County: SCURRY Highway: US 84 Date: 06/06/2024 (5 months ago) Engineer's Estimate: $9,703,227 Control Number: 0053-10-047
Project: C 53-10-47 District: ABILENE Time: 63 WORKING DAYS Type: RESURFACE ROADWAY
Bidder's List
Informational:

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $9,703,226.96
RK HALL, LLC   $9,325,296.75 1
-3.89% | -$377,930.21
NOBLES ROAD CONSTRUCTION, INC.   $10,427,823.79 2
7.47% | $724,596.83
11.82% | $1,102,527.04
GILVIN-TERRILL, LTD.   $11,728,588.16 3
20.87% | $2,025,361.20
25.77% | $2,403,291.41
12.47% | $1,300,764.37

Bid Items

Items: 33, 0 filtered
SCURRY US 84  |  ABILENE  |  0053-10-047  |  06/06/2024  |  $9,703,227  |  C 53-10-47  |  RESURF ROADWAY  |  63 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC NOBLES ROAD CONSTRUCTION, INC. GILVIN-TERRILL, LTD.
134 6002 BACKFILL (TY B) STA 755.000 $150.000 $171.120 $330.000 $300.000
351 6013 FLEXIBLE PAVEMENT STRUCTURE REPAIR(4") SY 20,004.000 $50.000 $49.480 $53.000 $75.000
354 6045 PLANE ASPH CONC PAV (2") SY 316,730.000 $2.500 $2.260 $1.850 $3.900
500 6001 MOBILIZATION LS 1.000 $841,260.000 $435,687.700 $1,019,000.000 $1,100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $20,000.000 $24,600.000 $22,000.000 $100,000.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 150,030.000 $0.200 $0.220 $0.220 $0.150
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 2,225.000 $30.000 $27.500 $36.300 $25.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,400.000 $1,595.000 $1,320.000 $1,450.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 33.000 $85.000 $93.500 $88.000 $85.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,250.000 $2.500 $1.100 $2.200 $1.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $250.000 $110.000 $330.000 $100.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 2.000 $250.000 $110.000 $330.000 $100.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,500.000 $6,365.730 $3,080.000 $3,000.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 90.000 $30.000 $60.500 $33.000 $55.000
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 5,630.000 $1.000 $3.770 $11.000 $2.000
666 6018 REFL PAV MRK TY I (W)6"(DOT)(100MIL) LF 103.000 $1.620 $1.100 $1.380 $1.000
666 6030 REFL PAV MRK TY I (W)8"(DOT)(100MIL) LF 479.000 $1.500 $1.100 $1.500 $1.000
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 2,516.000 $1.250 $1.100 $1.500 $1.000
666 6042 REFL PAV MRK TY I (W)12"(SLD)(100MIL) LF 79.000 $3.000 $11.000 $1.500 $10.000
666 6048 REFL PAV MRK TY I (W)24"(SLD)(100MIL) LF 44.000 $9.500 $11.000 $35.000 $10.000
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 14,715.000 $0.850 $0.750 $0.710 $0.680
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 58,263.000 $0.850 $0.730 $0.800 $0.660
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 58,118.000 $0.850 $0.730 $0.800 $0.660
668 6077 PREFAB PAV MRK TY C (W) (ARROW) EA 6.000 $250.000 $275.000 $465.000 $250.000
668 6085 PREFAB PAV MRK TY C (W) (WORD) EA 6.000 $350.000 $385.000 $650.000 $350.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 184.000 $65.000 $60.500 $27.500 $55.000
672 6010 REFL PAV MRKR TY II-C-R EA 938.000 $4.000 $4.400 $4.950 $4.000
3076 6042 D-GR HMA TY-D SAC-B PG70-22 TON 9,234.000 $160.000 $160.440 $177.000 $190.000
3077 6075 TACK COAT GAL 8,336.000 $5.500 $5.510 $6.350 $6.000
3080 6007 STONE-MTRX-ASPH SMA-D SAC-A PG76-22 TON 24,625.000 $200.000 $203.010 $212.500 $205.000
3080 6029 TACK COAT GAL 23,338.000 $5.500 $5.220 $5.800 $6.000
6185 6002 TMA (STATIONARY) DAY 70.000 $300.000 $220.000 $302.000 $475.000
6185 6005 TMA (MOBILE OPERATION) DAY 15.000 $600.000 $914.920 $1,100.000 $950.000
Totals: $9,703,226.96 $9,325,296.75 $10,427,823.79 $11,728,588.16