PREPARING ROW
|
STA
|
117.000
|
$1,200.000
|
$2,500.000
|
$16,840.000
|
$5,000.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
439.000
|
$15.000
|
$7.000
|
$2.400
|
$13.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
361.000
|
$15.000
|
$8.000
|
$2.300
|
$10.000
|
|
|
REMOVING CONC (CURB)
|
LF
|
5,881.000
|
$6.500
|
$4.000
|
$3.150
|
$2.250
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
905.000
|
$5.000
|
$5.000
|
$3.190
|
$5.650
|
|
|
REMOVING CONC (RETAINING WALLS)
|
SY
|
354.000
|
$30.000
|
$25.000
|
$42.000
|
$8.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
682.000
|
$12.000
|
$14.000
|
$11.000
|
$54.000
|
|
|
REMOVING CONC (MISC)
|
CY
|
10.000
|
$55.000
|
$76.000
|
$70.000
|
$700.000
|
|
|
REMOVING STAB BASE & ASPH PAV(12"-27")
|
SY
|
64,942.000
|
$5.000
|
$6.500
|
$8.420
|
$9.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
76,875.000
|
$6.000
|
$5.500
|
$6.380
|
$5.750
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
5,582.000
|
$15.000
|
$5.000
|
$13.000
|
$4.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
52,414.000
|
$16.000
|
$3.500
|
$2.440
|
$11.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
134,699.000
|
$0.150
|
$0.300
|
$0.080
|
$0.080
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
67,350.000
|
$0.150
|
$0.200
|
$0.120
|
$0.120
|
|
|
FERTILIZER
|
AC
|
1.530
|
$600.000
|
$160.000
|
$1,381.390
|
$1,400.000
|
|
|
FERTILIZER
|
TON
|
5.180
|
$1,000.000
|
$660.000
|
$1,358.490
|
$1,400.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,357.200
|
$10.000
|
$19.750
|
$24.850
|
$25.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
35,970.000
|
$48.000
|
$53.000
|
$43.330
|
$64.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
2,657.000
|
$150.000
|
$200.000
|
$175.000
|
$188.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
117,257.000
|
$2.500
|
$3.000
|
$3.450
|
$6.650
|
|
|
CEMENT
|
TON
|
162.000
|
$150.000
|
$170.000
|
$146.390
|
$201.000
|
|
|
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
|
SY
|
7,006.000
|
$10.000
|
$18.500
|
$3.560
|
$20.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
21,102.000
|
$3.500
|
$3.900
|
$4.070
|
$4.100
|
|
|
ASPH (AC-10)
|
GAL
|
40,079.000
|
$3.000
|
$2.800
|
$3.000
|
$2.200
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
46,900.000
|
$3.500
|
$4.400
|
$4.580
|
$3.050
|
|
|
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
|
CY
|
861.000
|
$75.000
|
$145.000
|
$122.090
|
$200.000
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
581.000
|
$75.000
|
$90.000
|
$94.620
|
$147.000
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
342.000
|
$75.000
|
$180.000
|
$185.180
|
$300.000
|
|
|
D-GR HMA TY B SAC-B PG (64-22)
|
TON
|
27,988.000
|
$67.000
|
$85.000
|
$89.740
|
$83.000
|
|
|
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
|
TON
|
24,598.000
|
$67.000
|
$88.000
|
$97.680
|
$100.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
123,406.000
|
$1.250
|
$1.900
|
$1.510
|
$1.350
|
|
|
CONC PVMT (CONT REINF - CRCP) (20")
|
SY
|
5,804.000
|
$140.000
|
$200.000
|
$128.000
|
$174.000
|
|
|
CONC PVMT(CRCP)(TRANSITION SLAB)
|
SY
|
1,202.000
|
$100.000
|
$210.000
|
$50.000
|
$166.000
|
|
|
CEM STABIL BKFL
|
CY
|
5,231.000
|
$90.000
|
$56.000
|
$58.000
|
$92.000
|
|
|
CUT & RESTORING PAV
|
SY
|
275.000
|
$160.000
|
$91.000
|
$100.000
|
$185.000
|
|
|
CUT & RESTORE CONC PAVING
|
SY
|
172.000
|
$175.000
|
$270.000
|
$40.000
|
$360.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
5,056.000
|
$1.500
|
$1.150
|
$2.000
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,255.000
|
$15.000
|
$14.000
|
$25.000
|
$22.000
|
|
|
PRESTR CONC PIL (16 IN SQ)
|
LF
|
27,305.000
|
$60.000
|
$60.000
|
$50.000
|
$86.000
|
|
|
PRESTR CONC PIL (18 IN SQ)
|
LF
|
5,460.000
|
$90.000
|
$80.000
|
$63.000
|
$92.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
24.000
|
$150.000
|
$150.000
|
$138.250
|
$120.000
|
|
|
DRILL SHAFT (SIGN MTS) (36 IN)
|
LF
|
166.000
|
$200.000
|
$530.000
|
$475.050
|
$270.000
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
54.000
|
$450.000
|
$570.000
|
$512.050
|
$485.000
|
|
|
DRILL SHAFT (SIGN MTS) (54 IN)
|
LF
|
66.000
|
$400.000
|
$820.000
|
$731.500
|
$610.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
650.000
|
$400.000
|
$820.000
|
$731.750
|
$755.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
152.000
|
$200.000
|
$200.000
|
$177.000
|
$190.000
|
|
|
DRILL SHAFT (120 IN)
|
LF
|
340.000
|
$1,400.000
|
$2,200.000
|
$2,125.000
|
$2,000.000
|
|
|
CL C CONC (ABUT)
|
CY
|
162.000
|
$700.000
|
$920.000
|
$1,170.000
|
$1,400.000
|
|
|
CL C CONC (CAP)
|
CY
|
1,007.300
|
$900.000
|
$920.000
|
$910.000
|
$1,200.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
432.400
|
$1,000.000
|
$950.000
|
$810.000
|
$1,200.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
1,265.200
|
$900.000
|
$740.000
|
$735.000
|
$830.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
255.600
|
$1,000.000
|
$820.000
|
$755.000
|
$780.000
|
|
|
CL C CONC (FOOTING)
|
CY
|
1,074.200
|
$800.000
|
$590.000
|
$805.000
|
$700.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
126.700
|
$650.000
|
$610.000
|
$465.000
|
$630.000
|
|
|
REINF CONC SLAB
|
SF
|
276,744.000
|
$18.000
|
$17.500
|
$15.200
|
$17.900
|
|
|
RETAINING WALL (MSE)
|
SF
|
36,361.000
|
$30.000
|
$44.000
|
$52.000
|
$56.000
|
|
|
PRESTR CONC GIRDER (TX46)
|
LF
|
1,551.000
|
$125.000
|
$130.000
|
$120.000
|
$138.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
35,064.930
|
$130.000
|
$130.000
|
$113.000
|
$133.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
3,720.000
|
$0.500
|
$0.270
|
$1.100
|
$0.250
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
264.000
|
$400.000
|
$550.000
|
$455.000
|
$435.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
9.000
|
$350.000
|
$650.000
|
$470.000
|
$455.000
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
284.000
|
$400.000
|
$575.000
|
$483.000
|
$475.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
276.000
|
$65.000
|
$110.000
|
$75.480
|
$155.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
94.000
|
$90.000
|
$120.000
|
$111.290
|
$176.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
250.000
|
$500.000
|
$625.000
|
$516.350
|
$430.000
|
|
|
RAIL (TY SSTR)
|
LF
|
17,918.700
|
$60.000
|
$58.000
|
$37.000
|
$55.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
891.000
|
$100.000
|
$91.000
|
$117.000
|
$105.000
|
|
|
ARMOR JOINT (SEALED)
|
LF
|
97.000
|
$65.000
|
$100.000
|
$141.000
|
$830.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)
|
LF
|
210.000
|
$235.000
|
$280.000
|
$282.000
|
$240.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
1,230.000
|
$220.000
|
$250.000
|
$343.000
|
$250.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)
|
LF
|
1,584.000
|
$365.000
|
$320.000
|
$300.000
|
$330.000
|
|
|
CONC BOX CULV (10 FT X 10 FT)
|
LF
|
451.000
|
$760.000
|
$770.000
|
$920.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
430.000
|
$60.000
|
$90.000
|
$44.000
|
$50.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
2,878.000
|
$75.000
|
$69.000
|
$57.000
|
$60.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
100.000
|
$120.000
|
$82.000
|
$83.000
|
$73.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
157.000
|
$115.000
|
$120.000
|
$88.000
|
$73.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
4.000
|
$5,425.000
|
$3,600.000
|
$3,850.000
|
$4,600.000
|
|
|
INLET (COMPL)(PCO)(3FT)(NONE)
|
EA
|
4.000
|
$3,700.000
|
$2,700.000
|
$3,350.000
|
$4,400.000
|
|
|
INLET (COMPL)(PCO)(4FT)(LEFT)
|
EA
|
2.000
|
$5,000.000
|
$3,300.000
|
$3,950.000
|
$4,900.000
|
|
|
INLET (COMPL)(PCO)(4FT)(BOTH)
|
EA
|
1.000
|
$5,000.000
|
$3,500.000
|
$6,060.000
|
$5,200.000
|
|
|
INLET (COMPL)(PSL)(RC)(3FTX3FT)
|
EA
|
1.000
|
$5,000.000
|
$2,400.000
|
$3,765.000
|
$4,100.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
25.000
|
$4,600.000
|
$3,100.000
|
$3,765.000
|
$4,750.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX3FT)
|
EA
|
2.000
|
$6,500.000
|
$4,600.000
|
$3,765.000
|
$5,580.000
|
|
|
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
|
EA
|
6.000
|
$2,650.000
|
$3,300.000
|
$3,765.000
|
$4,950.000
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
2.000
|
$5,000.000
|
$5,900.000
|
$4,265.000
|
$4,760.000
|
|
|
INLET (COMPL)(TY A)(SPL)
|
EA
|
2.000
|
$3,100.000
|
$8,300.000
|
$3,265.000
|
$5,050.000
|
|
|
JCT BOX (COMPL)(SPL)
|
EA
|
2.000
|
$15,000.000
|
$7,500.000
|
$4,765.000
|
$4,420.000
|
|
|
WINGWALL (FW - S) (HW=6 FT)
|
EA
|
1.000
|
$6,000.000
|
$14,700.000
|
$38,800.000
|
$16,400.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$43,500.000
|
$69,400.000
|
$78,900.000
|
$71,300.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$12,000.000
|
$11,900.000
|
$15,550.000
|
$16,500.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$10,500.000
|
$13,200.000
|
$23,400.000
|
$16,100.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$680.000
|
$700.000
|
$790.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$1,500.000
|
$760.000
|
$750.000
|
$790.000
|
|
|
GRATE & FRAME
|
EA
|
4.000
|
$1,000.000
|
$1,600.000
|
$2,440.000
|
$1,980.000
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
200.000
|
$420.000
|
$280.000
|
$70.000
|
$390.000
|
|
|
ADJUSTING INLETS
|
EA
|
1.000
|
$1,300.000
|
$1,000.000
|
$420.000
|
$1,970.000
|
|
|
PIPE (PVC) (SCH 40) (8 IN)
|
LF
|
228.000
|
$50.000
|
$22.000
|
$26.000
|
$155.000
|
|
|
REMOV STR (INLET)
|
EA
|
19.000
|
$500.000
|
$500.000
|
$425.000
|
$96.000
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$350.000
|
$400.000
|
$650.000
|
$560.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$1,200.000
|
$2,100.000
|
$6,400.000
|
$2,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
908.000
|
$15.000
|
$16.000
|
$11.000
|
$18.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
796.000
|
$50.000
|
$20.950
|
$80.000
|
$96.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,300,000.000
|
$3,254,101.000
|
$4,050,000.000
|
$5,330,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
32.000
|
$3,500.000
|
$14,500.000
|
$12,000.000
|
$19,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
192.000
|
$30.000
|
$30.000
|
$27.310
|
$28.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
192.000
|
$10.000
|
$21.000
|
$9.590
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
333.000
|
$25.000
|
$30.000
|
$30.280
|
$31.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
333.000
|
$8.000
|
$18.250
|
$9.630
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,370.000
|
$3.000
|
$2.500
|
$2.030
|
$2.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,370.000
|
$1.000
|
$1.050
|
$0.770
|
$0.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,815.000
|
$6.000
|
$5.400
|
$4.910
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,815.000
|
$2.000
|
$1.100
|
$0.540
|
$0.550
|
|
|
CONSTRUCTING DETOURS
|
SY
|
23,829.000
|
$48.000
|
$45.000
|
$48.350
|
$70.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
14,190.000
|
$10.000
|
$30.000
|
$15.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
1,680.000
|
$15.000
|
$7.000
|
$50.000
|
$85.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$40.000
|
$30.000
|
$58.000
|
$85.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
42,540.000
|
$15.000
|
$6.400
|
$3.200
|
$11.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
160.000
|
$5.000
|
$9.100
|
$10.000
|
$20.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
80.000
|
$10.000
|
$9.100
|
$30.000
|
$17.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
14,190.000
|
$10.000
|
$8.500
|
$3.000
|
$15.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
1,680.000
|
$10.000
|
$10.250
|
$4.500
|
$14.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$10.000
|
$10.500
|
$4.500
|
$17.000
|
|
|
PTB (FUR & INST)(STEEL)
|
LF
|
640.500
|
$200.000
|
$375.000
|
$520.000
|
$580.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
3,552.000
|
$60.000
|
$56.000
|
$72.730
|
$80.000
|
|
|
PERM CTB (SSCB)(TY 3)(MOD)
|
LF
|
182.000
|
$135.000
|
$160.000
|
$417.000
|
$310.000
|
|
|
PERM CTB (SGL SLOPE)(SPLIT)(MOD)
|
LF
|
2,554.000
|
$100.000
|
$59.000
|
$152.000
|
$110.000
|
|
|
CONC CURB (TY II)
|
LF
|
5,524.000
|
$18.000
|
$8.600
|
$10.000
|
$13.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
726.000
|
$30.000
|
$25.000
|
$25.000
|
$25.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,851.000
|
$25.000
|
$69.000
|
$30.000
|
$38.000
|
|
|
CONC SIDEWALKS (6")
|
SY
|
350.000
|
$60.000
|
$83.000
|
$53.250
|
$55.000
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$1,500.000
|
$1,900.000
|
$1,324.000
|
$1,360.000
|
|
|
CURB RAMPS (TY 2)
|
EA
|
6.000
|
$1,630.000
|
$1,900.000
|
$1,335.000
|
$1,370.000
|
|
|
CURB RAMPS (TY 22)
|
EA
|
2.000
|
$2,500.000
|
$2,900.000
|
$3,300.000
|
$5,400.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,000.000
|
$30.000
|
$26.000
|
$22.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,800.000
|
$1,800.000
|
$1,700.000
|
$2,200.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$2,000.000
|
$1,100.000
|
$1,150.000
|
$1,000.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
984.000
|
$10.000
|
$2.800
|
$2.100
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,500.000
|
$3,000.000
|
$2,400.000
|
$2,750.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
12.000
|
$18,850.000
|
$9,400.000
|
$8,225.000
|
$9,500.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
33.000
|
$900.000
|
$1,600.000
|
$920.000
|
$3,400.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
20.000
|
$700.000
|
$1,100.000
|
$521.000
|
$1,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
|
EA
|
10.000
|
$14,000.000
|
$16,400.000
|
$28,100.000
|
$15,600.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
5,245.000
|
$40.000
|
$30.000
|
$27.000
|
$36.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
32.000
|
$250.000
|
$360.000
|
$323.000
|
$240.000
|
|
|
IN RD IL (U/P) (TY 2) (150W EQ) LED
|
EA
|
3.000
|
$965.000
|
$1,500.000
|
$1,360.000
|
$1,850.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
19.000
|
$3,000.000
|
$3,300.000
|
$2,922.000
|
$2,800.000
|
|
|
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
|
EA
|
20.000
|
$5,000.000
|
$5,400.000
|
$4,801.000
|
$5,400.000
|
|
|
HI MST IL POLE (125 FT)(100 MPH)
|
EA
|
13.000
|
$30,000.000
|
$33,600.000
|
$30,133.000
|
$31,200.000
|
|
|
HI MST IL ASM (12-400W)ASYM(TY A)SHLD
|
EA
|
3.000
|
$30,000.000
|
$31,400.000
|
$28,160.000
|
$33,800.000
|
|
|
HI MST IL ASM (12-400W)ASYM(TY B)SHLD
|
EA
|
10.000
|
$30,000.000
|
$32,000.000
|
$28,680.000
|
$34,500.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
9,111.000
|
$11.000
|
$13.250
|
$11.960
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (3")
|
LF
|
392.000
|
$15.000
|
$22.000
|
$19.670
|
$17.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
3,105.000
|
$22.000
|
$22.000
|
$19.570
|
$36.000
|
|
|
CONDT (RM) (1")
|
LF
|
115.000
|
$20.000
|
$40.000
|
$35.450
|
$37.000
|
|
|
ELEC CONDR (NO.12) BARE
|
LF
|
115.000
|
$1.000
|
$1.400
|
$1.250
|
$1.400
|
|
|
ELEC CONDR (NO.12) INSULATED
|
LF
|
230.000
|
$1.500
|
$1.400
|
$1.250
|
$1.300
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
16,350.000
|
$1.500
|
$1.450
|
$1.320
|
$1.300
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
32,920.000
|
$1.500
|
$1.600
|
$1.440
|
$12.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
19.000
|
$1,000.000
|
$1,800.000
|
$1,580.000
|
$830.000
|
|
|
ELC SRV TY D 120/240 100(NS)SS(T)GC(O)
|
EA
|
6.000
|
$7,500.000
|
$9,000.000
|
$8,025.000
|
$6,000.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
228.750
|
$22.000
|
$21.000
|
$22.000
|
$20.000
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
2,184.750
|
$20.000
|
$26.000
|
$22.000
|
$18.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
8.000
|
$450.000
|
$700.000
|
$725.000
|
$640.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
24.000
|
$550.000
|
$820.000
|
$625.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
5.000
|
$650.000
|
$820.000
|
$855.000
|
$750.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P)
|
EA
|
4.000
|
$1,300.000
|
$1,900.000
|
$200.000
|
$1,770.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
8.000
|
$500.000
|
$640.000
|
$490.000
|
$580.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
29.000
|
$60.000
|
$95.000
|
$55.000
|
$310.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,076.700
|
$4.000
|
$5.600
|
$5.050
|
$3.000
|
|
|
RELOCATE LRSA
|
EA
|
1.000
|
$2,000.000
|
$3,600.000
|
$3,180.000
|
$3,300.000
|
|
|
INS OH SN SUP(30 FT CANT)
|
EA
|
2.000
|
$20,000.000
|
$21,300.000
|
$19,100.000
|
$16,700.000
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$22,225.000
|
$24,000.000
|
$21,510.000
|
$20,000.000
|
|
|
INS OH SN SUP(40 FT CANT)
|
EA
|
2.000
|
$22,800.000
|
$27,300.000
|
$24,480.000
|
$20,700.000
|
|
|
INS OH SN SUP(65 FT BRDG)
|
EA
|
1.000
|
$20,000.000
|
$32,400.000
|
$29,060.000
|
$37,000.000
|
|
|
INS OH SN SUP(75 FT BRDG)
|
EA
|
1.000
|
$34,500.000
|
$34,900.000
|
$31,260.000
|
$40,000.000
|
|
|
INS OH SN SUP(80 FT BRDG)
|
EA
|
2.000
|
$28,000.000
|
$37,700.000
|
$33,790.000
|
$42,000.000
|
|
|
REMOVE OVERHD SIGN SUP
|
EA
|
4.000
|
$8,500.000
|
$4,700.000
|
$4,200.000
|
$3,500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
49.000
|
$85.000
|
$95.000
|
$70.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
66.000
|
$18.000
|
$22.000
|
$11.000
|
$12.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
16.000
|
$25.000
|
$28.000
|
$18.000
|
$51.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
83.000
|
$20.000
|
$22.000
|
$11.000
|
$19.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
18.000
|
$16.000
|
$22.000
|
$11.000
|
$26.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
40.000
|
$65.000
|
$73.000
|
$85.000
|
$40.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
12,553.000
|
$0.150
|
$0.550
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
926.000
|
$0.250
|
$0.600
|
$0.550
|
$0.600
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
43,428.000
|
$0.150
|
$0.550
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
9,893.000
|
$0.350
|
$1.100
|
$1.000
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
39,322.000
|
$0.200
|
$0.550
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
21,308.000
|
$0.550
|
$0.650
|
$0.600
|
$0.600
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
1,553.000
|
$0.550
|
$0.950
|
$0.850
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
112,372.000
|
$0.550
|
$0.750
|
$0.650
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
28,817.000
|
$1.000
|
$1.500
|
$1.350
|
$1.400
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
116,972.000
|
$0.550
|
$0.750
|
$0.650
|
$0.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
11,656.700
|
$0.750
|
$0.850
|
$0.750
|
$0.800
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
615.900
|
$2.000
|
$1.650
|
$1.500
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
2,198.600
|
$1.500
|
$2.800
|
$2.500
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
673.700
|
$6.000
|
$5.600
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
38.000
|
$110.000
|
$73.000
|
$65.000
|
$70.000
|
|
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
|
EA
|
9.000
|
$175.000
|
$130.000
|
$115.000
|
$120.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
41.000
|
$135.000
|
$120.000
|
$110.000
|
$115.000
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
464.800
|
$0.800
|
$0.850
|
$0.750
|
$0.800
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
225.600
|
$5.000
|
$5.600
|
$5.000
|
$5.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
129,293.500
|
$0.100
|
$0.140
|
$0.120
|
$0.130
|
|
|
PAVEMENT SEALER 8"
|
LF
|
12,714.300
|
$0.300
|
$0.210
|
$0.190
|
$0.200
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,198.600
|
$1.000
|
$0.290
|
$0.260
|
$0.300
|
|
|
PAVEMENT SEALER 24"
|
LF
|
899.300
|
$2.500
|
$0.500
|
$0.470
|
$0.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
47.000
|
$40.000
|
$3.400
|
$3.000
|
$3.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
41.000
|
$50.000
|
$3.400
|
$3.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
15,126.000
|
$0.400
|
$0.400
|
$0.360
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
57,945.500
|
$0.300
|
$0.390
|
$0.350
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
56,222.000
|
$0.300
|
$0.390
|
$0.350
|
$0.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
118.000
|
$2.500
|
$4.200
|
$3.750
|
$4.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
1,471.000
|
$3.000
|
$3.900
|
$3.500
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
76,109.000
|
$1.000
|
$1.100
|
$0.350
|
$0.500
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
9,188.000
|
$0.500
|
$1.250
|
$2.300
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
129,293.500
|
$0.100
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
12,714.300
|
$0.100
|
$0.050
|
$0.040
|
$0.040
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,198.600
|
$0.400
|
$0.060
|
$0.060
|
$0.060
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
899.300
|
$1.000
|
$0.140
|
$0.120
|
$0.140
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
47.000
|
$15.000
|
$0.220
|
$0.200
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
41.000
|
$20.000
|
$0.220
|
$0.200
|
$0.250
|
|
|
POST AND CABLE FENCE (REMOVAL)
|
LF
|
4,607.000
|
$4.000
|
$4.500
|
$4.500
|
$2.000
|
|
|
POST AND CABLE FENCE (REMV CONC ANCHOR)
|
EA
|
3.000
|
$1,200.000
|
$1,400.000
|
$350.000
|
$3,100.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY I)
|
SY
|
110,249.000
|
$2.000
|
$1.200
|
$0.880
|
$1.300
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$7,000.000
|
$21,100.000
|
$10,000.000
|
$32,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
88.000
|
$10.000
|
$220.000
|
$196.000
|
$230.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
152.000
|
$50.000
|
$54.000
|
$70.000
|
$25.000
|
|
Totals: |
$39,815,128.325
|
$43,149,145.765
|
$43,180,347.918
|
$51,853,356.615
|