Show Job Controls
Bid Cobra

SAN PATRICIO CR (0916-28-072)

Items: 50

County: SAN PATRICIO
Length: N/A
Highway: CR
District: CORPUS CHRISTI
Control Number: 0916-28-072
DBE Goal: N/A
Project: BR 2023(041)
Guaranty: N/A
Time: 109 WORKING DAYS
Engineer's Estimate: $712,967.30
Date: 04/04/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
ROBERT ISASSI
ORLANDO GALLEGOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$712,967.30
$805,423.65
Over/Under Est: 12.97% $92,456.35
Over/Under Est: 21% $149,699.45
Amt Left: 7.11% $57,243.10
Over/Under Est: 31.32% $223,275.10
Amt Left: 16.24% $130,818.75
Delta: -8.53% -$73,575.65
$947,687.00
Over/Under Est: 32.92% $234,719.70
Amt Left: 17.66% $142,263.35
Delta: -1.22% -$11,444.60
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 10.72% $86,341.42
BATTEN DRILLING, INC. 5.75% $46,311.86
TEX-MIX PAVING, LLC 4.04% $32,539.12
DCC CONSTRUCTION AND SERVICES, L.L.C. 1.24% $9,987.25
Total: 21.75% $175,179.65

Bid Items & Bid Tabulations

50 Total 0 of 50
SAN PATRICIO  |  CR  |  CORPUS CHRISTI  |  0916-28-072  |  04/04/2023  |  $712,967.30  |  BR 2023(041)  |  BRIDGE REPL  |  109 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
CROSS PLUS CONSTRUCTION, LLC
LISKA CONSTRUCTION COMPANY, INC.
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.
CK NEWBERRY, LLC
PREPARING ROW
STA 7.000 $2,500.000 $550.000 $2,490.000 $5,000.000 $3,000.000
EXCAVATION (ROADWAY)
CY 132.000 $12.000 $33.000 $29.000 $50.000 $40.000
EMBANKMENT (FINAL)(DENS CONT)(TY B)
CY 116.000 $25.000 $33.000 $25.000 $50.000 $45.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 1,429.000 $2.000 $2.200 $2.000 $1.100 $2.000
BROADCAST SEED (TEMP) (WARM)
SY 715.000 $1.000 $2.200 $2.000 $1.000 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 715.000 $1.000 $2.200 $2.000 $1.000 $0.500
VEGETATIVE WATERING
MG 26.000 $90.000 $110.000 $125.000 $210.000 $35.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 545.000 $1.000 $5.500 $3.500 $2.750 $5.000
PRIME COAT (MC-30)
GAL 155.000 $12.000 $5.500 $45.000 $25.000 $20.000
ASPH (MULTI OPTION)
GAL 694.000 $5.000 $5.500 $15.000 $15.000 $9.000
AGGR (MULTI OPTION)
CY 13.000 $220.000 $5.500 $1,345.000 $1,700.000 $1,000.000
CEM STABIL BKFL
CY 34.000 $170.000 $165.000 $299.000 $350.000 $350.000
CUT & RESTORING PAV
SY 13.000 $110.000 $275.000 $325.000 $240.000 $100.000
DRILL SHAFT (24 IN)
LF 177.000 $204.000 $253.000 $313.000 $250.000 $350.000
DRILL SHAFT (30 IN)
LF 81.000 $340.000 $275.000 $450.000 $400.000 $360.000
CL C CONC (ABUT)
CY 18.400 $1,500.000 $1,100.000 $1,700.000 $1,600.000 $2,000.000
CL C CONC (CAP)
CY 6.600 $1,700.000 $2,200.000 $1,820.000 $1,800.000 $3,000.000
CL C CONC (COLUMN)
CY 4.200 $1,700.000 $2,200.000 $2,130.000 $3,000.000 $3,500.000
REINF CONC SLAB (SLAB BEAM)
SF 2,600.000 $21.000 $27.500 $32.000 $30.000 $36.000
PRESTR CONC SLAB BEAM (5SB15)
LF 495.000 $270.000 $192.500 $240.000 $315.000 $300.000
RIPRAP (CONC)(5 IN)
CY 15.000 $600.000 $165.000 $625.000 $850.000 $1,000.000
RIPRAP (STONE PROTECTION)(15 IN)
CY 247.000 $200.000 $165.000 $173.000 $275.000 $250.000
RIPRAP (MOW STRIP)(4 IN)
CY 49.000 $650.000 $550.000 $580.000 $900.000 $850.000
RAIL (TY T411)
LF 224.000 $190.000 $247.500 $315.000 $225.000 $225.000
TYPE A JOINT
LF 52.000 $70.000 $440.000 $34.000 $50.000 $200.000
RC PIPE (CL III)(18 IN)
LF 55.000 $140.000 $330.000 $282.000 $110.000 $125.000
HEADWALL (CH - PW - S) (DIA= 18 IN)
EA 1.000 $10,000.000 $27,500.000 $12,000.000 $13,000.000 $6,000.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 1.000 $1,650.000 $3,300.000 $2,350.000 $3,350.000 $2,500.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $22,000.000 $53,000.000 $43,800.000 $50,000.000
REMOV STR (PIPE)
EA 1.000 $500.000 $1.100 $3,420.000 $1,200.000 $5,000.000
MOBILIZATION
LS 1.000 $62,304.980 $127,000.000 $76,637.000 $93,600.000 $85,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $6,000.000 $4,400.000 $1,850.000 $3,600.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 15.000 $31.000 $220.000 $75.000 $79.000 $150.000
ROCK FILTER DAMS (REMOVE)
LF 15.000 $31.000 $1.100 $50.000 $50.000 $50.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 67.000 $30.000 $82.500 $40.000 $80.000 $13.000
CONSTRUCTION EXITS (REMOVE)
SY 67.000 $10.000 $1.100 $20.000 $21.000 $6.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,283.000 $4.500 $16.500 $6.250 $4.500 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,283.000 $2.000 $1.100 $2.000 $1.250 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 15.000 $7.000 $110.000 $20.000 $21.000 $30.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 15.000 $5.000 $1.100 $13.000 $13.000 $25.000
MTL W-BEAM GD FEN (TIM POST)
LF 487.500 $38.000 $38.500 $29.000 $29.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $3,300.000 $2,370.000 $2,900.000 $2,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,800.000 $4,400.000 $3,767.000 $3,800.000 $3,500.000
REMOVE SM RD SN SUP&AM
EA 4.000 $150.000 $220.000 $75.000 $150.000 $300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $30.000 $33.000 $60.000 $45.000 $35.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $40.000 $33.000 $60.000 $50.000 $40.000
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 950.000 $2.750 $11.000 $7.000 $3.000 $5.000
1
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 214.000 $118.880 $83.000 $188.000 $175.000 $200.000
1A
FL BS (RDWY DEL)(TY A GR 5)
TON 427.000 $20.000 $0.000 $0.000 $0.000 $0.000
1A
CEMENT TREAT (NEW BASE) (10")
SY 845.000 $20.000 $0.000 $0.000 $0.000 $0.000
Totals: $738,407.300 $805,423.650 $862,666.750 $936,242.400 $947,687.000