SAN PATRICIO US 77 (0372-01-102)

Items: 91

County: SAN PATRICIO
Length: N/A
Highway: US 77
District: CORPUS CHRISTI
Control Number: 0372-01-102
DBE Goal: N/A
Project: NH 2018(632)
Guaranty: N/A
Time: 204 WORKING DAYS
Engineer's Estimate: $5,331,333.80
Date: 03/07/2018 (8 years ago)
Contract Number: N/A
Type: OVERLAY ROADWAY (NB AND SB LANES)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,331,333.80
1
Awarded
$5,675,786.99
Over/Under Est: 6.46% $344,453.19
Over/Under Est: 6.78% $361,661.28
Amt Left: 0.3% $17,208.09
Over/Under Est: 11.6% $618,464.50
Amt Left: 4.83% $274,011.31
Delta: -4.51% -$256,803.22
$6,329,438.27
Over/Under Est: 18.72% $998,104.47
Amt Left: 11.52% $653,651.28
Delta: -6.38% -$379,639.97

Bid Items & Bid Tabulations

91 Total 0 of 91
SAN PATRICIO  |  US 77  |  CORPUS CHRISTI  |  0372-01-102  |  03/07/2018  |  $5,331,333.80  |  NH 2018(632)  |  OVERLAY ROADWAY (NB AND SB LANES)  |  204 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
HUNTER INDUSTRIES, LTD.
HAAS-ANDERSON CONSTRUCTION, LTD.
IOC COMPANY, LLC
REMOVING CONC (CURB)
LF 381.000 $4.000 $9.800 $3.500 $6.000 $8.000
REMOVING CONCRETE(MOW STRIP)
LF 2,245.000 $8.000 $12.500 $7.500 $8.750 $15.000
BACKFILL (TY A OR B)
STA 544.000 $100.000 $72.000 $179.550 $157.000 $75.000
ASPH (MULTI OPTION)
GAL 106,442.000 $2.500 $2.400 $2.900 $2.300 $2.750
AGGR (MULTI OPTION)
CY 2,478.000 $70.000 $94.000 $81.170 $115.000 $100.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 30,020.000 $100.000 $95.000 $102.370 $108.000 $113.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(5")
SY 5,006.000 $25.000 $34.000 $27.950 $31.000 $40.000
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
SY 2,000.000 $25.000 $22.000 $26.210 $22.000 $26.000
PLAN & TEXT ASPH CONC PAV(0" TO 2")
SY 160,257.000 $1.000 $1.250 $1.120 $1.300 $1.250
CL C CONC (RAC-R)
CY 120.000 $1,000.000 $1,300.000 $1,200.000 $2,070.000 $550.000
RIPRAP (MOW STRIP)(4 IN)
CY 158.000 $450.000 $420.000 $500.000 $513.000 $450.000
CLEANING AND SEALING EXISTING JOINTS
LF 288.000 $30.000 $33.000 $32.000 $34.000 $30.000
RETROFIT RAIL (TY T223)
LF 519.300 $100.000 $130.000 $150.000 $128.000 $100.000
RETROFIT RAIL (TY SSTR)
LF 936.000 $165.000 $240.000 $170.000 $208.000 $100.000
CLEAN EXIST CULVERTS
EA 16.000 $1,200.000 $3,000.000 $1,400.000 $1,800.000 $4,000.000
MOBILIZATION
LS 1.000 $350,000.000 $456,000.000 $514,011.410 $320,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $5,000.000 $3,000.000 $2,224.610 $4,080.000 $5,000.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,475.000 $2.500 $3.300 $2.400 $3.200 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,475.000 $0.750 $0.750 $0.950 $1.050 $1.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 76.000 $5.000 $5.100 $9.000 $9.550 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 76.000 $1.000 $1.050 $3.250 $5.300 $1.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 600.000 $40.000 $50.000 $16.000 $46.000 $25.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 420.000 $50.000 $19.000 $18.000 $49.000 $20.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 20.000 $50.000 $47.000 $65.000 $49.000 $20.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,680.000 $5.000 $14.250 $12.000 $16.000 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 1,260.000 $10.000 $17.750 $14.000 $18.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 60.000 $20.000 $34.000 $50.000 $18.000 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 600.000 $13.000 $13.750 $15.000 $36.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 420.000 $10.000 $15.750 $16.000 $31.000 $10.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 20.000 $10.000 $22.000 $16.000 $31.000 $10.000
DRIVEWAYS (ACP)(TYPE 1)
SY 847.000 $35.000 $52.000 $20.670 $34.000 $21.000
DRIVEWAYS (ACP) (TYPE 2)
SY 388.000 $35.000 $73.000 $20.670 $36.000 $25.000
DRIVEWAYS (ACP)(TYPE 3)
SY 1,717.000 $30.000 $87.000 $20.670 $24.000 $25.000
RUMBLE STRIPS (SHOULDER)
LF 102,716.000 $0.150 $0.150 $0.260 $0.200 $0.260
MTL W-BEAM GD FEN (TIM POST)
LF 1,900.000 $20.000 $24.000 $23.440 $25.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 21.000 $1,500.000 $1,300.000 $1,803.000 $1,380.000 $2,100.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 8.000 $1,000.000 $1,000.000 $969.000 $1,030.000 $1,483.540
REMOVE METAL BEAM GUARD FENCE
LF 1,950.000 $2.000 $1.000 $0.960 $1.000 $7.710
REMOVE TERMINAL ANCHOR SECTION
EA 8.000 $175.000 $98.000 $95.000 $101.000 $624.840
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $165.000 $36.000 $35.000 $37.000 $603.770
GUARDRAIL END TREATMENT (INSTALL)
EA 13.000 $2,250.000 $2,400.000 $2,320.000 $2,460.000 $3,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $250.000 $56.000 $55.000 $58.000 $402.520
CRASH CUSH ATTEN (INSTL)
EA 2.000 $10,000.000 $12,200.000 $12,000.000 $9,320.000 $17,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 6.000 $1,500.000 $1,000.000 $988.000 $1,050.000 $2,000.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $900.000 $640.000 $625.000 $662.000 $850.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 5.000 $200.000 $200.000 $195.000 $207.000 $400.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $350.000 $260.000 $250.000 $265.000 $400.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 1.000 $475.000 $490.000 $475.000 $503.000 $675.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 34.000 $500.000 $440.000 $425.000 $450.000 $650.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 41.000 $500.000 $530.000 $520.000 $551.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $700.000 $580.000 $560.000 $593.000 $725.000
IN SM RD SN SUP&AM TYS80(1)SA(U-EXAL)
EA 1.000 $775.000 $780.000 $760.000 $805.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SB(P-BM)
EA 1.000 $950.000 $540.000 $525.000 $556.000 $812.500
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 1.000 $1,200.000 $1,000.000 $980.000 $1,040.000 $1,119.340
REMOVE SM RD SN SUP&AM
EA 89.000 $75.000 $46.000 $45.000 $48.000 $121.940
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 12.000 $60.000 $49.000 $48.000 $51.000 $77.790
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 10.000 $30.000 $21.000 $20.000 $21.000 $66.360
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $20.000 $21.000 $20.000 $21.000 $66.420
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 18.000 $20.000 $18.500 $18.000 $19.000 $66.420
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 25.000 $65.000 $53.000 $52.000 $55.000 $77.920
INSTL DEL ASSM (D-DY)SZ 1(FLX)GND
EA 28.000 $65.000 $53.000 $52.000 $55.000 $77.910
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 17.000 $70.000 $54.000 $53.000 $56.000 $81.540
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $25.000 $26.000 $25.000 $26.000 $69.490
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 22.000 $25.000 $26.000 $25.000 $26.000 $69.560
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 91,722.000 $0.300 $0.150 $0.140 $0.150 $0.370
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 11,945.000 $0.250 $0.150 $0.140 $0.150 $0.370
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 18,157.000 $0.600 $0.290 $0.280 $0.300 $0.730
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 14,782.000 $0.300 $0.150 $0.140 $0.150 $0.370
WK ZN PAV MRK REMOV (REFL) TY I-A
EA 466.000 $3.000 $2.600 $2.500 $2.650 $3.670
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 496.000 $3.000 $2.600 $2.500 $2.650 $3.670
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 138.000 $3.200 $2.600 $2.500 $2.650 $3.670
WK ZN PAV MRK REMOV (REFL) TY II-C-R
EA 4,193.000 $3.200 $2.600 $2.500 $2.650 $3.670
WK ZN PAV MRK REMOV (TRAF BTN) TY W
LF 9,865.000 $0.500 $1.550 $1.500 $1.600 $3.670
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
LF 9,270.000 $0.500 $1.550 $1.500 $1.600 $3.670
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 4,691.000 $0.750 $2.100 $1.760 $1.100 $0.860
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 123.000 $0.750 $3.800 $1.760 $1.100 $0.860
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 11,076.000 $0.600 $0.700 $0.700 $0.750 $1.040
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 13,680.000 $0.350 $0.330 $0.320 $0.350 $0.610
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 57,707.000 $0.350 $0.330 $0.320 $0.350 $0.610
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 54,385.000 $0.350 $0.330 $0.320 $0.350 $0.610
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 148.000 $12.000 $12.250 $12.000 $13.000 $9.790
PREFAB PAV MRK TY C (W) (ARROW)
EA 42.000 $200.000 $200.000 $190.000 $201.000 $305.790
PREFAB PAV MRK TY C (W) (WORD)
EA 42.000 $200.000 $310.000 $300.000 $318.000 $305.790
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 112.000 $30.000 $23.000 $22.000 $23.000 $136.990
REFL PAV MRKR TY II-A-A
EA 557.000 $2.500 $2.600 $2.500 $2.650 $3.060
REFL PAV MRKR TY II-C-R
EA 1,731.000 $2.500 $2.600 $2.500 $2.650 $3.670
ELIM EXT PAV MRK & MRKS (4")
LF 20,158.000 $0.500 $1.050 $0.400 $0.400 $0.920
FULL - WIDTH MOWING
CYC 2.000 $4,000.000 $4,100.000 $4,000.000 $7,100.000 $2,723.280
TREE TRIMMING / BRUSH REMOVAL
MI 1.000 $25,000.000 $20,500.000 $17,015.400 $3,180.000 $15,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 408.000 $100.000 $65.000 $63.700 $69.000 $50.000
SOLAR POWERED LED ROADSIDE SIGN
EA 1.000 $5,500.000 $4,700.000 $4,250.000 $4,500.000 $2,018.210
Totals: $5,331,333.800 $5,675,786.990 $5,692,995.080 $5,949,798.300 $6,329,438.270