 3,278.000 $4.500 $8.000 $5.000
EMULS ASPH (EROSN CONT)(CSS-1)
GAL 49.000 $9.000 $8.000 $25.000
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 18,703.000 $6.000 $8.000 $6.500
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 387.000 $200.000 $350.000 $200.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
SY 1,000.000 $70.000 $80.000 $150.000
PLANE ASPH CONC PAV(0" TO 2")
SY 622.000 $8.000 $10.000 $14.000
PLANE ASPH CONC PAV (2")
SY 3,658.000 $4.000 $10.000 $14.000
MOBILIZATION
LS 1.000 $95,000.000 $100,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 3.000 $5,500.000 $8,500.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 80.000 $35.000 $30.000 $75.000
ROCK FILTER DAMS (REMOVE)
LF 80.000 $8.000 $15.000 $50.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 325.000 $35.000 $50.000 $60.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 16.000 $100.000 $150.000 $60.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000 $3.000 $4.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000 $1.000 $2.000 $4.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 16.000 $100.000 $150.000 $200.000
TURNOUTS (ACP)
SY 16.000 $80.000 $45.000 $80.000
DRIVEWAYS (CONC) (HES)
SY 144.000 $100.000 $125.000 $125.000
RUMBLE STRIPS (SHOULDER)
LF 5,232.000 $0.250 $0.500 $2.500
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $300.000 $950.000 $500.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $350.000 $950.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 4.000 $650.000 $1,000.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $800.000 $1,000.000 $900.000
REMOVE SM RD SN SUP&AM
EA 5.000 $120.000 $50.000 $500.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,146.000 $1.000 $6.000 $2.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 297.000 $1.000 $6.000 $2.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,455.000 $1.250 $1.000 $4.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 1,334.000 $1.000 $1.000 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,699.000 $0.900 $3.000 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 176.000 $6.000 $20.000 $7.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 1,280.000 $0.700 $2.000 $1.250
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 5,832.000 $0.700 $2.000 $1.250
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 5,930.000 $0.700 $2.000 $1.250
PREFAB PAV MRK TY C (W) (ARROW)
EA 14.000 $203.000 $250.000 $250.000
PREFAB PAV MRK TY C (W) (WORD)
EA 14.000 $267.250 $250.000 $300.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 4.000 $35.000 $500.000 $150.000
REFL PAV MRKR TY I-A
EA 39.000 $3.600 $5.000 $8.000
REFL PAV MRKR TY I-C
EA 260.000 $3.500 $5.000 $6.000
REFL PAV MRKR TY II-A-A
EA 5.000 $3.500 $5.000 $7.000
REFL PAV MRKR TY II-C-R
EA 110.000 $4.000 $5.000 $6.000
D-GR HMA TY-D PG64-22
TON 6.000 $215.000 $200.000 $400.000
SP MIXES SP-B PG64-22
TON 2,059.000 $155.000 $120.000 $250.000
SP MIXES SP-C PG64-22
TON 658.000 $155.000 $140.000 $250.000
TACK COAT
GAL 284.000 $4.000 $10.000 $9.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 180.000 $109.000 $150.000 $150.000
TMA (STATIONARY)
DAY 34.000 $225.000 $250.000 $500.000
TMA (MOBILE OPERATION)
DAY 4.000 $300.000 $500.000 $200.000
Totals: $1,025,662.100 $1,235,384.000 $1,610,972.000