Job Info for 6346-18-001

County: SAN JACINTO Highway: US0059 Date: 11/06/2019 (5 years ago) Engineer's Estimate: $1,654,709 Control Number: 6346-18-001
Project: RMC - 634618001 District: LUFKIN Time: 60 W Type: EROSION REPAIR

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $1,654,708.80
EARTH BUILDERS, L.P.   $1,582,884.50 1
-4.34% | -$71,824.30
FIREMAN EXCAVATING, INC.   $1,765,671.59 2
6.71% | $110,962.79
11.55% | $182,787.09
TRIPLE B SERVICES LLP   $1,869,200.00 3
12.96% | $214,491.20
18.09% | $286,315.50
5.86% | $103,528.41
ALTUS CONSTRUCTION LLC   $1,955,986.20 4
18.21% | $301,277.40
23.57% | $373,101.70
4.64% | $86,786.20
EAST TEXAS BRIDGE, INC.   $2,097,892.50 5
26.78% | $443,183.70
32.54% | $515,008.00
7.25% | $141,906.30
FNH CONSTRUCTION, LLC   $2,178,840.00 6
31.68% | $524,131.20
37.65% | $595,955.50
3.86% | $80,947.50

Bid Items

Items: 29, 0 filtered
SAN JACINTO US0059  |  LUFKIN  |  6346-18-001  |  11/06/2019  |  $1,654,709  |  RMC - 634618001  |  EROSION REPAIR  |  60 W
Item code Description Unit Quantity Engineer's Estimate EARTH BUILDERS, L.P. FIREMAN EXCAVATING, INC. TRIPLE B SERVICES LLP ALTUS CONSTRUCTION LLC EAST TEXAS BRIDGE, INC. FNH CONSTRUCTION, LLC
105 6011 REMOVING STAB BASE AND ASPH PAV (2"-6") SY 619.000 $15.000 $25.000 $75.250 $14.000 $95.070 $30.000 $20.000
110 6003 EXCAVATION (SPECIAL) CY 5,583.000 $30.000 $25.000 $33.200 $19.500 $38.790 $35.000 $50.000
132 6002 EMBANKMENT (FINAL)(DENS CONT)(TY A) CY 2,272.000 $50.000 $45.000 $45.790 $55.000 $42.080 $50.000 $50.000
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 80.000 $250.000 $100.000 $229.750 $200.000 $526.940 $200.000 $200.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 1,341.000 $6.000 $4.000 $25.000 $2.000 $11.350 $10.000 $10.000
164 6001 BROADCAST SEED (PERM) (RURAL) (SANDY) SY 1,341.000 $2.000 $1.500 $0.790 $1.000 $1.140 $3.000 $5.000
168 6001 VEGETATIVE WATERING MG 26.800 $50.000 $150.000 $120.250 $10.000 $28.770 $40.000 $100.000
169 6003 SOIL RETENTION BLANKETS (CL 1) (TY C) SY 1,223.000 $5.000 $3.000 $55.500 $1.500 $4.680 $10.000 $10.000
247 6041 FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS) CY 163.000 $40.000 $120.000 $160.000 $105.000 $228.490 $200.000 $80.000
310 6009 PRIME COAT (MC-30) GAL 220.000 $15.000 $20.000 $45.000 $9.500 $32.940 $30.000 $10.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 220.000 $15.000 $25.000 $47.220 $25.000 $10.620 $50.000 $10.000
316 6401 AGGR (TY PE OR PL GR 4) CY 7.000 $200.000 $1,000.000 $450.000 $485.000 $360.570 $1,000.000 $1,000.000
340 6106 D-GR HMA(SQ) TY-D PG64-22 TON 61.000 $150.000 $350.000 $242.190 $355.000 $647.860 $500.000 $140.000
407 6001 SHEET PILING (PZ - 27) SF 3,400.000 $75.000 $65.000 $52.010 $186.000 $96.120 $135.000 $150.000
432 6035 RIPRAP (STONE PROTECTION)(24 IN) CY 3,156.000 $250.000 $240.000 $240.000 $210.000 $236.800 $225.000 $250.000
459 6007 GABION MATTRESSES (GALV)(12 IN) SY 15.000 $100.000 $180.000 $173.720 $56.000 $128.540 $300.000 $300.000
459 6009 GABIONS (3' X 3')(GALV) CY 25.000 $200.000 $370.000 $286.840 $274.000 $343.400 $450.000 $500.000
459 6011 GABIONS (5'X 3')(GALV) CY 185.000 $350.000 $370.000 $632.010 $400.000 $561.520 $450.000 $500.000
500 6001 MOBILIZATION LS 1.000 $150,200.800 $150,000.000 $120,000.000 $150,000.000 $179,808.180 $200,000.000 $200,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 5.000 $3,000.000 $2,000.000 $3,760.620 $1,100.000 $7,443.710 $25,000.000 $8,500.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 112.000 $30.000 $50.000 $28.290 $40.000 $40.690 $50.000 $30.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 112.000 $10.000 $10.000 $9.590 $5.000 $13.790 $15.000 $15.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 240.000 $10.000 $8.000 $45.500 $3.000 $4.330 $5.000 $4.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 240.000 $5.000 $1.000 $20.500 $1.000 $1.900 $1.000 $2.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 225.000 $25.000 $30.000 $25.850 $28.000 $33.670 $25.000 $25.000
540 6014 SHORT RADIUS LF 62.500 $40.000 $50.000 $103.000 $36.000 $73.980 $85.000 $50.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 1.000 $1,200.000 $1,500.000 $1,570.270 $1,500.000 $2,258.780 $1,500.000 $1,850.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 325.000 $5.000 $5.000 $20.250 $5.000 $4.550 $5.000 $5.000
752 6009 TREE REMOVAL (30" - 36" DIA) EA 4.000 $750.000 $1,000.000 $270.550 $1,200.000 $398.560 $5,000.000 $5,000.000
Totals: $1,654,708.80 $1,582,884.50 $1,765,671.59 $1,869,200.00 $1,955,986.21 $2,097,892.50 $2,178,840.00