SAN SABA RM 501 (0867-07-013)

Items: 86

County: SAN SABA
Length: N/A
Highway: RM 501
District: BROWNWOOD
Control Number: 0867-07-013
DBE Goal: N/A
Project: STP 2019(478)HES
Guaranty: N/A
Time: 204 WORKING DAYS
Engineer's Estimate: $2,557,938.00
Date: 05/08/2019 (7 years ago)
Contract Number: N/A
Type: IMPROVE GUARDRAIL-SAFETY TREAT OBJECTS-PAVED SHLDR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,557,938.00
$2,687,867.75
Over/Under Est: 5.08% $129,929.75
$3,348,091.43
Over/Under Est: 30.89% $790,153.43
Amt Left: 24.56% $660,223.68

Bid Items & Bid Tabulations

86 Total 0 of 86
SAN SABA  |  RM 501  |  BROWNWOOD  |  0867-07-013  |  05/08/2019  |  $2,557,938.00  |  STP 2019(478)HES  |  IMPROVE GUARDRAIL-SAFETY TREAT OBJEC...  |  204 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
ALLEN KELLER COMPANY
PREPARING ROW
STA 64.500 $1,500.000 $1,000.000 $1,700.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 4.000 $2,000.000 $2,500.000 $5,000.000
EXCAVATION (ROADWAY)
CY 1,073.000 $20.000 $12.000 $80.000
EXCAVATION (CHANNEL)
CY 17.000 $200.000 $200.000 $500.000
EXCAVATION (SPECIAL)
CY 1,500.000 $70.000 $70.000 $140.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 5,162.000 $30.000 $27.000 $80.000
BLADING
STA 5.500 $500.000 $500.000 $1,300.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 25,000.000 $0.750 $0.550 $0.300
BROADCAST SEED (TEMP) (WARM)
SY 12,500.000 $0.750 $0.550 $0.250
BROADCAST SEED (TEMP) (COOL)
SY 12,500.000 $0.750 $0.550 $0.250
VEGETATIVE WATERING
MG 551.000 $20.000 $5.000 $100.000
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 908.000 $120.000 $125.000 $160.000
PRIME COAT (RC-250)
GAL 959.000 $5.000 $5.500 $12.500
ASPH (AC-10)
GAL 1,144.000 $5.000 $5.000 $8.520
ASPH (AC-20-5TR)
GAL 6,079.000 $5.000 $4.000 $8.300
ASPH (CRS-2P)
GAL 1,144.000 $6.000 $6.000 $9.300
AGGR(TY-B GR-5 SAC-B)
CY 35.000 $400.000 $400.000 $700.000
AGGR(TY-PB GR-3 SAC-B)
CY 213.000 $215.000 $215.000 $360.000
CL C CONC (CULV)
CY 78.000 $2,500.000 $2,500.000 $790.000
RIPRAP (CONC)(5 IN)
CY 70.300 $600.000 $600.000 $550.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 14.000 $300.000 $300.000 $400.000
RETROFIT RAIL (TY T131RC)
LF 778.000 $300.000 $300.000 $235.000
RETROFIT RAIL (TY T631)
LF 248.330 $300.000 $300.000 $80.000
CMP AR (GAL STL DES 3)
LF 2.000 $350.000 $425.000 $85.000
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 3.000 $9,000.000 $9,000.000 $8,500.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 1.000 $10,000.000 $12,000.000 $9,750.000
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
EA 4.000 $7,000.000 $7,000.000 $6,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(3:1) (C)
EA 3.000 $10,000.000 $10,000.000 $7,900.000
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
EA 2.000 $10,000.000 $12,000.000 $9,900.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $8,000.000 $8,000.000 $7,250.000
SET (TY I)(S= 5 FT)(HW= 7 FT)(3:1) (C)
EA 8.000 $12,000.000 $13,500.000 $10,200.000
SET (TY I)(S= 6 FT)(HW= 5 FT)(3:1) (C)
EA 2.000 $12,000.000 $14,000.000 $10,530.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(3:1) (C)
EA 4.000 $9,500.000 $10,000.000 $10,860.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 8.000 $1,100.000 $1,800.000 $2,050.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 6.000 $3,200.000 $3,200.000 $2,300.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 4.000 $3,500.000 $3,700.000 $2,300.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $4,700.000 $4,700.000 $3,350.000
SET (TY II) (DES 2) (CMP) (6: 1) (P)
EA 2.000 $1,600.000 $1,200.000 $1,250.000
SET (TY II) (DES 3) (CMP) (3: 1) (C)
EA 8.000 $1,625.000 $1,400.000 $1,650.000
SET (TY II) (DES 3) (CMP) (4: 1) (C)
EA 8.000 $1,680.000 $1,500.000 $1,750.000
SET (TY II) (DES 3) (CMP) (6: 1) (P)
EA 4.000 $1,740.000 $1,700.000 $1,900.000
SET (TY II) (DES 4) (CMP) (3: 1) (C)
EA 2.000 $3,700.000 $3,700.000 $2,000.000
SET (TY II) (DES 4) (CMP) (4: 1) (C)
EA 2.000 $4,000.000 $4,000.000 $2,175.000
SET (TY II) (DES 5) (CMP) (3: 1) (C)
EA 7.000 $4,000.000 $5,500.000 $2,300.000
SET (TY II) (DES 5) (CMP) (4: 1) (C)
EA 1.000 $4,500.000 $6,100.000 $3,300.000
SET (TY II) (DES 5) (CMP) (6: 1) (P)
EA 2.000 $5,000.000 $7,100.000 $3,500.000
MOBILIZATION
LS 1.000 $275,000.000 $267,000.000 $317,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $6,000.000 $18,100.000 $26,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 120.000 $32.000 $30.000 $65.000
ROCK FILTER DAMS (REMOVE)
LF 120.000 $12.000 $5.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,900.000 $3.000 $3.000 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,900.000 $1.000 $0.500 $0.700
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,900.000 $6.000 $6.000 $7.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,900.000 $1.000 $1.000 $1.300
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $6,000.000 $6,000.000 $11,500.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 180.000 $80.000 $80.000 $215.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 180.000 $10.000 $7.000 $80.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 180.000 $30.000 $18.000 $100.000
MTL W-BEAM GD FEN (STEEL POST)
LF 4,975.000 $30.000 $35.000 $29.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,400.000 $2,400.000 $2,700.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,200.000 $1,200.000 $1,400.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 150.000 $60.000 $60.000 $75.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 6.000 $1,250.000 $1,200.000 $925.000
REMOVE METAL BEAM GUARD FENCE
LF 1,200.000 $3.000 $2.000 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 62.000 $2,800.000 $2,800.000 $3,600.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $2,000.000 $2,000.000 $1,700.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $825.000 $750.000 $2,225.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $11,000.000 $11,500.000 $17,000.000
WIRE FENCE (TY D)
LF 190.000 $30.000 $30.000 $100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $780.000 $600.000 $760.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 9.000 $400.000 $500.000 $575.000
REMOVE SM RD SN SUP&AM
EA 10.000 $115.000 $150.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 6.000 $22.000 $15.000 $17.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 193.000 $27.000 $15.000 $19.000
INSTL OM ASSM (OM-2Y)(WC)GND(BI)
EA 74.000 $65.000 $65.000 $61.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 9,115.000 $1.500 $1.500 $1.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 60.000 $22.000 $22.000 $26.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 450.000 $1.200 $7.000 $9.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 874.000 $1.500 $1.000 $4.500
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 10,600.000 $0.500 $0.600 $0.700
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 315.000 $0.650 $0.650 $0.800
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 15,575.000 $0.450 $0.600 $0.700
REFL PAV MRKR TY II-A-A
EA 214.000 $15.000 $17.000 $19.750
ELIM EXT PAV MRK & MRKS (4")
LF 3,180.000 $2.000 $2.000 $9.750
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 480.000 $15.000 $14.000 $16.500
TMA (STATIONARY)
DAY 50.000 $250.000 $250.000 $575.000
Totals: $2,557,938.000 $2,687,867.750 $3,348,091.430