Job Info for 0180-09-018

County: SAN PATRICIO Highway: SL 90 Date: 03/07/2017 (7 years ago) Engineer's Estimate: $166,264 Control Number: 0180-09-018
Project: STP 1602(610) District: CORPUS CHRISTI Time: 60 WORKING DAYS Type: LANDSCAPE WORK

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $166,264.00
TIGHT LINE CONSTRUCTION, LLC   $205,057.00 1
23.33% | $38,793.00
APEX LANDSCAPE & IRRIGATION, LLC   $213,958.00 2
28.69% | $47,694.00
4.34% | $8,901.00
BOEN LANDSCAPING & IRRIGATION, LLC   $240,640.00 3
44.73% | $74,376.00
17.35% | $35,583.00
12.47% | $26,682.00

Bid Items

Items: 23, 0 filtered
SAN PATRICIO SL 90  |  CORPUS CHRISTI  |  0180-09-018  |  03/07/2017  |  $166,264  |  STP 1602(610)  |  LANDSCAPE WORK  |  60 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate TIGHT LINE CONSTRUCTION, LLC APEX LANDSCAPE & IRRIGATION, LLC BOEN LANDSCAPING & IRRIGATION, LLC
104 6028 REMOVING CONC (MISC) SY 328.000 $13.000 $25.000 $15.000 $20.000
110 6003 EXCAVATION (SPECIAL) CY 20.000 $30.000 $100.000 $50.000 $200.000
160 6005 FURNISHING AND PLACING TOPSOIL CY 34.000 $40.000 $100.000 $50.000 $125.000
162 6002 BLOCK SODDING SY 800.000 $5.000 $7.000 $7.000 $6.500
164 6025 CELL FBR MLCH SEED(PERM)(URBAN)(SANDY) SY 200.000 $0.500 $9.000 $2.000 $12.000
168 6001 VEGETATIVE WATERING MG 17.000 $20.000 $1.000 $25.000 $300.000
170 6001 IRRIGATION SYSTEM LS 1.000 $20,000.000 $30,000.000 $50,000.000 $40,000.000
192 6004 PLANT MATERIAL (5-GAL) EA 661.000 $30.000 $35.000 $35.000 $40.000
192 6005 PLANT MATERIAL (15-GAL) EA 38.000 $100.000 $150.000 $120.000 $130.000
192 6015 LANDSCAPE EDGE LF 813.000 $25.000 $15.000 $16.000 $25.000
192 6016 PLANT BED PREPARATION SY 821.000 $10.000 $20.000 $5.000 $10.000
192 6049 PLANT MATERIAL (MIN 4' TRNK HT) (PALM) EA 13.000 $400.000 $300.000 $200.000 $340.000
192 6050 PLANT MATERIAL (MIN 6' TRNK HT) (PALM) EA 23.000 $600.000 $450.000 $400.000 $540.000
193 6001 PLANT MAINTENANCE MO 6.000 $500.000 $1,000.000 $2,500.000 $1,000.000
193 6007 IRRIGATION SYSTEM OPER AND MAINT MO 6.000 $100.000 $1,000.000 $900.000 $1,000.000
500 6001 MOBILIZATION LS 1.000 $11,000.000 $35,000.000 $15,000.000 $50,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 4.000 $3,500.000 $1,500.000 $3,000.000 $2,800.000
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 500.000 $5.000 $2.500 $2.000 $7.500
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 500.000 $1.000 $1.000 $0.500 $3.000
528 6001 COLORED TEXTURED CONC (4") SY 211.000 $85.000 $90.000 $155.000 $30.000
531 6015 CURB RAMPS (TY 20) EA 1.000 $3,500.000 $4,800.000 $4,000.000 $500.000
752 6005 TREE REMOVAL (4" - 12" DIA) EA 13.000 $600.000 $200.000 $150.000 $115.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 48.000 $75.000 $25.000 $125.000 $200.000
Totals: $166,264.00 $205,057.00 $213,958.00 $240,640.00