SCURRY FM 1298 (2034-01-013)

Items: 49

County: SCURRY
Length: N/A
Highway: FM 1298
District: ABILENE
Control Number: 2034-01-013
DBE Goal: N/A
Project: BR 2023(436)
Guaranty: N/A
Time: 80 WORKING DAYS
Engineer's Estimate: $1,402,624.50
Date: 02/01/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
STEWART CHAPMAN
MAXIE ALLEN
JOSE CABRERA
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,402,624.50
$1,393,947.05
Over/Under Est: -0.62% -$8,677.45
Over/Under Est: 10.19% $142,940.50
Amt Left: 10.88% $151,617.95
$1,969,580.00
Over/Under Est: 40.42% $566,955.50
Amt Left: 41.3% $575,632.95
Delta: -27.43% -$424,015.00
$1,983,858.50
Over/Under Est: 41.44% $581,234.00
Amt Left: 42.32% $589,911.45
Delta: -0.72% -$14,278.50

Bid Items & Bid Tabulations

49 Total 0 of 49
SCURRY  |  FM 1298  |  ABILENE  |  2034-01-013  |  02/01/2023  |  $1,402,624.50  |  BR 2023(436)  |  BRIDGE REPL  |  80 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
COPPELL CONSTRUCTION CO., INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
GILVIN-TERRILL, LTD.
EARTH BUILDERS, L.P.
PREPARING ROW
STA 2.000 $5,000.000 $16,000.000 $50,000.000 $5,000.000 $50,000.000
REMOVING CONC (RIPRAP)
SY 288.000 $50.000 $12.000 $25.000 $60.000 $15.000
EXCAVATION (ROADWAY)
CY 450.000 $20.000 $42.000 $20.000 $50.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 1,140.000 $30.000 $51.000 $30.000 $60.000 $50.000
FURNISHING AND PLACING TOPSOIL (4")
SY 4,478.000 $2.000 $6.000 $2.000 $10.000 $3.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 4,478.000 $2.000 $0.750 $2.000 $1.000 $1.500
BROADCAST SEED (TEMP) (WARM)
SY 2,239.000 $2.000 $0.650 $1.000 $1.000 $1.500
BROADCAST SEED (TEMP) (COOL)
SY 2,239.000 $2.000 $0.700 $1.000 $1.000 $1.500
VEGETATIVE WATERING
MG 68.000 $70.000 $40.000 $1.000 $100.000 $100.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 268.000 $2.500 $3.000 $4.000 $5.000 $8.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 680.000 $90.000 $144.000 $75.000 $150.000 $130.000
PRIME COAT(MC-30 OR AE-P)
GAL 609.000 $7.500 $12.000 $20.000 $10.000 $20.000
ASPH (MULTI OPTION)
GAL 1,218.000 $15.000 $10.000 $18.000 $10.000 $20.000
ASPH (AC-20-5TR)
GAL 1,096.000 $15.000 $10.000 $18.000 $10.000 $20.000
AGGR(TY-B GR-3 SAC-B)
CY 27.000 $140.000 $665.000 $1,200.000 $250.000 $500.000
AGGR(TY-PB GR-4 SAC-B)
CY 25.000 $130.000 $720.000 $1,200.000 $300.000 $500.000
CEM STABIL BKFL
CY 88.000 $450.000 $400.000 $300.000 $500.000 $300.000
DRILL SHAFT (36 IN)
LF 426.000 $280.000 $265.000 $260.000 $300.000 $550.000
CL C CONC (ABUT)
CY 42.200 $1,500.000 $1,600.000 $1,400.000 $2,000.000 $3,000.000
CL C CONC (CAP)
CY 28.600 $2,000.000 $1,600.000 $1,400.000 $2,000.000 $3,000.000
CL C CONC (COLUMN)
CY 9.400 $1,750.000 $2,000.000 $1,500.000 $2,000.000 $3,000.000
REINF CONC SLAB
SF 4,760.000 $22.500 $36.000 $38.000 $40.000 $50.000
APPROACH SLAB
CY 48.100 $1,400.000 $1,200.000 $1,000.000 $2,000.000 $1,500.000
PRESTR CONC GIRDER (TX28)
LF 554.000 $240.000 $261.000 $345.000 $500.000 $350.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 218.900 $175.000 $231.000 $250.000 $400.000 $225.000
RAIL (TY T223)
LF 328.000 $172.500 $200.000 $175.000 $200.000 $160.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 128.000 $250.000 $270.000 $275.000 $350.000 $275.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $200,000.000 $52,000.000 $120,000.000 $180,000.000 $125,000.000
MOBILIZATION
LS 1.000 $126,867.500 $135,000.000 $105,000.000 $195,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $12,500.000 $5,000.000 $19,000.000 $20,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $60.000 $40.000 $1.000 $65.000 $90.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $20.000 $20.000 $1.000 $10.000 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 188.000 $30.000 $40.000 $1.000 $45.000 $80.000
CONSTRUCTION EXITS (REMOVE)
SY 188.000 $8.000 $10.000 $1.000 $15.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 766.000 $6.000 $4.500 $1.000 $3.750 $8.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 766.000 $2.000 $2.250 $1.000 $1.250 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 24.000 $15.000 $10.000 $1.000 $10.000 $25.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 24.000 $2.000 $5.000 $1.000 $3.000 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 350.000 $35.000 $23.750 $30.000 $27.500 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,800.000 $2,000.000 $2,400.000 $2,800.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $5.000 $3.000 $2.000 $3.000 $5.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,750.000 $3,000.000 $3,500.000 $3,275.000 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $400.000 $200.000 $500.000 $300.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $55.000 $15.000 $50.000 $21.500 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $55.000 $40.000 $50.000 $45.000 $50.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,884.000 $2.000 $2.500 $4.000 $4.000 $6.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 1,884.000 $2.000 $2.500 $4.000 $3.000 $6.000
REFL PAV MRKR TY II-A-A
EA 24.000 $12.000 $24.000 $30.000 $27.500 $24.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 3,180.000 $2.500 $1.700 $4.000 $2.000 $5.000
Totals: $1,402,624.500 $1,393,947.050 $1,545,565.000 $1,969,580.000 $1,983,858.500