SCURRY CS (0908-19-026)

Items: 55

County: SCURRY
Length: N/A
Highway: CS
District: ABILENE
Control Number: 0908-19-026
DBE Goal: N/A
Project: BR 1802(837)
Guaranty: N/A
Time: 151 WORKING DAYS
Engineer's Estimate: $1,965,457.60
Date: 07/09/2020 (5 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,965,457.60
Over/Under Est: 1.89% $37,116.25
Over/Under Est: 16.65% $327,202.91
Amt Left: 14.49% $290,086.66
Over/Under Est: 17.99% $353,601.75
Amt Left: 15.8% $316,485.50
Delta: -1.15% -$26,398.84
Over/Under Est: 20.43% $401,570.90
Amt Left: 18.2% $364,454.65
Delta: -2.07% -$47,969.15
Over/Under Est: 28.63% $562,638.65
Amt Left: 26.24% $525,522.40
Delta: -6.80% -$161,067.75

Bid Items & Bid Tabulations

55 Total 0 of 55
SCURRY  |  CS  |  ABILENE  |  0908-19-026  |  07/09/2020  |  $1,965,457.60  |  BR 1802(837)  |  BRIDGE REPL  |  151 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
J. H. STRAIN & SONS, INC.
A GREATER AUSTIN DEVELOPMENT COMPANY, INC.
STATELINE CONSTRUCTION, LLC
PREPARING ROW
STA 10.210 $4,000.000 $4,500.000 $4,924.830 $2,500.000 $2,800.000 $4,000.000
REMOVING CONC (RIPRAP)
SY 170.000 $35.000 $40.000 $62.000 $25.000 $24.000 $50.000
REMOVING CONC (CURB AND GUTTER)
LF 289.000 $10.000 $10.000 $14.460 $15.000 $19.500 $17.500
REMOVE CONC (GUTTER)
LF 109.000 $7.000 $35.000 $10.320 $15.000 $19.500 $25.000
REMOVING STAB BASE AND ASPH PAV (2"-6")
SY 193.000 $5.000 $40.000 $37.800 $35.000 $24.000 $22.000
EXCAVATION (ROADWAY AND CHANNEL)
CY 1,515.000 $30.000 $30.000 $33.700 $38.000 $4.000 $25.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 1,012.000 $25.000 $35.000 $40.570 $38.000 $22.000 $35.000
BLOCK SODDING
SY 2,186.000 $5.000 $10.000 $7.270 $10.000 $9.000 $8.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 3,983.000 $1.000 $4.000 $1.500 $2.500 $4.000 $3.500
CEM STABIL BKFL
CY 71.000 $250.000 $250.000 $208.010 $220.000 $258.000 $300.000
DRILL SHAFT (24 IN)
LF 360.000 $250.000 $260.000 $364.650 $250.000 $290.000 $325.000
CL C CONC (ABUT)
CY 45.600 $1,500.000 $1,400.000 $1,431.020 $1,100.000 $1,284.000 $1,600.000
REINF CONC SLAB (SLAB BEAM)
SF 2,394.000 $30.000 $26.000 $46.450 $28.000 $30.000 $32.250
PRESTR CONC SLAB BEAM (5SB12)
LF 197.110 $260.000 $235.000 $229.320 $235.000 $250.000 $225.000
PRESTR CONC SLAB BEAM (5SB15)
LF 267.000 $260.000 $240.000 $245.680 $240.000 $250.000 $225.000
RIPRAP (CONC)(5 IN)
CY 148.000 $600.000 $550.000 $583.750 $850.000 $550.000 $900.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 58.000 $600.000 $600.000 $686.530 $850.000 $890.000 $1,100.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $700.000 $500.000 $1,018.550 $825.000 $900.000 $1,000.000
RAIL (TY T223)
LF 284.800 $200.000 $130.000 $247.900 $125.000 $298.000 $175.000
RAIL (TY C223)
LF 62.800 $200.000 $140.000 $239.510 $165.000 $3,889.000 $250.000
ARMOR JOINT (SEALED)
LF 104.000 $160.000 $85.000 $208.800 $115.000 $173.000 $110.000
CONC BOX CULV (11 FT X 11 FT)
LF 213.000 $1,500.000 $1,700.000 $1,422.670 $2,800.000 $2,603.000 $1,500.000
RC PIPE (CL III)(30 IN)
LF 211.000 $280.000 $150.000 $124.260 $350.000 $220.000 $115.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 2.000 $6,000.000 $6,000.000 $6,835.930 $9,500.000 $8,300.000 $15,000.000
INLET (COMPL)(PCU)(5FT)(BOTH)
EA 1.000 $6,500.000 $8,000.000 $7,848.060 $10,000.000 $9,200.000 $15,000.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 1.000 $6,000.000 $6,000.000 $6,099.110 $7,500.000 $7,000.000 $24,000.000
WINGWALL (FW - 0) (HW=14 FT)
EA 1.000 $27,500.000 $65,000.000 $59,916.010 $46,000.000 $65,000.000 $49,500.000
WINGWALL (FW - 0) (HW=15 FT)
EA 1.000 $27,500.000 $70,000.000 $62,725.140 $55,000.000 $80,000.000 $54,500.000
REMOV STR (BOX CULVERT)
LF 192.000 $75.000 $125.000 $188.410 $95.000 $90.000 $95.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 2.000 $20,000.000 $15,000.000 $23,376.160 $16,000.000 $15,607.000 $80,000.000
REMOVE STR (RAIL)
LF 82.000 $25.000 $40.000 $94.570 $15.000 $14.000 $27.250
MOBILIZATION
LS 1.000 $165,921.000 $175,000.000 $392,102.020 $188,250.000 $235,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $11,000.000 $9,000.000 $2,552.500 $2,500.000 $4,500.000 $9,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 167.000 $60.000 $5.000 $30.260 $60.000 $45.000 $67.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 469.000 $6.000 $1.000 $4.100 $7.000 $6.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 469.000 $2.000 $1.000 $1.350 $2.000 $2.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 884.000 $6.000 $6.000 $9.610 $7.000 $9.000 $16.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 884.000 $2.000 $2.000 $2.340 $2.000 $2.000 $4.000
CONC CURB & GUTTER (TY II)
LF 338.000 $30.000 $40.000 $54.070 $30.000 $29.000 $95.000
CONCRETE GUTTER (MODIFIED)
LF 109.000 $48.000 $60.000 $80.800 $35.000 $39.000 $95.000
DRIVEWAYS (ACP)
SY 190.000 $41.000 $60.000 $81.560 $100.000 $42.000 $105.000
CONC SIDEWALKS (4")
SY 70.000 $75.000 $70.000 $101.120 $95.000 $76.000 $320.000
CURB RAMPS (TY 10)
EA 2.000 $2,500.000 $3,000.000 $3,126.730 $2,200.000 $2,036.000 $7,500.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $30.000 $25.000 $27.750 $28.000 $26.000 $55.000
MTL W-BEAM GD FEN (STEEL POST)
LF 57.000 $30.000 $25.000 $57.230 $72.000 $67.000 $75.000
MTL BEAM GD FEN TRANS (TL2)
EA 12.000 $1,500.000 $1,500.000 $1,700.770 $1,800.000 $1,672.000 $3,000.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 1.000 $1,500.000 $1,600.000 $1,804.420 $2,200.000 $2,230.000 $20,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $3,600.000 $2,700.000 $3,405.770 $3,800.000 $3,567.000 $3,250.000
WIRE FENCE (TY C)
LF 1,320.000 $15.000 $20.000 $22.960 $25.000 $9.000 $12.500
REMOVE SM RD SN SUP&AM
EA 7.000 $100.000 $5.000 $128.130 $100.000 $111.000 $250.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BR)
EA 53.000 $45.000 $40.000 $55.970 $40.000 $33.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BR)
EA 18.000 $25.000 $40.000 $92.510 $40.000 $33.000 $50.000
SP MIXES SP-B PG64-22
TON 1,339.000 $200.000 $180.000 $153.680 $200.000 $84.000 $275.000
SP MIXES SP-D SAC-B PG70-22
TON 164.000 $200.000 $180.000 $207.620 $250.000 $162.000 $275.000
TACK COAT
GAL 548.000 $7.000 $12.000 $18.100 $5.000 $9.000 $19.000
Totals: $1,965,457.600 $2,002,573.850 $2,292,660.530 $2,319,059.350 $2,367,028.500 $2,528,096.250