Job Info for 0053-07-040

County: SCURRY Highway: US 84 Date: 07/01/2021 (3 years ago) Engineer's Estimate: $2,896,172 Control Number: 0053-07-040
Project: F 2021(743) District: ABILENE Time: 141 WORKING DAYS Type: INSTALL/UPGRADE ROADWAY LIGHTING

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $2,896,171.50
A. L. HELMCAMP, INC.   $3,245,689.67 1
12.07% | $349,518.17
J. H. STRAIN & SONS, INC.   $3,331,155.03 2
15.02% | $434,983.53
2.63% | $85,465.36
GILVIN-TERRILL, LTD.   $3,629,949.65 3
25.34% | $733,778.15
11.84% | $384,259.98
8.97% | $298,794.62
RK HALL, LLC   $3,727,342.16 4
28.7% | $831,170.66
14.84% | $481,652.49
2.68% | $97,392.51

Bid Items

Items: 74, 0 filtered
SCURRY US 84  |  ABILENE  |  0053-07-040  |  07/01/2021  |  $2,896,172  |  F 2021(743)  |  INSTL/UPGRADE ROADWAY LIGHTING  |  141 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate A. L. HELMCAMP, INC. J. H. STRAIN & SONS, INC. GILVIN-TERRILL, LTD. RK HALL, LLC
104 6031 REMOVING CONC (HEADWALL) CY 1.000 $250.000 $525.000 $1,000.000 $2,000.000 $2,200.000
110 6001 EXCAVATION (ROADWAY) CY 105.000 $15.000 $35.000 $75.000 $25.000 $39.770
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 7,183.000 $15.000 $20.000 $30.000 $25.000 $21.260
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 40,470.000 $0.170 $0.170 $0.170 $0.200 $0.180
164 6009 BROADCAST SEED (TEMP) (WARM) SY 20,235.000 $0.170 $0.130 $0.170 $0.150 $0.130
164 6011 BROADCAST SEED (TEMP) (COOL) SY 20,235.000 $0.170 $0.140 $0.170 $0.150 $0.140
168 6001 VEGETATIVE WATERING MG 681.100 $40.000 $15.000 $65.000 $32.000 $56.320
316 6001 ASPH (MULTI OPTION) GAL 32,352.000 $4.000 $3.750 $4.500 $4.000 $3.640
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 642.000 $150.000 $175.000 $120.000 $130.000 $176.500
354 6023 PLANE ASPH CONC PAV(0" TO 4") SY 37,838.000 $2.200 $4.000 $2.650 $2.000 $2.970
354 6051 PLANE ASPH CONC PAV (0" TO 1 1/2") SY 24,277.000 $2.000 $1.500 $1.800 $2.000 $2.190
354 6053 PLANE ASPH CONC PAV (1 1/4") SY 52,028.000 $1.200 $1.000 $1.500 $2.000 $1.750
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 80.000 $300.000 $262.500 $300.000 $250.000 $275.000
432 6001 RIPRAP (CONC)(4 IN) CY 3.000 $1,000.000 $525.000 $800.000 $2,000.000 $880.000
432 6006 RIPRAP (CONC)(CL B) CY 3.500 $950.000 $525.000 $800.000 $1,000.000 $880.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 56.000 $650.000 $525.000 $825.000 $1,000.000 $880.000
460 6003 CMP (GAL STL 24 IN) LF 27.000 $90.000 $21.000 $175.000 $250.000 $165.000
464 6007 RC PIPE (CL III)(30 IN) LF 14.000 $120.000 $31.500 $210.000 $300.000 $220.000
465 6560 INL(CMP)(PAZD-CZ)(FG)(4FTX4FT-4FTX4FT) EA 1.000 $7,000.000 $1,575.000 $12,500.000 $15,000.000 $8,800.000
466 6130 HEADWALL (CH - PW - S) (DIA= 24 IN) EA 1.000 $8,000.000 $5,250.000 $9,000.000 $15,000.000 $11,000.000
467 6377 SET (TY II) (24 IN) (CMP) (4: 1) (C) EA 1.000 $1,500.000 $1,050.000 $2,000.000 $10,000.000 $2,530.000
467 6417 SET (TY II) (30 IN) (RCP) (3: 1) (C) EA 1.000 $1,500.000 $1,050.000 $2,850.000 $10,000.000 $3,300.000
496 6002 REMOV STR (INLET) EA 1.000 $700.000 $525.000 $500.000 $5,000.000 $1,650.000
496 6004 REMOV STR (SET) EA 1.000 $600.000 $525.000 $500.000 $5,000.000 $1,100.000
496 6007 REMOV STR (PIPE) LF 6.000 $35.000 $5.250 $50.000 $5,000.000 $220.000
500 6001 MOBILIZATION LS 1.000 $263,288.000 $290,000.000 $100,000.000 $360,000.000 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 8.000 $7,000.000 $7,500.000 $10,000.000 $18,000.000 $6,117.650
506 6001 ROCK FILTER DAMS (INSTALL) (TY 1) LF 1,044.000 $25.000 $30.600 $35.000 $35.000 $63.830
506 6011 ROCK FILTER DAMS (REMOVE) LF 1,044.000 $10.000 $11.720 $10.000 $12.000 $27.850
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 4,560.000 $3.500 $2.640 $5.000 $5.000 $4.540
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 4,560.000 $1.000 $0.510 $2.000 $1.000 $1.170
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 188.000 $9.000 $8.790 $10.000 $10.000 $5.710
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 188.000 $1.500 $0.510 $5.000 $1.000 $1.960
533 6001 RUMBLE STRIPS (SHOULDER) LF 42,270.000 $0.160 $0.110 $0.200 $0.200 $0.180
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 525.000 $30.000 $28.000 $35.000 $30.000 $29.430
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 50.000 $32.000 $60.000 $60.000 $60.000 $64.350
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,000.000 $2,000.000 $2,700.000 $2,000.000 $2,090.000
540 6014 SHORT RADIUS LF 50.000 $45.000 $40.000 $50.000 $40.000 $42.080
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,500.000 $1,500.000 $1,900.000 $1,500.000 $1,622.500
542 6001 REMOVE METAL BEAM GUARD FENCE LF 612.500 $10.000 $1.500 $3.600 $2.000 $1.710
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 4.000 $350.000 $210.000 $360.000 $200.000 $220.000
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 2.000 $300.000 $215.000 $360.000 $205.000 $225.500
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,100.000 $3,150.000 $4,100.000 $3,000.000 $3,300.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 4.000 $350.000 $210.000 $360.000 $200.000 $220.000
610 6214 IN RD IL (TY SA) 40T-8 (250W EQ) LED EA 10.000 $4,200.000 $5,250.000 $6,000.000 $3,700.000 $5,500.000
618 6046 CONDT (PVC) (SCH 80) (2") LF 1,105.000 $11.000 $12.600 $14.500 $12.000 $13.200
618 6047 CONDT (PVC) (SCH 80) (2") (BORE) LF 560.000 $25.000 $36.750 $42.000 $30.000 $38.500
620 6004 ELEC CONDR (NO.12) INSULATED LF 3,330.000 $0.800 $0.790 $1.000 $1.000 $0.830
620 6007 ELEC CONDR (NO.8) BARE LF 1,665.000 $1.000 $1.310 $1.500 $1.150 $1.380
624 6002 GROUND BOX TY A (122311)W/APRON EA 9.000 $1,200.000 $1,312.500 $1,500.000 $950.000 $1,375.000
628 6004 ELC SRV TY A 120/240 060(NS)AL(E)SP(O) EA 2.000 $6,000.000 $7,350.000 $8,500.000 $5,350.000 $7,700.000
644 6027 IN SM RD SN SUP&AM TYS80(1)SA(P) EA 58.000 $700.000 $651.000 $775.000 $600.000 $677.600
644 6028 IN SM RD SN SUP&AM TYS80(1)SA(P-BM) EA 2.000 $800.000 $787.500 $940.000 $755.000 $952.600
644 6076 REMOVE SM RD SN SUP&AM EA 37.000 $100.000 $105.000 $125.000 $75.000 $83.380
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 13.000 $40.000 $28.350 $32.500 $20.000 $29.700
658 6064 INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2 EA 5.000 $40.000 $28.350 $32.500 $22.000 $29.700
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 21,061.000 $1.000 $0.380 $0.450 $0.360 $0.400
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 21,209.000 $1.000 $0.380 $0.450 $0.360 $0.400
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 1,586.000 $1.200 $0.790 $2.500 $1.000 $3.810
666 6036 REFL PAV MRK TY I (W)8"(SLD)(100MIL) LF 220.000 $0.900 $0.950 $1.150 $0.900 $0.990
666 6300 RE PM W/RET REQ TY I (W)4"(BRK)(100MIL) LF 5,290.000 $0.400 $0.470 $0.560 $0.450 $0.500
666 6303 RE PM W/RET REQ TY I (W)4"(SLD)(100MIL) LF 21,061.000 $0.400 $0.470 $0.560 $0.450 $0.500
666 6315 RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL) LF 21,209.000 $0.400 $0.470 $0.560 $0.450 $0.500
668 6076 PREFAB PAV MRK TY C (W) (24") (SLD) LF 32.000 $20.000 $42.000 $50.000 $40.000 $44.000
668 6092 PREFAB PAV MRK TY C (W) (36")(YLD TRI) EA 5.000 $30.000 $105.000 $125.000 $100.000 $110.000
672 6010 REFL PAV MRKR TY II-C-R EA 80.000 $3.500 $10.500 $12.500 $10.000 $11.000
3077 6014 SP MIXES SP-C PG64-22 (LEVEL-UP) TON 4,503.000 $95.000 $120.000 $120.110 $125.000 $134.000
3077 6065 SP MIXES SP-D SAC-A PG76-22 TON 7,923.000 $122.500 $130.000 $135.000 $135.000 $150.000
3077 6075 TACK COAT GAL 8,987.000 $2.800 $4.500 $3.500 $4.500 $5.210
5092 6001 FILLING MILLED ASPHALT RUMBLE STRIPS LF 21,209.000 $2.000 $4.500 $3.500 $3.500 $1.290
6185 6002 TMA (STATIONARY) DAY 69.000 $200.000 $250.000 $500.000 $745.000 $376.320
6185 6005 TMA (MOBILE OPERATION) DAY 46.000 $200.000 $500.000 $500.000 $950.000 $486.430
6350 6001 LEAD LED CHEVRON EA 6.000 $2,500.000 $2,730.000 $3,250.000 $4,500.000 $9,229.000
6350 6002 LED CHEVRON EA 52.000 $1,700.000 $2,100.000 $2,500.000 $2,000.000 $7,678.000
Totals: $2,896,171.50 $3,245,689.67 $3,331,155.03 $3,629,949.65 $3,727,342.17