Job Info for 0916-28-072

County: SAN PATRICIO Highway: CR Date: 04/04/2023 (1 year ago) Engineer's Estimate: $712,967 Control Number: 0916-28-072
Project: BR 2023(041) District: CORPUS CHRISTI Time: 109 WORKING DAYS Type: BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $712,967.30
CROSS PLUS CONSTRUCTION, LLC   $805,423.65 1
12.97% | $92,456.35
LISKA CONSTRUCTION COMPANY, INC.   $862,666.75 2
21% | $149,699.45
7.11% | $57,243.10
A GREATER AUSTIN DEVELOPMENT COMPANY, LTD.   $936,242.40 3
31.32% | $223,275.10
16.24% | $130,818.75
8.53% | $73,575.65
CK NEWBERRY, LLC   $947,687.00 4
32.92% | $234,719.70
17.66% | $142,263.35
1.22% | $11,444.60
Subcontractor Percentage Amount
LONE STAR EROSION CONTROL 10.72% $86,341.42
BATTEN DRILLING, INC. 5.75% $46,311.86
TEX-MIX PAVING, LLC 4.03% $32,458.57
DCC CONSTRUCTION AND SERVICES, L.L.C. 1.24% $9,987.25
HOUSTON SAWING & DRILLING 0.39% $3,141.15
Total: 22.13% $178,240.25

Bid Items

Items: 50, 0 filtered
SAN PATRICIO CR  |  CORPUS CHRISTI  |  0916-28-072  |  04/04/2023  |  $712,967  |  BR 2023(041)  |  BRIDGE REPL  |  109 WORKING DAYS
Alt Item code Description Unit Quantity Engineer's Estimate CROSS PLUS CONSTRUCTION, LLC LISKA CONSTRUCTION COMPANY, INC. A GREATER AUSTIN DEVELOPMENT COMPANY, LTD. CK NEWBERRY, LLC
100 6002 PREPARING ROW STA 7.000 $2,500.000 $550.000 $2,490.000 $5,000.000 $3,000.000
110 6001 EXCAVATION (ROADWAY) CY 132.000 $12.000 $33.000 $29.000 $50.000 $40.000
132 6004 EMBANKMENT (FINAL)(DENS CONT)(TY B) CY 116.000 $25.000 $33.000 $25.000 $50.000 $45.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 1,429.000 $2.000 $2.200 $2.000 $1.100 $2.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 715.000 $1.000 $2.200 $2.000 $1.000 $0.500
164 6011 BROADCAST SEED (TEMP) (COOL) SY 715.000 $1.000 $2.200 $2.000 $1.000 $0.500
168 6001 VEGETATIVE WATERING MG 26.000 $90.000 $110.000 $125.000 $210.000 $35.000
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 545.000 $1.000 $5.500 $3.500 $2.750 $5.000
310 6009 PRIME COAT (MC-30) GAL 155.000 $12.000 $5.500 $45.000 $25.000 $20.000
316 6001 ASPH (MULTI OPTION) GAL 694.000 $5.000 $5.500 $15.000 $15.000 $9.000
316 6002 AGGR (MULTI OPTION) CY 13.000 $220.000 $5.500 $1,345.000 $1,700.000 $1,000.000
400 6005 CEM STABIL BKFL CY 34.000 $170.000 $165.000 $299.000 $350.000 $350.000
400 6006 CUT & RESTORING PAV SY 13.000 $110.000 $275.000 $325.000 $240.000 $100.000
416 6002 DRILL SHAFT (24 IN) LF 177.000 $204.000 $253.000 $313.000 $250.000 $350.000
416 6003 DRILL SHAFT (30 IN) LF 81.000 $340.000 $275.000 $450.000 $400.000 $360.000
420 6013 CL C CONC (ABUT) CY 18.400 $1,500.000 $1,100.000 $1,700.000 $1,600.000 $2,000.000
420 6029 CL C CONC (CAP) CY 6.600 $1,700.000 $2,200.000 $1,820.000 $1,800.000 $3,000.000
420 6037 CL C CONC (COLUMN) CY 4.200 $1,700.000 $2,200.000 $2,130.000 $3,000.000 $3,500.000
422 6007 REINF CONC SLAB (SLAB BEAM) SF 2,600.000 $21.000 $27.500 $32.000 $30.000 $36.000
425 6012 PRESTR CONC SLAB BEAM (5SB15) LF 495.000 $270.000 $192.500 $240.000 $315.000 $300.000
432 6002 RIPRAP (CONC)(5 IN) CY 15.000 $600.000 $165.000 $625.000 $850.000 $1,000.000
432 6032 RIPRAP (STONE PROTECTION)(15 IN) CY 247.000 $200.000 $165.000 $173.000 $275.000 $250.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 49.000 $650.000 $550.000 $580.000 $900.000 $850.000
450 6012 RAIL (TY T411) LF 224.000 $190.000 $247.500 $315.000 $225.000 $225.000
454 6021 TYPE A JOINT LF 52.000 $70.000 $440.000 $34.000 $50.000 $200.000
464 6003 RC PIPE (CL III)(18 IN) LF 55.000 $140.000 $330.000 $282.000 $110.000 $125.000
466 6128 HEADWALL (CH - PW - S) (DIA= 18 IN) EA 1.000 $10,000.000 $27,500.000 $12,000.000 $13,000.000 $6,000.000
467 6356 SET (TY II) (18 IN) (RCP) (3: 1) (C) EA 1.000 $1,650.000 $3,300.000 $2,350.000 $3,350.000 $2,500.000
496 6009 REMOV STR (BRIDGE 0 - 99 FT LENGTH) EA 1.000 $25,000.000 $22,000.000 $53,000.000 $43,800.000 $50,000.000
496 6016 REMOV STR (PIPE) EA 1.000 $500.000 $1.100 $3,420.000 $1,200.000 $5,000.000
500 6001 MOBILIZATION LS 1.000 $62,304.980 $127,000.000 $76,637.000 $93,600.000 $85,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 7.000 $6,000.000 $4,400.000 $1,850.000 $3,600.000 $5,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 15.000 $31.000 $220.000 $75.000 $79.000 $150.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 15.000 $31.000 $1.100 $50.000 $50.000 $50.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 67.000 $30.000 $82.500 $40.000 $80.000 $13.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 67.000 $10.000 $1.100 $20.000 $21.000 $6.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 1,283.000 $4.500 $16.500 $6.250 $4.500 $3.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,283.000 $2.000 $1.100 $2.000 $1.250 $2.000
506 6042 BIODEG EROSN CONT LOGS (INSTL) (18") LF 15.000 $7.000 $110.000 $20.000 $21.000 $30.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 15.000 $5.000 $1.100 $13.000 $13.000 $25.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 487.500 $38.000 $38.500 $29.000 $29.000 $30.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 4.000 $2,500.000 $3,300.000 $2,370.000 $2,900.000 $2,500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 4.000 $3,800.000 $4,400.000 $3,767.000 $3,800.000 $3,500.000
644 6076 REMOVE SM RD SN SUP&AM EA 4.000 $150.000 $220.000 $75.000 $150.000 $300.000
658 6014 INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI) EA 4.000 $30.000 $33.000 $60.000 $45.000 $35.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 8.000 $40.000 $33.000 $60.000 $50.000 $40.000
740 6005 ANTI - GRAFFITI COATNG(PERMNENT-TY III) SF 950.000 $2.750 $11.000 $7.000 $3.000 $5.000
1 247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 214.000 $118.880 $83.000 $188.000 $175.000 $200.000
1A 247 6391 FL BS (RDWY DEL)(TY A GR 5) TON 427.000 $20.000 $0.000 $0.000 $0.000 $0.000
1A 275 6031 CEMENT TREAT (NEW BASE) (10") SY 845.000 $20.000 $0.000 $0.000 $0.000 $0.000
Totals: $738,407.30 $805,423.65 $862,666.75 $936,242.40 $947,687.00