Items: 65

County: SHELBY
Length: N/A
Highway: FM 947
District: LUFKIN
Control Number: 2893-01-018
DBE Goal: N/A
Project: STP 2022(898)HES
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $1,969,884.32
Date: 08/04/2022 (3 years ago)
Contract Number: N/A
Type: HAZARD ELIMINATION & SAFETY
Mail/Deliver Bids To: N/A
RANDAL COOPER
CLEOPHA BLANTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (3)
E
Engineer's Estimate
$1,969,884.32
$2,185,617.71
Over/Under Est: 10.95% $215,733.39
Over/Under Est: 35.61% $701,463.13
Amt Left: 22.22% $485,729.74
Over/Under Est: 45.79% $902,020.76
Amt Left: 31.4% $686,287.37
Delta: -7.51% -$200,557.63

Bid Items & Bid Tabulations

65 Total 0 of 65
SHELBY  |  FM 947  |  LUFKIN  |  2893-01-018  |  08/04/2022  |  $1,969,884.32  |  STP 2022(898)HES  |  HAZARD ELIM & SAFETY  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
PINTO CONSTRUCTION CO., INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 47.000 $2,000.000 $1,950.000 $2,000.000 $1,500.000
REMOVING CONC (DRIVEWAYS)
SY 494.000 $20.000 $23.100 $30.000 $15.000
SUBGRADE WIDENING (ORD COMP)
STA 98.000 $300.000 $914.640 $590.000 $1,000.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 227.000 $15.000 $28.350 $55.000 $40.000
BACKFILL (TY B)
STA 98.000 $184.000 $120.750 $140.000 $345.000
BLADING
STA 98.000 $200.000 $121.900 $290.000 $260.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 32.000 $150.000 $162.750 $285.000 $250.000
BLOCK SODDING
SY 1,412.000 $5.000 $5.070 $7.350 $8.000
BROADCAST SEED (TEMP) (WARM)
SY 10,909.000 $0.150 $0.120 $0.150 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 10,909.000 $0.150 $0.120 $0.150 $0.500
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 21,818.000 $0.350 $0.370 $0.400 $0.650
VEGETATIVE WATERING
MG 891.300 $10.000 $0.010 $34.000 $5.000
CEM TRT(PLNT MX)(CL N)(TY D)(GR 4)(10")
SY 8,728.000 $55.000 $60.000 $84.000 $96.170
FOG SEAL (SS-1 OR CSS-1)
GAL 349.000 $4.250 $16.040 $15.000 $40.000
ASPH (RC-250)
TON 10.000 $1,100.000 $2,035.500 $1,500.000 $2,882.050
AGGR (TY E OR L GR 5)
CY 61.000 $175.000 $227.000 $350.000 $350.000
AGGR(TY-PE OR TY-PL)(GR-4)(SAC-B)
CY 301.000 $175.000 $186.300 $210.000 $225.000
ASPH (AC-15P OR CRS-2P)
TON 73.000 $900.000 $1,116.650 $1,050.000 $1,875.000
CEM STABIL BKFL
CY 10.000 $200.000 $217.350 $220.000 $250.000
CL C CONC (COLLAR)
EA 3.000 $1,000.000 $840.000 $735.000 $1,500.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 24.000 $300.000 $173.250 $210.000 $250.000
RC PIPE (CL III)(18 IN)
LF 1,238.000 $50.000 $51.450 $47.000 $60.000
RC PIPE (CL III)(24 IN)
LF 36.000 $80.000 $75.600 $78.000 $200.000
HEADWALL (CH - FW - 0) (DIA= 42 IN)
EA 1.000 $6,000.000 $8,400.000 $14,000.000 $10,000.000
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 1.000 $7,000.000 $6,930.000 $11,000.000 $11,000.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $7,588.000 $4,935.000 $8,500.000 $7,000.000
HEADWALL (CH - PW - S) (DIA= 48 IN)
EA 1.000 $11,000.000 $10,132.500 $15,000.000 $14,000.000
SET (TY II) (15 IN) (RCP) (4: 1) (C)
EA 4.000 $510.000 $682.500 $630.000 $700.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 6.000 $800.000 $735.000 $630.000 $750.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 82.000 $600.000 $792.750 $755.000 $850.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $750.000 $1,155.000 $1,100.000 $1,200.000
CLEAN EXIST CULVERTS
EA 4.000 $1,450.000 $1,260.000 $1,050.000 $500.000
REMOV STR (PIPE)
EA 37.000 $240.000 $240.450 $210.000 $100.000
MOBILIZATION
LS 1.000 $170,000.000 $100,000.000 $250,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $2,000.000 $1,055.550 $1,950.000 $2,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 360.000 $30.000 $20.000 $42.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $10.000 $3.000 $8.400 $5.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 263.000 $25.000 $10.000 $31.000 $10.000
CONSTRUCTION EXITS (REMOVE)
SY 263.000 $7.500 $3.000 $8.400 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,386.000 $2.500 $3.000 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,386.000 $1.000 $1.000 $0.800 $1.000
DRIVEWAYS (CONC)
SY 548.000 $140.000 $112.350 $95.000 $130.000
DRIVEWAYS (ACP)
SY 1,216.000 $50.000 $60.000 $62.000 $62.620
TURNOUTS (SURF TREAT)
SY 385.000 $50.000 $52.500 $66.000 $70.000
DRIVEWAYS (BASE)
SY 1,986.000 $30.000 $39.450 $62.000 $48.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 16.000 $175.000 $283.500 $285.000 $400.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 3.000 $230.000 $283.500 $285.000 $400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $500.000 $682.500 $685.000 $1,000.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 19.000 $360.000 $456.750 $455.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 22.000 $75.000 $99.750 $100.000 $50.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 19.000 $90.430 $110.250 $110.000 $200.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 19,636.000 $0.200 $0.530 $0.550 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 19,636.000 $0.500 $0.530 $0.550 $0.750
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,966.000 $1.000 $1.750 $2.000 $2.750
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 19,636.000 $0.750 $1.310 $1.300 $1.700
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
LF 5,410.000 $0.850 $1.580 $1.600 $1.700
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
LF 8,170.000 $0.710 $1.580 $1.600 $1.700
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 30.000 $20.000 $15.750 $16.000 $50.000
PREFAB PAV MRK TY C (W) (RR XING)
EA 2.000 $523.000 $735.000 $735.000 $1,000.000
REFL PAV MRKR TY II-A-A
EA 225.000 $5.000 $5.250 $5.250 $20.000
SP MIXES SP-D SAC-B PG70-22 (LEVEL-UP)
TON 3,334.000 $130.000 $157.660 $160.000 $162.500
TACK COAT
GAL 2,837.000 $2.000 $5.250 $4.500 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 1.000 $10,000.000 $20,000.000 $18,000.000 $7,000.000
TMA (STATIONARY)
DAY 75.000 $100.000 $230.000 $235.000 $175.000
TMA (MOBILE OPERATION)
DAY 5.000 $45.000 $50.000 $160.000 $500.000
Totals: $1,969,884.320 $2,185,617.713 $2,671,347.450 $2,871,905.080