Show Job Controls
Bid Cobra

SCURRY US 84 (0053-07-040)

Items: 74

County: SCURRY
Length: N/A
Highway: US 84
District: ABILENE
Control Number: 0053-07-040
DBE Goal: N/A
Project: F 2021(743)
Guaranty: N/A
Time: 141 WORKING DAYS
Engineer's Estimate: $2,896,171.50
Date: 07/01/2021 (4 years ago)
Contract Number: N/A
Type: INSTALL/UPGRADE ROADWAY LIGHTING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (4)
E
Engineer's Estimate
$2,896,171.50
$3,245,689.67
Over/Under Est: 12.07% $349,518.17
Over/Under Est: 15.02% $434,983.53
Amt Left: 2.63% $85,465.36
$3,629,949.65
Over/Under Est: 25.34% $733,778.15
Amt Left: 11.84% $384,259.98
Delta: -8.97% -$298,794.62
$3,727,342.16
Over/Under Est: 28.7% $831,170.66
Amt Left: 14.84% $481,652.49
Delta: -2.68% -$97,392.51

Bid Items & Bid Tabulations

74 Total 0 of 74
SCURRY  |  US 84  |  ABILENE  |  0053-07-040  |  07/01/2021  |  $2,896,171.50  |  F 2021(743)  |  INSTL/UPGRADE ROADWAY LIGHTING  |  141 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
A. L. HELMCAMP, INC.
J. H. STRAIN & SONS, INC.
GILVIN-TERRILL, LTD.
RK HALL, LLC
REMOVING CONC (HEADWALL)
CY 1.000 $250.000 $525.000 $1,000.000 $2,000.000 $2,200.000
EXCAVATION (ROADWAY)
CY 105.000 $15.000 $35.000 $75.000 $25.000 $39.770
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 7,183.000 $15.000 $20.000 $30.000 $25.000 $21.260
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 40,470.000 $0.170 $0.170 $0.170 $0.200 $0.180
BROADCAST SEED (TEMP) (WARM)
SY 20,235.000 $0.170 $0.130 $0.170 $0.150 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 20,235.000 $0.170 $0.140 $0.170 $0.150 $0.140
VEGETATIVE WATERING
MG 681.100 $40.000 $15.000 $65.000 $32.000 $56.320
ASPH (MULTI OPTION)
GAL 32,352.000 $4.000 $3.750 $4.500 $4.000 $3.640
AGGR(TY-PB GR-4 SAC-B)
CY 642.000 $150.000 $175.000 $120.000 $130.000 $176.500
PLANE ASPH CONC PAV(0" TO 4")
SY 37,838.000 $2.200 $4.000 $2.650 $2.000 $2.970
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 24,277.000 $2.000 $1.500 $1.800 $2.000 $2.190
PLANE ASPH CONC PAV (1 1/4")
SY 52,028.000 $1.200 $1.000 $1.500 $2.000 $1.750
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 80.000 $300.000 $262.500 $300.000 $250.000 $275.000
RIPRAP (CONC)(4 IN)
CY 3.000 $1,000.000 $525.000 $800.000 $2,000.000 $880.000
RIPRAP (CONC)(CL B)
CY 3.500 $950.000 $525.000 $800.000 $1,000.000 $880.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $650.000 $525.000 $825.000 $1,000.000 $880.000
CMP (GAL STL 24 IN)
LF 27.000 $90.000 $21.000 $175.000 $250.000 $165.000
RC PIPE (CL III)(30 IN)
LF 14.000 $120.000 $31.500 $210.000 $300.000 $220.000
INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT)
EA 1.000 $7,000.000 $1,575.000 $12,500.000 $15,000.000 $8,800.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $8,000.000 $5,250.000 $9,000.000 $15,000.000 $11,000.000
SET (TY II) (24 IN) (CMP) (4: 1) (C)
EA 1.000 $1,500.000 $1,050.000 $2,000.000 $10,000.000 $2,530.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,500.000 $1,050.000 $2,850.000 $10,000.000 $3,300.000
REMOV STR (INLET)
EA 1.000 $700.000 $525.000 $500.000 $5,000.000 $1,650.000
REMOV STR (SET)
EA 1.000 $600.000 $525.000 $500.000 $5,000.000 $1,100.000
REMOV STR (PIPE)
LF 6.000 $35.000 $5.250 $50.000 $5,000.000 $220.000
MOBILIZATION
LS 1.000 $263,288.000 $290,000.000 $100,000.000 $360,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,000.000 $7,500.000 $10,000.000 $18,000.000 $6,117.650
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,044.000 $25.000 $30.600 $35.000 $35.000 $63.830
ROCK FILTER DAMS (REMOVE)
LF 1,044.000 $10.000 $11.720 $10.000 $12.000 $27.850
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,560.000 $3.500 $2.640 $5.000 $5.000 $4.540
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,560.000 $1.000 $0.510 $2.000 $1.000 $1.170
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 188.000 $9.000 $8.790 $10.000 $10.000 $5.710
BIODEG EROSN CONT LOGS (REMOVE)
LF 188.000 $1.500 $0.510 $5.000 $1.000 $1.960
RUMBLE STRIPS (SHOULDER)
LF 42,270.000 $0.160 $0.110 $0.200 $0.200 $0.180
MTL W-BEAM GD FEN (TIM POST)
LF 525.000 $30.000 $28.000 $35.000 $30.000 $29.430
MTL W-BEAM GD FEN (STEEL POST)
LF 50.000 $32.000 $60.000 $60.000 $60.000 $64.350
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,000.000 $2,700.000 $2,000.000 $2,090.000
SHORT RADIUS
LF 50.000 $45.000 $40.000 $50.000 $40.000 $42.080
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,500.000 $1,500.000 $1,900.000 $1,500.000 $1,622.500
REMOVE METAL BEAM GUARD FENCE
LF 612.500 $10.000 $1.500 $3.600 $2.000 $1.710
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $350.000 $210.000 $360.000 $200.000 $220.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $300.000 $215.000 $360.000 $205.000 $225.500
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,100.000 $3,150.000 $4,100.000 $3,000.000 $3,300.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $210.000 $360.000 $200.000 $220.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 10.000 $4,200.000 $5,250.000 $6,000.000 $3,700.000 $5,500.000
CONDT (PVC) (SCH 80) (2")
LF 1,105.000 $11.000 $12.600 $14.500 $12.000 $13.200
CONDT (PVC) (SCH 80) (2") (BORE)
LF 560.000 $25.000 $36.750 $42.000 $30.000 $38.500
ELEC CONDR (NO.12) INSULATED
LF 3,330.000 $0.800 $0.790 $1.000 $1.000 $0.830
ELEC CONDR (NO.8) BARE
LF 1,665.000 $1.000 $1.310 $1.500 $1.150 $1.380
GROUND BOX TY A (122311)W/APRON
EA 9.000 $1,200.000 $1,312.500 $1,500.000 $950.000 $1,375.000
ELC SRV TY A 120/240 060(NS)AL(E)SP(O)
EA 2.000 $6,000.000 $7,350.000 $8,500.000 $5,350.000 $7,700.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 58.000 $700.000 $651.000 $775.000 $600.000 $677.600
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
EA 2.000 $800.000 $787.500 $940.000 $755.000 $952.600
REMOVE SM RD SN SUP&AM
EA 37.000 $100.000 $105.000 $125.000 $75.000 $83.380
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 13.000 $40.000 $28.350 $32.500 $20.000 $29.700
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 5.000 $40.000 $28.350 $32.500 $22.000 $29.700
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 21,061.000 $1.000 $0.380 $0.450 $0.360 $0.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 21,209.000 $1.000 $0.380 $0.450 $0.360 $0.400
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 1,586.000 $1.200 $0.790 $2.500 $1.000 $3.810
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 220.000 $0.900 $0.950 $1.150 $0.900 $0.990
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 5,290.000 $0.400 $0.470 $0.560 $0.450 $0.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 21,061.000 $0.400 $0.470 $0.560 $0.450 $0.500
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 21,209.000 $0.400 $0.470 $0.560 $0.450 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 32.000 $20.000 $42.000 $50.000 $40.000 $44.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 5.000 $30.000 $105.000 $125.000 $100.000 $110.000
REFL PAV MRKR TY II-C-R
EA 80.000 $3.500 $10.500 $12.500 $10.000 $11.000
SP MIXES SP-C PG64-22 (LEVEL-UP)
TON 4,503.000 $95.000 $120.000 $120.110 $125.000 $134.000
SP MIXES SP-D SAC-A PG76-22
TON 7,923.000 $122.500 $130.000 $135.000 $135.000 $150.000
TACK COAT
GAL 8,987.000 $2.800 $4.500 $3.500 $4.500 $5.210
FILLING MILLED ASPHALT RUMBLE STRIPS
LF 21,209.000 $2.000 $4.500 $3.500 $3.500 $1.290
TMA (STATIONARY)
DAY 69.000 $200.000 $250.000 $500.000 $745.000 $376.320
TMA (MOBILE OPERATION)
DAY 46.000 $200.000 $500.000 $500.000 $950.000 $486.430
LEAD LED CHEVRON
EA 6.000 $2,500.000 $2,730.000 $3,250.000 $4,500.000 $9,229.000
LED CHEVRON
EA 52.000 $1,700.000 $2,100.000 $2,500.000 $2,000.000 $7,678.000
Totals: $2,896,171.500 $3,245,689.670 $3,331,155.030 $3,629,949.650 $3,727,342.167