Show Job Controls
Bid Cobra

SAN PATRICIO US 181 (0101-04-097)

Items: 227

County: SAN PATRICIO
Length: N/A
Highway: US 181
District: CORPUS CHRISTI
Control Number: 0101-04-097
DBE Goal: N/A
Project: NH 1702(490)
Guaranty: N/A
Time: 500 WORKING DAYS
Engineer's Estimate: $39,815,128.32
Date: 08/07/2018 (7 years ago)
Contract Number: N/A
Type: GRAD,STRS,BASE & SURFACING
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$39,815,128.32
1
Awarded
$43,149,145.73
Over/Under Est: 8.37% $3,334,017.41
Over/Under Est: 8.45% $3,365,219.54
Amt Left: 0.07% $31,202.13
Over/Under Est: 30.24% $12,038,228.28
Amt Left: 20.17% $8,704,210.87
Delta: -20.09% -$8,673,008.74
Subcontractor Percentage Amount
THE LEVY COMPANY, INC. 4.19% $2,183,684.33
TAHOE TRUCKING LLC 2.32% $1,209,104.45
GREGORY PILE DRIVING, INC. 2.29% $1,193,469.48
KLP COMMERCIAL, L.L.C. 2.08% $1,084,024.68
WEBBER, LLC 1.45% $755,690.28
A. H. BECK FOUNDATION CO., INC. 1.20% $625,398.85
HIGHWAY BARRICADES AND SERVICES, LLC 1.16% $604,552.22
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.86% $448,202.51
GARRET SHIELDS INFRASTRUCTURE 0.59% $307,487.77
GDC GRIFFIN DEWATERING, LLC 0.57% $297,064.46
K. L. DURHAM CONSTRUCTION, L.L.C. 0.52% $271,006.17
JB PINNACLE GROUP, LLC 0.51% $265,794.51
A.Z. REBAR CONSTRUCTION, INC. 0.50% $260,582.86
MUNOZ ENGINEERING 0.29% $151,138.06
SCOTT DERR PAINTING CO, LLC 0.29% $151,138.06
JHABORES CONSTRUCTION CO., INC. 0.23% $119,868.11
SOUTH TEXAS PAINTING 0.19% $99,021.49
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.08% $41,693.26
D & C CONCRETE CUTTING, INC. 0.07% $36,481.60
MUNOZ FOUNDATION DRILLING, INC. 0.00% $0.00
Total: 19.39% $10,105,403.15

Bid Items & Bid Tabulations

227 Total 0 of 227
SAN PATRICIO  |  US 181  |  CORPUS CHRISTI  |  0101-04-097  |  08/07/2018  |  $39,815,128.32  |  NH 1702(490)  |  GRAD,STRS,BASE & SURF  |  500 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BAY LTD.
AUSTIN BRIDGE & ROAD SERVICES, LP
ANDERSON COLUMBIA CO., INC.
PREPARING ROW
STA 117.000 $1,200.000 $2,500.000 $16,840.000 $5,000.000
REMOVING CONC (RIPRAP)
SY 439.000 $15.000 $7.000 $2.400 $13.000
REMOVING CONC (SIDEWALKS)
SY 361.000 $15.000 $8.000 $2.300 $10.000
REMOVING CONC (CURB)
LF 5,881.000 $6.500 $4.000 $3.150 $2.250
REMOVING CONC (CURB AND GUTTER)
LF 905.000 $5.000 $5.000 $3.190 $5.650
REMOVING CONC (RETAINING WALLS)
SY 354.000 $30.000 $25.000 $42.000 $8.000
REMOVE CONC (RAIL)
LF 682.000 $12.000 $14.000 $11.000 $54.000
REMOVING CONC (MISC)
CY 10.000 $55.000 $76.000 $70.000 $700.000
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 64,942.000 $5.000 $6.500 $8.420 $9.750
EXCAVATION (ROADWAY)
CY 76,875.000 $6.000 $5.500 $6.380 $5.750
EXCAVATION (SPECIAL)
CY 5,582.000 $15.000 $5.000 $13.000 $4.500
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 52,414.000 $16.000 $3.500 $2.440 $11.000
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 134,699.000 $0.150 $0.300 $0.080 $0.080
DRILL SEEDING (TEMP) (WARM)
SY 67,350.000 $0.150 $0.200 $0.120 $0.120
FERTILIZER
AC 1.530 $600.000 $160.000 $1,381.390 $1,400.000
FERTILIZER
TON 5.180 $1,000.000 $660.000 $1,358.490 $1,400.000
VEGETATIVE WATERING
MG 2,357.200 $10.000 $19.750 $24.850 $25.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 35,970.000 $48.000 $53.000 $43.330 $64.000
LIME (HYDRATED LIME (SLURRY))
TON 2,657.000 $150.000 $200.000 $175.000 $188.000
LIME TRT (SUBGRADE)(8")
SY 117,257.000 $2.500 $3.000 $3.450 $6.650
CEMENT
TON 162.000 $150.000 $170.000 $146.390 $201.000
CEM TRT(PLNT MX) (CL L)(TYA)(GR1-2)(6")
SY 7,006.000 $10.000 $18.500 $3.560 $20.000
PRIME COAT (MC-30)
GAL 21,102.000 $3.500 $3.900 $4.070 $4.100
ASPH (AC-10)
GAL 40,079.000 $3.000 $2.800 $3.000 $2.200
ASPH (AC-20-5TR)
GAL 46,900.000 $3.500 $4.400 $4.580 $3.050
AGGR(TY-PB GR-4S OR TY-PB GR-4)(SAC-B)
CY 861.000 $75.000 $145.000 $122.090 $200.000
D-GR HMA TY-D SAC-B PG64-22
TON 581.000 $75.000 $90.000 $94.620 $147.000
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
TON 342.000 $75.000 $180.000 $185.180 $300.000
D-GR HMA TY B SAC-B PG (64-22)
TON 27,988.000 $67.000 $85.000 $89.740 $83.000
SUPERPAVE MIXTURES SP-D SAC-B PG70-22
TON 24,598.000 $67.000 $88.000 $97.680 $100.000
PLANE ASPH CONC PAV (2")
SY 123,406.000 $1.250 $1.900 $1.510 $1.350
CONC PVMT (CONT REINF - CRCP) (20")
SY 5,804.000 $140.000 $200.000 $128.000 $174.000
CONC PVMT(CRCP)(TRANSITION SLAB)
SY 1,202.000 $100.000 $210.000 $50.000 $166.000
CEM STABIL BKFL
CY 5,231.000 $90.000 $56.000 $58.000 $92.000
CUT & RESTORING PAV
SY 275.000 $160.000 $91.000 $100.000 $185.000
CUT & RESTORE CONC PAVING
SY 172.000 $175.000 $270.000 $40.000 $360.000
TRENCH EXCAVATION PROTECTION
LF 5,056.000 $1.500 $1.150 $2.000 $5.000
TEMPORARY SPL SHORING
SF 3,255.000 $15.000 $14.000 $25.000 $22.000
PRESTR CONC PIL (16 IN SQ)
LF 27,305.000 $60.000 $60.000 $50.000 $86.000
PRESTR CONC PIL (18 IN SQ)
LF 5,460.000 $90.000 $80.000 $63.000 $92.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000 $150.000 $150.000 $138.250 $120.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 166.000 $200.000 $530.000 $475.050 $270.000
DRILL SHAFT (SIGN MTS) (48 IN)
LF 54.000 $450.000 $570.000 $512.050 $485.000
DRILL SHAFT (SIGN MTS) (54 IN)
LF 66.000 $400.000 $820.000 $731.500 $610.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 650.000 $400.000 $820.000 $731.750 $755.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 152.000 $200.000 $200.000 $177.000 $190.000
DRILL SHAFT (120 IN)
LF 340.000 $1,400.000 $2,200.000 $2,125.000 $2,000.000
CL C CONC (ABUT)
CY 162.000 $700.000 $920.000 $1,170.000 $1,400.000
CL C CONC (CAP)
CY 1,007.300 $900.000 $920.000 $910.000 $1,200.000
CL C CONC (CAP)(MASS)
CY 432.400 $1,000.000 $950.000 $810.000 $1,200.000
CL C CONC (COLUMN)
CY 1,265.200 $900.000 $740.000 $735.000 $830.000
CL C CONC (COLUMN)(MASS)
CY 255.600 $1,000.000 $820.000 $755.000 $780.000
CL C CONC (FOOTING)
CY 1,074.200 $800.000 $590.000 $805.000 $700.000
CL C CONC (FOOTING)(MASS)
CY 126.700 $650.000 $610.000 $465.000 $630.000
REINF CONC SLAB
SF 276,744.000 $18.000 $17.500 $15.200 $17.900
RETAINING WALL (MSE)
SF 36,361.000 $30.000 $44.000 $52.000 $56.000
PRESTR CONC GIRDER (TX46)
LF 1,551.000 $125.000 $130.000 $120.000 $138.000
PRESTR CONC GIRDER (TX54)
LF 35,064.930 $130.000 $130.000 $113.000 $133.000
CONCRETE PAINT FINISH
SF 3,720.000 $0.500 $0.270 $1.100 $0.250
RIPRAP (CONC)(4 IN)
CY 264.000 $400.000 $550.000 $455.000 $435.000
RIPRAP (CONC)(5 IN)
CY 9.000 $350.000 $650.000 $470.000 $455.000
RIPRAP (CONC)(6 IN)
CY 284.000 $400.000 $575.000 $483.000 $475.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 276.000 $65.000 $110.000 $75.480 $155.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 94.000 $90.000 $120.000 $111.290 $176.000
RIPRAP (MOW STRIP)(4 IN)
CY 250.000 $500.000 $625.000 $516.350 $430.000
RAIL (TY SSTR)
LF 17,918.700 $60.000 $58.000 $37.000 $55.000
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 891.000 $100.000 $91.000 $117.000 $105.000
ARMOR JOINT (SEALED)
LF 97.000 $65.000 $100.000 $141.000 $830.000
CONC BOX CULV (5 FT X 3 FT)
LF 210.000 $235.000 $280.000 $282.000 $240.000
CONC BOX CULV (5 FT X 4 FT)
LF 1,230.000 $220.000 $250.000 $343.000 $250.000
CONC BOX CULV (7 FT X 3 FT)
LF 1,584.000 $365.000 $320.000 $300.000 $330.000
CONC BOX CULV (10 FT X 10 FT)
LF 451.000 $760.000 $770.000 $920.000 $800.000
RC PIPE (CL III)(18 IN)
LF 430.000 $60.000 $90.000 $44.000 $50.000
RC PIPE (CL III)(24 IN)
LF 2,878.000 $75.000 $69.000 $57.000 $60.000
RC PIPE (CL III)(30 IN)
LF 100.000 $120.000 $82.000 $83.000 $73.000
RC PIPE (CL III)(36 IN)
LF 157.000 $115.000 $120.000 $88.000 $73.000
MANH (COMPL)(PRM)(60IN)
EA 4.000 $5,425.000 $3,600.000 $3,850.000 $4,600.000
INLET (COMPL)(PCO)(3FT)(NONE)
EA 4.000 $3,700.000 $2,700.000 $3,350.000 $4,400.000
INLET (COMPL)(PCO)(4FT)(LEFT)
EA 2.000 $5,000.000 $3,300.000 $3,950.000 $4,900.000
INLET (COMPL)(PCO)(4FT)(BOTH)
EA 1.000 $5,000.000 $3,500.000 $6,060.000 $5,200.000
INLET (COMPL)(PSL)(RC)(3FTX3FT)
EA 1.000 $5,000.000 $2,400.000 $3,765.000 $4,100.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 25.000 $4,600.000 $3,100.000 $3,765.000 $4,750.000
INLET (COMPL)(PSL)(FG)(3FTX5FT-3FTX3FT)
EA 2.000 $6,500.000 $4,600.000 $3,765.000 $5,580.000
INLET(COMPL)(PSL)(SFG)(3FTX3FT-3FTX3FT)
EA 6.000 $2,650.000 $3,300.000 $3,765.000 $4,950.000
INLET (COMPL)(TY AZR)
EA 2.000 $5,000.000 $5,900.000 $4,265.000 $4,760.000
INLET (COMPL)(TY A)(SPL)
EA 2.000 $3,100.000 $8,300.000 $3,265.000 $5,050.000
JCT BOX (COMPL)(SPL)
EA 2.000 $15,000.000 $7,500.000 $4,765.000 $4,420.000
WINGWALL (FW - S) (HW=6 FT)
EA 1.000 $6,000.000 $14,700.000 $38,800.000 $16,400.000
WINGWALL (PW - 1) (HW=12 FT)
EA 2.000 $43,500.000 $69,400.000 $78,900.000 $71,300.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $12,000.000 $11,900.000 $15,550.000 $16,500.000
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $10,500.000 $13,200.000 $23,400.000 $16,100.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $680.000 $700.000 $790.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 3.000 $1,500.000 $760.000 $750.000 $790.000
GRATE & FRAME
EA 4.000 $1,000.000 $1,600.000 $2,440.000 $1,980.000
CAST-IN-PLACE TRENCH DRAIN
LF 200.000 $420.000 $280.000 $70.000 $390.000
ADJUSTING INLETS
EA 1.000 $1,300.000 $1,000.000 $420.000 $1,970.000
PIPE (PVC) (SCH 40) (8 IN)
LF 228.000 $50.000 $22.000 $26.000 $155.000
REMOV STR (INLET)
EA 19.000 $500.000 $500.000 $425.000 $96.000
REMOV STR (SET)
EA 3.000 $350.000 $400.000 $650.000 $560.000
REMOV STR (WINGWALL)
EA 1.000 $1,200.000 $2,100.000 $6,400.000 $2,300.000
REMOV STR (PIPE)
LF 908.000 $15.000 $16.000 $11.000 $18.000
REMOV STR (BOX CULVERT)
LF 796.000 $50.000 $20.950 $80.000 $96.000
MOBILIZATION
LS 1.000 $2,300,000.000 $3,254,101.000 $4,050,000.000 $5,330,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 32.000 $3,500.000 $14,500.000 $12,000.000 $19,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 192.000 $30.000 $30.000 $27.310 $28.000
ROCK FILTER DAMS (REMOVE)
LF 192.000 $10.000 $21.000 $9.590 $10.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 333.000 $25.000 $30.000 $30.280 $31.000
CONSTRUCTION EXITS (REMOVE)
SY 333.000 $8.000 $18.250 $9.630 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,370.000 $3.000 $2.500 $2.030 $2.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,370.000 $1.000 $1.050 $0.770 $0.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,815.000 $6.000 $5.400 $4.910 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,815.000 $2.000 $1.100 $0.540 $0.550
CONSTRUCTING DETOURS
SY 23,829.000 $48.000 $45.000 $48.350 $70.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 14,190.000 $10.000 $30.000 $15.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 1,680.000 $15.000 $7.000 $50.000 $85.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $40.000 $30.000 $58.000 $85.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 42,540.000 $15.000 $6.400 $3.200 $11.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 160.000 $5.000 $9.100 $10.000 $20.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 80.000 $10.000 $9.100 $30.000 $17.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 14,190.000 $10.000 $8.500 $3.000 $15.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 1,680.000 $10.000 $10.250 $4.500 $14.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $10.000 $10.500 $4.500 $17.000
PTB (FUR & INST)(STEEL)
LF 640.500 $200.000 $375.000 $520.000 $580.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 3,552.000 $60.000 $56.000 $72.730 $80.000
PERM CTB (SSCB)(TY 3)(MOD)
LF 182.000 $135.000 $160.000 $417.000 $310.000
PERM CTB (SGL SLOPE)(SPLIT)(MOD)
LF 2,554.000 $100.000 $59.000 $152.000 $110.000
CONC CURB (TY II)
LF 5,524.000 $18.000 $8.600 $10.000 $13.000
CONC CURB & GUTTER (TY II)
LF 726.000 $30.000 $25.000 $25.000 $25.000
DRIVEWAYS (ACP)
SY 1,851.000 $25.000 $69.000 $30.000 $38.000
CONC SIDEWALKS (6")
SY 350.000 $60.000 $83.000 $53.250 $55.000
CURB RAMPS (TY 1)
EA 4.000 $1,500.000 $1,900.000 $1,324.000 $1,360.000
CURB RAMPS (TY 2)
EA 6.000 $1,630.000 $1,900.000 $1,335.000 $1,370.000
CURB RAMPS (TY 22)
EA 2.000 $2,500.000 $2,900.000 $3,300.000 $5,400.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,000.000 $30.000 $26.000 $22.000 $24.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,800.000 $1,800.000 $1,700.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 10.000 $2,000.000 $1,100.000 $1,150.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 984.000 $10.000 $2.800 $2.100 $3.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,500.000 $3,000.000 $2,400.000 $2,750.000
CRASH CUSH ATTEN (INSTL)
EA 12.000 $18,850.000 $9,400.000 $8,225.000 $9,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 33.000 $900.000 $1,600.000 $920.000 $3,400.000
CRASH CUSH ATTEN (REMOVE)
EA 20.000 $700.000 $1,100.000 $521.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 10.000 $14,000.000 $16,400.000 $28,100.000 $15,600.000
PIPE UNDERDRAINS (TY 8) (6")
LF 5,245.000 $40.000 $30.000 $27.000 $36.000
REMOVE RD IL ASM (TRANS-BASE)
EA 32.000 $250.000 $360.000 $323.000 $240.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 3.000 $965.000 $1,500.000 $1,360.000 $1,850.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 19.000 $3,000.000 $3,300.000 $2,922.000 $2,800.000
IN RD IL (TY SP) 48S-8-8 (400W EQ) LED
EA 20.000 $5,000.000 $5,400.000 $4,801.000 $5,400.000
HI MST IL POLE (125 FT)(100 MPH)
EA 13.000 $30,000.000 $33,600.000 $30,133.000 $31,200.000
HI MST IL ASM (12-400W)ASYM(TY A)SHLD
EA 3.000 $30,000.000 $31,400.000 $28,160.000 $33,800.000
HI MST IL ASM (12-400W)ASYM(TY B)SHLD
EA 10.000 $30,000.000 $32,000.000 $28,680.000 $34,500.000
CONDT (PVC) (SCH 40) (2")
LF 9,111.000 $11.000 $13.250 $11.960 $10.000
CONDT (PVC) (SCH 40) (3")
LF 392.000 $15.000 $22.000 $19.670 $17.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 3,105.000 $22.000 $22.000 $19.570 $36.000
CONDT (RM) (1")
LF 115.000 $20.000 $40.000 $35.450 $37.000
ELEC CONDR (NO.12) BARE
LF 115.000 $1.000 $1.400 $1.250 $1.400
ELEC CONDR (NO.12) INSULATED
LF 230.000 $1.500 $1.400 $1.250 $1.300
ELEC CONDR (NO.8) BARE
LF 16,350.000 $1.500 $1.450 $1.320 $1.300
ELEC CONDR (NO.8) INSULATED
LF 32,920.000 $1.500 $1.600 $1.440 $12.000
GROUND BOX TY A (122311)W/APRON
EA 19.000 $1,000.000 $1,800.000 $1,580.000 $830.000
ELC SRV TY D 120/240 100(NS)SS(T)GC(O)
EA 6.000 $7,500.000 $9,000.000 $8,025.000 $6,000.000
ALUMINUM SIGNS (TY G)
SF 228.750 $22.000 $21.000 $22.000 $20.000
ALUMINUM SIGNS (TY O)
SF 2,184.750 $20.000 $26.000 $22.000 $18.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 8.000 $450.000 $700.000 $725.000 $640.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 24.000 $550.000 $820.000 $625.000 $750.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 5.000 $650.000 $820.000 $855.000 $750.000
IN SM RD SN SUP&AM TYS80(2)SB(P)
EA 4.000 $1,300.000 $1,900.000 $200.000 $1,770.000
RELOCATE SM RD SN SUP&AM TY S80
EA 8.000 $500.000 $640.000 $490.000 $580.000
REMOVE SM RD SN SUP&AM
EA 29.000 $60.000 $95.000 $55.000 $310.000
INSTALL LRSS (STRUCT STEEL)
LB 1,076.700 $4.000 $5.600 $5.050 $3.000
RELOCATE LRSA
EA 1.000 $2,000.000 $3,600.000 $3,180.000 $3,300.000
INS OH SN SUP(30 FT CANT)
EA 2.000 $20,000.000 $21,300.000 $19,100.000 $16,700.000
INS OH SN SUP(35 FT CANT)
EA 1.000 $22,225.000 $24,000.000 $21,510.000 $20,000.000
INS OH SN SUP(40 FT CANT)
EA 2.000 $22,800.000 $27,300.000 $24,480.000 $20,700.000
INS OH SN SUP(65 FT BRDG)
EA 1.000 $20,000.000 $32,400.000 $29,060.000 $37,000.000
INS OH SN SUP(75 FT BRDG)
EA 1.000 $34,500.000 $34,900.000 $31,260.000 $40,000.000
INS OH SN SUP(80 FT BRDG)
EA 2.000 $28,000.000 $37,700.000 $33,790.000 $42,000.000
REMOVE OVERHD SIGN SUP
EA 4.000 $8,500.000 $4,700.000 $4,200.000 $3,500.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 49.000 $85.000 $95.000 $70.000 $40.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 66.000 $18.000 $22.000 $11.000 $12.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 16.000 $25.000 $28.000 $18.000 $51.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 83.000 $20.000 $22.000 $11.000 $19.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 18.000 $16.000 $22.000 $11.000 $26.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 40.000 $65.000 $73.000 $85.000 $40.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 12,553.000 $0.150 $0.550 $0.500 $0.500
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 926.000 $0.250 $0.600 $0.550 $0.600
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 43,428.000 $0.150 $0.550 $0.500 $0.500
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 9,893.000 $0.350 $1.100 $1.000 $1.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 39,322.000 $0.200 $0.550 $0.500 $0.500
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 21,308.000 $0.550 $0.650 $0.600 $0.600
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,553.000 $0.550 $0.950 $0.850 $0.900
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 112,372.000 $0.550 $0.750 $0.650 $0.700
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 28,817.000 $1.000 $1.500 $1.350 $1.400
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 116,972.000 $0.550 $0.750 $0.650 $0.700
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 11,656.700 $0.750 $0.850 $0.750 $0.800
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 615.900 $2.000 $1.650 $1.500 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,198.600 $1.500 $2.800 $2.500 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 673.700 $6.000 $5.600 $5.000 $5.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 38.000 $110.000 $73.000 $65.000 $70.000
REFL PAV MRK TY I(W)(UTURN ARW)(100MIL)
EA 9.000 $175.000 $130.000 $115.000 $120.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 41.000 $135.000 $120.000 $110.000 $115.000
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
LF 464.800 $0.800 $0.850 $0.750 $0.800
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 225.600 $5.000 $5.600 $5.000 $5.000
PAVEMENT SEALER 4"
LF 129,293.500 $0.100 $0.140 $0.120 $0.130
PAVEMENT SEALER 8"
LF 12,714.300 $0.300 $0.210 $0.190 $0.200
PAVEMENT SEALER 12"
LF 2,198.600 $1.000 $0.290 $0.260 $0.300
PAVEMENT SEALER 24"
LF 899.300 $2.500 $0.500 $0.470 $0.500
PAVEMENT SEALER (ARROW)
EA 47.000 $40.000 $3.400 $3.000 $3.000
PAVEMENT SEALER (WORD)
EA 41.000 $50.000 $3.400 $3.000 $3.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 15,126.000 $0.400 $0.400 $0.360 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 57,945.500 $0.300 $0.390 $0.350 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 56,222.000 $0.300 $0.390 $0.350 $0.400
REFL PAV MRKR TY II-A-A
EA 118.000 $2.500 $4.200 $3.750 $4.000
REFL PAV MRKR TY II-C-R
EA 1,471.000 $3.000 $3.900 $3.500 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 76,109.000 $1.000 $1.100 $0.350 $0.500
ELIM EXT PAV MRK & MRKS (8")
LF 9,188.000 $0.500 $1.250 $2.300 $1.000
PAV SURF PREP FOR MRK (4")
LF 129,293.500 $0.100 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 12,714.300 $0.100 $0.050 $0.040 $0.040
PAV SURF PREP FOR MRK (12")
LF 2,198.600 $0.400 $0.060 $0.060 $0.060
PAV SURF PREP FOR MRK (24")
LF 899.300 $1.000 $0.140 $0.120 $0.140
PAV SURF PREP FOR MRK (ARROW)
EA 47.000 $15.000 $0.220 $0.200 $0.250
PAV SURF PREP FOR MRK (WORD)
EA 41.000 $20.000 $0.220 $0.200 $0.250
POST AND CABLE FENCE (REMOVAL)
LF 4,607.000 $4.000 $4.500 $4.500 $2.000
POST AND CABLE FENCE (REMV CONC ANCHOR)
EA 3.000 $1,200.000 $1,400.000 $350.000 $3,100.000
GEOGRID BASE REINFORCEMENT (TY I)
SY 110,249.000 $2.000 $1.200 $0.880 $1.300
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,000.000 $21,100.000 $10,000.000 $32,000.000
TMA (STATIONARY)
DAY 88.000 $10.000 $220.000 $196.000 $230.000
TMA (MOBILE OPERATION)
HR 152.000 $50.000 $54.000 $70.000 $25.000
Totals: $39,815,128.325 $43,149,145.765 $43,180,347.918 $51,853,356.615