Job Info for 0916-28-077

County: SAN PATRICIO Highway: CR Date: 01/06/2022 (2 years ago) Engineer's Estimate: $654,387 Control Number: 0916-28-077
Project: BR 2021(895) District: CORPUS CHRISTI Time: 96 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $654,387.29
MB WESTERN INDUSTRIAL CONTRACTING COMPANY   $796,205.35 1
21.67% | $141,818.06
TEXAS STEEL INDUSTRIAL PLACING, LLC   $863,472.21 2
31.95% | $209,084.92
8.45% | $67,266.86
CK NEWBERRY, LLC   $999,046.10 3
52.67% | $344,658.81
25.48% | $202,840.75
15.70% | $135,573.89
LUCANIA CONSTRUCTION LLC   $1,034,547.20 4
58.09% | $380,159.91
29.93% | $238,341.85
3.55% | $35,501.10
Subcontractor Percentage Amount
HB FARMER FOUNDATION, LLC 20.30% $161,629.69
AVILES CONSTRUCTION SERVICE, INC 7.12% $56,689.82
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 4.12% $32,803.66
TORO BRAVO CONSTRUCTION, LLC 3.01% $23,965.78
TEX-MIX PAVING, LLC 2.87% $22,851.09
SOIL TECH ADVANCE INC. 2.51% $19,984.75
SAPO ENGINEERING CONSULTANTS, LLC 2.51% $19,984.75
HOLES-SOUTH TEXAS LLC 2.11% $16,799.93
H & S CONSTRUCTORS, INC. 1.35% $10,748.77
1 PRIORITY ENVIRONMENTAL SERVICES, LLC 1.08% $8,599.02
HIGHWAY BARRICADES AND SERVICES, LLC 0.71% $5,653.06
HERMANOS STEEL, LLC 0.63% $5,016.09
HOUSTON SAWING & DRILLING 0.44% $3,503.30
Total: 48.76% $388,229.71

Bid Items

Items: 46, 0 filtered
SAN PATRICIO CR  |  CORPUS CHRISTI  |  0916-28-077  |  01/06/2022  |  $654,387  |  BR 2021(895)  |  BRIDGE REPL  |  96 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate MB WESTERN INDUSTRIAL CONTRACTING COMPANY TEXAS STEEL INDUSTRIAL PLACING, LLC CK NEWBERRY, LLC LUCANIA CONSTRUCTION LLC
100 6002 PREPARING ROW STA 5.000 $2,000.000 $1,525.000 $2,730.000 $2,500.000 $900.000
110 6001 EXCAVATION (ROADWAY) CY 103.000 $20.000 $45.000 $30.000 $70.000 $18.000
110 6003 EXCAVATION (SPECIAL) CY 44.000 $20.000 $18.000 $30.000 $150.000 $20.000
132 6006 EMBANKMENT (FINAL)(DENS CONT)(TY C) CY 243.000 $15.000 $28.000 $74.000 $50.000 $50.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 1,179.000 $0.300 $0.800 $1.450 $1.000 $1.400
164 6009 BROADCAST SEED (TEMP) (WARM) SY 295.000 $0.500 $0.800 $5.000 $1.000 $3.250
164 6011 BROADCAST SEED (TEMP) (COOL) SY 295.000 $0.500 $0.800 $5.000 $1.000 $3.250
168 6001 VEGETATIVE WATERING MG 22.000 $20.000 $78.000 $150.000 $20.000 $100.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 173.000 $10.000 $6.500 $12.500 $10.000 $11.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 180.000 $70.000 $138.000 $78.000 $175.000 $115.000
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 16.000 $177.000 $182.000 $225.000 $250.000 $270.000
260 6073 LIME TRT (SUBGRADE)(8") SY 712.000 $3.000 $2.500 $20.750 $15.000 $7.000
310 6009 PRIME COAT (MC-30) GAL 130.000 $4.500 $6.700 $29.500 $10.000 $10.000
316 6001 ASPH (MULTI OPTION) GAL 461.000 $3.000 $2.800 $9.500 $13.000 $10.000
316 6002 AGGR (MULTI OPTION) CY 13.000 $65.000 $32.000 $239.000 $750.000 $120.000
400 6005 CEM STABIL BKFL CY 75.000 $100.000 $154.000 $150.000 $250.000 $200.000
416 6001 DRILL SHAFT (18 IN) LF 156.000 $100.000 $145.000 $195.000 $200.000 $115.000
416 6004 DRILL SHAFT (36 IN) LF 462.000 $180.000 $301.000 $328.000 $425.000 $375.000
420 6014 CL C CONC (ABUT)(HPC) CY 51.200 $900.000 $1,070.000 $1,025.000 $1,500.000 $1,300.000
420 6030 CL C CONC (CAP)(HPC) CY 18.600 $980.000 $2,375.000 $1,150.000 $2,500.000 $1,600.000
420 6038 CL C CONC (COLUMN)(HPC) CY 6.300 $880.000 $1,975.000 $1,950.000 $3,500.000 $1,800.000
422 6001 REINF CONC SLAB SF 3,120.000 $25.000 $18.000 $22.000 $30.000 $35.000
422 6015 APPROACH SLAB CY 68.800 $500.000 $330.000 $575.000 $500.000 $850.000
425 6035 PRESTR CONC GIRDER (TX28) LF 474.520 $167.000 $180.000 $193.000 $205.000 $255.000
432 6002 RIPRAP (CONC)(5 IN) CY 61.000 $450.000 $336.000 $725.000 $550.000 $550.000
432 6031 RIPRAP (STONE PROTECTION)(12 IN) CY 72.000 $125.000 $152.000 $190.000 $250.000 $200.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 38.000 $465.000 $490.000 $725.000 $550.000 $575.000
450 6007 RAIL (TY T223)(HPC) LF 292.000 $130.000 $170.000 $115.000 $150.000 $180.000
454 6004 ARMOR JOINT (SEALED) LF 84.000 $115.000 $141.000 $85.000 $100.000 $205.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $25,000.000 $35,000.000 $40,000.000 $10,000.000 $50,000.000
500 6001 MOBILIZATION LS 1.000 $59,489.750 $75,000.000 $56,000.000 $85,000.000 $100,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 6.000 $4,000.000 $2,640.000 $1,425.000 $1,000.000 $2,250.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 100.000 $30.000 $40.000 $50.000 $30.000 $67.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 100.000 $10.000 $3.150 $20.000 $20.000 $26.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 67.000 $23.000 $7.000 $40.000 $20.000 $23.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 67.000 $8.000 $5.000 $20.000 $5.000 $6.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 830.000 $2.600 $3.000 $4.000 $4.000 $4.500
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 830.000 $0.800 $1.000 $1.750 $1.000 $1.750
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 80.000 $6.000 $8.000 $12.500 $8.000 $15.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 80.000 $1.950 $2.000 $5.000 $2.000 $9.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 275.000 $22.000 $43.000 $36.000 $30.000 $55.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $1,800.000 $3,378.000 $2,430.000 $2,500.000 $2,000.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $2,600.000 $2,317.000 $3,990.000 $4,000.000 $3,950.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 4.000 $28.000 $32.000 $50.000 $30.000 $75.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 6.000 $34.000 $36.000 $65.000 $30.000 $100.000
740 6005 ANTI - GRAFFITI COATNG(PERMNENT-TY III) SF 3,115.000 $1.000 $3.050 $3.320 $1.500 $2.000
Totals: $654,387.29 $796,205.35 $863,472.21 $999,046.10 $1,034,547.20