SAN PATRICIO SH 234 (0507-01-023)

Items: 90

County: SAN PATRICIO
Length: N/A
Highway: SH 234
District: CORPUS CHRISTI
Control Number: 0507-01-023
DBE Goal: N/A
Project: F 2023(607)
Guaranty: N/A
Time: 130 WORKING DAYS
Engineer's Estimate: $2,740,195.15
Date: 04/05/2023 (3 years ago)
Contract Number: N/A
Type: RESURFACE ROADWAY
Mail/Deliver Bids To: N/A
ROBERT ISASSI
ORLANDO GALLEGOS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$2,740,195.15
$3,026,453.85
Over/Under Est: 10.45% $286,258.70
Over/Under Est: 24.6% $674,212.31
Amt Left: 12.82% $387,953.61
$3,930,044.20
Over/Under Est: 43.42% $1,189,849.05
Amt Left: 29.86% $903,590.35
Delta: -15.10% -$515,636.74
Subcontractor Percentage Amount
STX CIVIL 19.85% $663,660.61
HIGHWAY BARRICADES AND SERVICES, LLC 1.79% $59,846.47
LONE STAR EROSION CONTROL 0.98% $32,765.11
SOIL TECH ADVANCE INC. 0.90% $30,090.41
MURRAY CONSTRUCTION 0.61% $20,394.61
Total: 24.13% $806,757.21

Bid Items & Bid Tabulations

90 Total 0 of 90
SAN PATRICIO  |  SH 234  |  CORPUS CHRISTI  |  0507-01-023  |  04/05/2023  |  $2,740,195.15  |  F 2023(607)  |  RESURF ROADWAY  |  130 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CK NEWBERRY, LLC
ANDERSON COLUMBIA CO., INC.
BAY LTD.
PREPARING ROW
STA 1.000 $2,000.000 $5,000.000 $4,000.000 $14,000.000
REMOVING CONC (PAV)
SY 21.000 $110.000 $100.000 $70.000 $150.000
REMOVING CONC (SIDEWALKS)
SY 688.000 $50.000 $30.000 $30.000 $103.000
REMOVING CONC (DRIVEWAYS)
SY 76.000 $39.000 $50.000 $38.000 $77.000
REMOVING CONC (CURB AND GUTTER)
LF 1,090.300 $10.750 $7.000 $12.000 $19.000
REMOVING CONC (WHEELCHAIR RAMP)
SY 9.000 $40.000 $100.000 $30.000 $162.000
BACKFILL (TY A)
STA 78.000 $234.000 $300.000 $400.000 $375.000
BLADING
STA 55.000 $234.000 $1,000.000 $400.000 $175.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,750.000 $5.000 $5.000 $6.000 $12.000
BLOCK SODDING
SY 2,750.000 $8.800 $9.000 $12.000 $9.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 20,058.000 $1.000 $0.400 $0.300 $0.500
BROADCAST SEED (TEMP) (WARM)
SY 10,029.000 $1.000 $0.300 $0.250 $0.500
BROADCAST SEED (TEMP) (COOL)
SY 10,029.000 $1.000 $0.300 $0.250 $0.500
VEGETATIVE WATERING
MG 781.000 $30.000 $12.000 $42.000 $35.000
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 321.000 $142.000 $175.000 $250.000 $275.000
ASPH (AC-15P OR AC-20-5TR)
GAL 13,768.000 $4.500 $4.000 $5.000 $5.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 3,539.000 $85.000 $115.000 $110.000 $80.000
PLANE ASPH CONC PAV(0" TO 2")
SY 1,590.000 $4.000 $10.000 $25.000 $24.000
CEM STABIL BKFL
CY 147.000 $170.000 $200.000 $120.000 $185.000
CUT & RESTORE CONC PAVING
SY 22.000 $146.000 $200.000 $500.000 $350.000
CUT & RESTORE ASPH PAVING
SY 701.710 $106.000 $100.000 $100.000 $200.000
CUT AND RESTORE PAV (FLEX BASE)
SY 181.000 $50.000 $85.000 $160.000 $110.000
TRENCH EXCAVATION PROTECTION
LF 412.000 $3.490 $10.000 $5.000 $45.000
CL A CONC (STEPS)
CY 1.500 $1,200.000 $2,000.000 $3,000.000 $2,900.000
RIPRAP (CONC)(FLUME)
CY 4.000 $675.000 $1,000.000 $600.000 $730.000
RIPRAP (MOW STRIP)(4 IN)
CY 23.000 $660.000 $600.000 $800.000 $615.000
RAIL (HANDRAIL)(TY C)
LF 34.000 $225.000 $300.000 $350.000 $360.000
RC PIPE (CL III)(18 IN)
LF 839.000 $140.000 $85.000 $140.000 $150.000
RC PIPE (CL III)(24 IN)
LF 611.000 $180.000 $105.000 $160.000 $155.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 1.000 $7,500.000 $7,000.000 $7,400.000 $6,900.000
INLET (COMPL)(PCU)(3FT)(NONE)
EA 2.000 $6,300.000 $7,000.000 $9,000.000 $7,000.000
INLET (COMPL)(PCU)(3FT)(RIGHT)
EA 1.000 $8,600.000 $7,500.000 $8,500.000 $7,250.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000 $7,400.000 $7,500.000 $8,500.000 $7,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 48.000 $1,800.000 $2,000.000 $3,800.000 $1,850.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 14.000 $2,900.000 $2,500.000 $4,800.000 $1,900.000
CLEAN EXIST CULVERTS
EA 3.000 $2,300.000 $5,000.000 $5,000.000 $4,200.000
REMOV STR (INLET)
EA 1.000 $960.000 $2,000.000 $2,500.000 $1,700.000
REMOV STR (PIPE)
LF 732.000 $60.000 $25.000 $36.000 $105.000
MOBILIZATION
LS 1.000 $245,985.620 $300,000.000 $330,000.000 $360,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $7,000.000 $16,125.000 $3,000.000 $14,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 60.000 $35.000 $60.000 $54.000 $72.000
ROCK FILTER DAMS (REMOVE)
LF 60.000 $15.000 $30.000 $36.000 $36.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 328.000 $4.000 $10.000 $8.000 $25.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 328.000 $1.400 $3.000 $2.500 $3.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 135.000 $7.000 $10.000 $10.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 135.000 $2.000 $5.000 $5.000 $5.000
CONC CURB & GUTTER (TY II)
LF 1,844.700 $30.000 $35.000 $50.000 $75.000
INTERSECTIONS (CONC)
SY 119.000 $121.000 $120.000 $310.000 $240.000
DRIVEWAYS (CONC)
SY 250.000 $108.000 $110.000 $180.000 $145.000
DRIVEWAYS (ACP)
SY 287.000 $80.000 $120.000 $104.000 $140.000
DRIVEWAYS (SURF TREAT)
SY 870.000 $43.000 $40.000 $64.000 $69.000
DRIVEWAYS (ACP AND CONCRETE)
SY 1,117.000 $140.000 $140.000 $152.000 $225.000
CONC SIDEWALKS (4")
SY 1,727.700 $71.900 $85.000 $94.000 $100.000
CURB RAMPS (TY 1)
EA 8.000 $3,000.000 $3,000.000 $4,040.000 $3,500.000
CURB RAMPS (TY 2)
EA 3.000 $2,800.000 $3,250.000 $7,400.000 $3,600.000
CURB RAMPS (TY 10)
EA 11.000 $4,000.000 $2,800.000 $4,400.000 $3,800.000
CONC SIDEWALK (SPECIAL)(RETAINING WALL)
SF 8.000 $75.000 $150.000 $28.000 $550.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 14,125.000 $0.180 $0.250 $0.240 $1.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 7,306.000 $0.240 $0.250 $0.360 $1.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $35.000 $35.000 $36.000 $38.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $105.000 $125.000 $120.000 $125.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $4,000.000 $4,000.000 $4,200.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 10.000 $254.000 $250.000 $240.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
EA 1.000 $1,122.000 $1,500.000 $1,380.000 $1,450.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 35.000 $465.000 $500.000 $400.000 $420.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $540.000 $750.000 $750.000 $785.000
REMOVE SM RD SN SUP&AM
EA 35.000 $115.000 $100.000 $98.000 $105.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 10.000 $42.000 $100.000 $64.000 $68.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 6.000 $101.000 $125.000 $126.000 $135.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 1,850.000 $0.300 $0.500 $0.500 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 4,678.000 $0.700 $0.500 $0.500 $1.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 94.000 $1.500 $1.100 $1.600 $5.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 789.000 $1.000 $1.150 $1.600 $5.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 544.000 $1.100 $1.000 $1.000 $1.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 326.000 $12.000 $15.000 $16.000 $18.000
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 1,693.000 $0.700 $0.550 $0.600 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 16,644.000 $0.700 $0.750 $0.800 $1.000
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 1,470.000 $0.700 $0.750 $0.800 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 5,860.000 $0.700 $0.750 $0.800 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $240.000 $200.000 $170.000 $180.000
PREFAB PAV MRK TY C (W) (WORD)
EA 7.000 $280.000 $300.000 $290.000 $300.000
PRE PM TY C (ACC PRK)(BLU)(SYMBL ONLY)
EA 4.000 $200.000 $300.000 $260.000 $270.000
REFL PAV MRKR TY I-C
EA 29.000 $6.000 $5.000 $4.400 $5.000
REFL PAV MRKR TY II-A-A
EA 439.000 $6.000 $5.000 $4.400 $5.000
D-GR HMA TY-B PG70-22 (LEVEL-UP)
TON 294.000 $165.000 $250.000 $180.000 $720.000
D-GR HMA TY-D SAC-B PG70-22
TON 3,918.000 $137.000 $155.000 $170.000 $180.000
TACK COAT
GAL 2,850.000 $10.000 $5.000 $5.000 $5.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 240.000 $75.000 $100.000 $130.000 $350.000
TMA (STATIONARY)
DAY 45.000 $235.000 $350.000 $176.000 $600.000
TMA (MOBILE OPERATION)
HR 16.000 $65.000 $100.000 $73.000 $650.000
Totals: $2,740,195.155 $3,026,453.850 $3,414,407.460 $3,930,044.200