County: SHELBY Highway: CR Date: 10/01/2024 (7 weeks ago) Engineer's Estimate: $2,145,296 Control Number: 0911-39-070
Project: BR 2B23(044) District: LUFKIN Time: 346 WORKING DAYS Type: BRIDGE REPLACEMENT
Bidder's List

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,145,295.50
THK CONSTRUCTION LLC   $2,037,058.97 1
-5.05% | -$108,236.53
SKYLINE BRIDGE LLC   $2,373,650.82 2
10.64% | $228,355.32
16.52% | $336,591.85
EAST TEXAS BRIDGE, INC.   $2,429,447.45 3
13.25% | $284,151.95
19.26% | $392,388.48
2.35% | $55,796.63
HODGES AND SON CONSTRUCTION COMPANY, INC.   $3,044,783.00 4
41.93% | $899,487.50
49.47% | $1,007,724.03
25.33% | $615,335.55

Bid Items

Items: 50, 0 filtered
SHELBY CR  |  LUFKIN  |  0911-39-070  |  10/01/2024  |  $2,145,296  |  BR 2B23(044)  |  BRIDGE REPL  |  346 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate THK CONSTRUCTION LLC SKYLINE BRIDGE LLC EAST TEXAS BRIDGE, INC. HODGES AND SON CONSTRUCTION COMPANY, INC.
100 7002 PREPARING ROW STA 16.400 $3,000.000 $2,000.000 $2,275.000 $5,000.000 $6,800.000
110 7001 EXCAV (ROADWAY) CY 719.000 $20.000 $20.000 $20.000 $30.000 $30.000
132 7003 EMBANK (FNL)(OC)(TY B) CY 1,323.000 $30.000 $20.000 $37.000 $35.000 $40.000
160 7002 FURN & PLACE TOPSOIL (4") SY 5,047.000 $5.500 $4.000 $4.000 $4.000 $5.000
164 7073 BOND FBR MTRX SEED (PERM)(RURAL)(SAND) SY 5,047.000 $2.000 $3.240 $2.500 $2.350 $2.000
164 7074 BONDED FBR MTRX SEED (TEMP)(WARM) SY 2,345.000 $2.000 $0.010 $2.250 $2.250 $1.000
164 7075 BONDED FBR MTRX SEED (TEMP)(COOL) SY 2,345.000 $2.000 $0.010 $2.250 $2.250 $1.000
168 7001 VEGETATIVE WATERING TGL 195.000 $20.000 $10.000 $1.000 $10.000 $1.000
169 7003 SOIL RET BLKT(SL_MOD_SAND_SHORT) SY 248.000 $10.000 $5.400 $3.250 $3.750 $6.000
247 7033 FL BS (CMP IN PLC)(TY D GR 1-2) (4") SY 882.000 $40.000 $40.000 $42.000 $35.000 $50.000
247 7056 FL BS (CMP IN PLC)(TY D GR 1-2) (6") SY 2,811.000 $45.000 $40.000 $48.000 $40.000 $60.000
316 7032 ASPH (RC-250) TON 0.830 $1,500.000 $28,080.000 $18,554.000 $7,500.000 $20,000.000
316 7254 AGGR (TY E OR L, GR-5) CY 6.000 $360.000 $1,500.000 $1,867.000 $750.000 $4,000.000
344 7011 SP MIXES SP-C SAC-B PG64-22 TON 84.000 $180.000 $350.000 $550.000 $450.000 $600.000
400 7010 CEM STABIL BKFL CY 220.000 $350.000 $350.000 $345.000 $325.000 $300.000
416 7004 DRILL SHAFT (24 IN) LF 420.000 $280.000 $317.320 $325.000 $330.000 $225.000
416 7006 DRILL SHAFT (36 IN) LF 420.000 $320.000 $382.120 $415.000 $415.000 $360.000
420 7012 CL C CONC (ABUT) CY 97.800 $1,400.000 $1,100.000 $1,025.000 $1,500.000 $2,500.000
422 7001 REINF CONC SLAB SF 6,040.000 $25.000 $31.000 $27.500 $35.000 $45.000
422 7020 SHEAR KEY CY 9.000 $650.000 $800.000 $1,400.000 $1,000.000 $800.000
425 7001 PRESTR CONC GIRDER (TX28) LF 278.000 $250.000 $452.000 $413.000 $345.000 $440.000
425 7018 PRESTR CONC SLAB BEAM (4SB15) LF 134.000 $250.000 $300.000 $584.000 $345.000 $460.000
425 7019 PRESTR CONC SLAB BEAM (5SB15) LF 384.000 $275.000 $322.000 $327.000 $345.000 $460.000
425 7026 PRESTR CONC BOX BEAM (4B20) LF 258.000 $270.000 $324.000 $546.000 $345.000 $475.000
425 7027 PRESTR CONC BOX BEAM (5B20) LF 129.000 $280.000 $324.000 $400.000 $345.000 $475.000
432 7043 RIPRAP (STONE PROTECTION)(18 IN) CY 758.000 $225.000 $190.000 $211.000 $285.000 $250.000
450 7021 RAIL (TY T631LS) LF 588.000 $80.000 $67.500 $82.000 $80.000 $75.000
454 7001 TYPE A JOINT LF 210.000 $75.000 $20.000 $120.000 $50.000 $150.000
496 7009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 4.000 $20,000.000 $5,000.000 $12,775.000 $20,000.000 $50,000.000
500 7001 MOBILIZATION LS 1.000 $200,000.000 $200,000.000 $175,000.000 $235,000.000 $275,000.000
502 7001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 31.000 $2,000.000 $1,033.190 $1,840.000 $3,500.000 $3,000.000
506 7002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 214.000 $50.000 $54.000 $40.000 $40.000 $1.000
506 7011 ROCK FILTER DAMS (REMOVE) LF 214.000 $15.000 $16.200 $11.000 $15.000 $1.000
506 7034 CONSTRUCTION PERIMETER FENCE LF 25.000 $10.000 $10.800 $18.000 $15.000 $1.000
506 7039 TEMP SEDMT CONT FENCE (INSTALL) LF 2,993.000 $4.000 $4.760 $4.000 $4.500 $1.000
506 7041 TEMP SEDMT CONT FENCE (REMOVE) LF 2,993.000 $1.000 $1.080 $1.000 $1.000 $1.000
508 7001 CONSTRUCTING DETOURS SY 435.000 $100.000 $50.000 $150.000 $70.000 $220.000
510 7003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 20.000 $4,500.000 $2,868.480 $4,316.000 $2,500.000 $5,000.000
512 7009 PORT CTB (FUR & INST)(LOW PROF)(TY 1) LF 150.000 $300.000 $80.000 $117.000 $85.000 $120.000
512 7010 PORT CTB (FUR & INST)(LOW PROF)(TY 2) LF 40.000 $300.000 $80.000 $205.000 $85.000 $120.000
512 7057 PORT CTB (REMOVE)(LOW PROF)(TY 1) LF 150.000 $100.000 $20.000 $61.000 $20.000 $120.000
512 7058 PORT CTB (REMOVE)(LOW PROF)(TY 2) LF 40.000 $100.000 $20.000 $165.000 $20.000 $120.000
540 7001 MTL W-BEAM GD FEN (TIM POST) LF 337.000 $35.000 $27.540 $35.000 $30.000 $26.000
540 7015 DOWNSTREAM ANCHOR TERMINAL SECTION EA 8.000 $1,500.000 $1,431.000 $1,656.000 $1,500.000 $1,500.000
544 7001 GUARDRAIL END TREATMENT (INSTALL) EA 8.000 $3,500.000 $3,105.000 $3,594.000 $3,200.000 $3,000.000
552 7004 WIRE FENCE (TY D) LF 91.000 $25.000 $27.000 $47.000 $35.000 $25.000
644 7073 REMOVE SM RD SN SUP&AM EA 6.000 $250.000 $250.000 $281.000 $100.000 $50.000
658 7019 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 25.000 $40.000 $27.000 $31.000 $30.000 $30.000
658 7066 INSTL OM ASSM (OM-3L)(TWT)GND EA 8.000 $25.000 $486.000 $150.000 $300.000 $500.000
3007 7001 BONDING COURSE GAL 38.000 $6.000 $40.000 $250.000 $50.000 $20.000
Totals: $2,145,295.50 $2,037,058.97 $2,373,650.82 $2,429,447.45 $3,044,783.00