Show Job Controls
Bid Cobra

SAN PATRICIO CO (0916-28-082)

Items: 51

County: SAN PATRICIO
Length: N/A
Highway: CO
District: CORPUS CHRISTI
Control Number: 0916-28-082
DBE Goal: 550.0%
Project: BR 2B24(048)
Guaranty: N/A
Time: 106 WORKING DAYS
Engineer's Estimate: $725,622.70
Date: 08/01/2024 (1 year ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ROBERT ISASSI
CHANDLER WILLIAMS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$725,622.70
$867,435.50
Over/Under Est: 19.54% $141,812.80
$878,652.50
Over/Under Est: 21.09% $153,029.80
Amt Left: 1.29% $11,217.00
Over/Under Est: 23.77% $172,468.93
Amt Left: 3.53% $30,656.13
Delta: -2.21% -$19,439.13
Over/Under Est: 25.3% $183,557.30
Amt Left: 4.81% $41,744.50
Delta: -1.23% -$11,088.37
Over/Under Est: 35.58% $258,205.97
Amt Left: 13.42% $116,393.17
Delta: -8.21% -$74,648.67
$998,446.25
Over/Under Est: 37.6% $272,823.55
Amt Left: 15.1% $131,010.75
Delta: -1.49% -$14,617.58
$999,999.90
Over/Under Est: 37.81% $274,377.20
Amt Left: 15.28% $132,564.40
Delta: -0.16% -$1,553.65
Over/Under Est: 42.93% $311,521.30
Amt Left: 19.56% $169,708.50
Delta: -3.71% -$37,144.10
Subcontractor Percentage Amount
GREGORY PILE DRIVING, INC. 7.41% $64,276.97
SOIL TECH ADVANCE INC. 0.98% $8,500.87
HIGHWAY BARRICADES AND SERVICES, LLC 0.83% $7,199.71
Total: 9.22% $79,977.55

Bid Items & Bid Tabulations

51 Total 0 of 51
SAN PATRICIO  |  CO  |  CORPUS CHRISTI  |  0916-28-082  |  08/01/2024  |  $725,622.70  |  BR 2B24(048)  |  BRIDGE REPL  |  106 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
STX CIVIL
J. CARROLL WEAVER, INC.
TEXAS STEEL INDUSTRIAL PLACING, CONCRETE DIVISION LLC
A GREATER AUSTIN DEVELOPMENT COMPANY, LLC
C. E. BARKER, LTD.
BAY LTD.
J E CONSTRUCTION SERVICES, LLC
PREPARING ROW
STA 8.000 $2,500.000 $1,000.000 $6,000.000 $1,989.810 $4,500.000 $4,700.000 $12,000.000 $5,800.000 $4,800.000
OBLITERATING ABANDONED ROAD
SY 127.000 $8.000 $10.000 $10.000 $47.880 $50.000 $78.750 $43.180 $17.500 $85.000
EXCAVATION (ROADWAY)
CY 512.000 $15.000 $35.000 $100.000 $20.490 $35.000 $42.000 $36.810 $61.000 $42.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 78.000 $30.000 $50.000 $75.000 $50.080 $40.000 $131.250 $40.910 $120.000 $45.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,914.000 $4.000 $5.000 $5.000 $2.480 $4.000 $5.250 $4.550 $6.000 $8.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 2,914.000 $2.000 $1.000 $2.000 $2.220 $1.500 $1.000 $1.230 $1.650 $2.000
VEGETATIVE WATERING
MG 53.100 $90.000 $20.000 $50.000 $25.530 $35.000 $200.000 $197.710 $75.000 $80.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 493.000 $100.000 $150.000 $150.000 $138.790 $133.000 $157.500 $118.620 $180.000 $198.000
REWORK BS MTL (TY C) (6") (ORD COMP)
STA 9.000 $4,000.000 $500.000 $50.000 $920.290 $4,000.000 $1,050.000 $477.230 $1,600.000 $830.000
PRIME COAT (MC-30)
GAL 296.000 $12.000 $10.000 $20.000 $8.230 $8.000 $15.850 $13.640 $11.000 $13.000
ASPH (MULTI OPTION)
GAL 518.000 $7.000 $7.000 $15.000 $4.750 $8.000 $11.000 $10.910 $5.400 $8.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 518.000 $7.000 $7.000 $15.000 $4.750 $8.000 $12.800 $6.820 $6.300 $9.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 12.000 $165.000 $700.000 $1,600.000 $670.600 $650.000 $1,050.000 $545.400 $400.000 $660.000
AGGR(TY-PB GR-3 OR TY-PB GR-3S)(SAC-B)
CY 14.000 $170.000 $700.000 $1,600.000 $696.130 $650.000 $920.000 $545.400 $360.000 $610.000
CEM STABIL BKFL
CY 66.900 $170.000 $250.000 $200.000 $189.970 $250.000 $363.000 $238.610 $140.000 $186.000
DRILL SHAFT (24 IN)
LF 234.000 $280.000 $400.000 $300.000 $336.330 $430.000 $284.000 $409.960 $480.000 $240.000
CL C CONC (ABUT)
CY 20.400 $2,000.000 $2,000.000 $1,500.000 $1,776.000 $1,750.000 $1,950.000 $2,856.530 $2,200.000 $2,620.000
REINF CONC SLAB (SLAB BEAM)
SF 910.000 $28.000 $60.000 $55.000 $37.740 $30.000 $51.000 $38.180 $45.000 $53.000
PRESTR CONC SLAB BEAM (5SB12)
LF 172.500 $240.000 $300.000 $300.000 $428.120 $275.000 $362.850 $376.250 $380.000 $510.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 8.000 $600.000 $1,500.000 $800.000 $777.000 $750.000 $966.000 $2,183.870 $1,700.000 $2,200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 100.000 $350.000 $250.000 $250.000 $262.070 $250.000 $300.000 $291.790 $290.000 $276.000
RIPRAP (MOW STRIP)(4 IN)
CY 6.000 $575.000 $1,000.000 $800.000 $677.100 $750.000 $1,820.000 $789.590 $1,500.000 $1,408.000
RAIL (TY T223)
LF 94.000 $155.000 $250.000 $180.000 $373.920 $150.000 $268.850 $208.620 $630.000 $408.000
CONC BOX CULV (6 FT X 3 FT)
LF 18.900 $600.000 $925.000 $850.000 $1,242.330 $1,150.000 $1,360.000 $807.060 $1,100.000 $1,210.000
CONC BOX CULV (6 FT X 2 FT)
LF 33.600 $600.000 $725.000 $750.000 $1,292.950 $1,150.000 $1,190.000 $740.310 $860.000 $1,180.000
RC PIPE (CL III)(24 IN)
LF 120.300 $150.000 $100.000 $115.000 $112.740 $140.000 $174.000 $96.010 $140.000 $162.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(3:1) (C)
EA 2.000 $12,000.000 $12,000.000 $13,000.000 $11,100.000 $13,000.000 $8,400.000 $8,835.480 $9,700.000 $12,900.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 2.000 $12,000.000 $12,000.000 $15,000.000 $11,211.000 $15,000.000 $9,000.000 $11,357.960 $12,500.000 $13,220.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 6.000 $2,500.000 $3,000.000 $3,000.000 $3,352.200 $3,500.000 $5,300.000 $2,229.330 $8,400.000 $4,985.000
REMOV STR (PIPE)
LF 232.000 $28.000 $25.000 $30.000 $22.870 $30.000 $25.000 $31.820 $17.500 $80.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $50,000.000 $30,000.000 $42,508.220 $35,000.000 $40,000.000 $25,906.500 $20,100.000 $22,180.000
MOBILIZATION
LS 1.000 $67,965.700 $85,000.000 $80,000.000 $145,000.000 $90,000.000 $98,300.000 $100,000.000 $36,700.000 $86,220.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $4,000.000 $5,000.000 $2,500.000 $3,330.000 $3,000.000 $4,600.000 $5,781.240 $1,900.000 $3,940.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 45.000 $50.000 $70.000 $85.000 $111.000 $90.000 $77.000 $95.450 $130.000 $95.000
ROCK FILTER DAMS (REMOVE)
LF 45.000 $24.000 $40.000 $50.000 $83.250 $30.000 $44.000 $54.540 $73.000 $55.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 78.000 $40.000 $20.000 $70.000 $27.750 $60.000 $25.000 $68.180 $120.000 $55.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $15.000 $10.000 $15.000 $11.100 $30.000 $11.000 $20.450 $27.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 30.000 $5.000 $15.000 $5.000 $24.830 $6.000 $22.000 $27.270 $37.000 $28.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 30.000 $2.000 $10.000 $1.000 $11.100 $2.000 $11.000 $13.640 $18.250 $15.000
INTERSECTIONS (SURF TREAT)
SY 94.000 $40.000 $125.000 $50.000 $35.040 $75.000 $55.000 $68.180 $97.000 $122.000
DRIVEWAYS (SURF TREAT)
SY 34.000 $35.000 $175.000 $50.000 $96.890 $75.000 $83.000 $68.180 $130.000 $138.000
MTL W-BEAM GD FEN (TIM POST)
LF 25.000 $36.000 $40.000 $45.000 $43.290 $35.000 $38.500 $51.950 $56.000 $59.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $2,500.000 $4,000.000 $3,700.000 $3,885.000 $3,000.000 $3,740.000 $4,669.990 $5,100.000 $4,920.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,450.000 $5,000.000 $3,300.000 $4,773.000 $3,600.000 $2,920.000 $5,828.960 $6,300.000 $4,490.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL2)
EA 1.000 $11,000.000 $30,000.000 $9,000.000 $8,500.000 $25,000.000 $35,000.000 $35,723.000 $45,593.700 $32,110.000
REMOVE SM RD SN SUP&AM
EA 1.000 $170.000 $1,000.000 $180.000 $84.360 $150.000 $150.000 $163.620 $370.000 $360.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $35.000 $200.000 $50.000 $166.500 $25.000 $44.000 $54.540 $370.000 $66.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 3.000 $70.000 $200.000 $50.000 $222.000 $30.000 $44.000 $47.720 $370.000 $66.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 6.000 $110.000 $200.000 $120.000 $277.500 $125.000 $113.000 $47.720 $740.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $14,000.000 $8,000.000 $8,000.000 $8,880.000 $17,000.000 $10,000.000 $9,544.500 $1,500.000 $19,150.000
TMA (STATIONARY)
DAY 85.000 $290.000 $70.000 $300.000 $205.350 $287.000 $260.000 $545.400 $450.000 $160.000
Totals: $725,622.700 $867,435.500 $878,652.500 $898,091.645 $909,180.000 $983,828.675 $998,446.280 $999,999.900 $1,037,144.000