SAN JACINTO SH 150 (0395-02-041)

Items: 97

County: SAN JACINTO
Length: N/A
Highway: SH 150
District: LUFKIN
Control Number: 0395-02-041
DBE Goal: N/A
Project: STP 1802(307)
Guaranty: N/A
Time: 265 WORKING DAYS
Engineer's Estimate: $11,869,732.65
Date: 10/03/2018 (7 years ago)
Contract Number: N/A
Type: RECONST PVMT & ADD PASSING LANES, ETC.
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$11,869,732.65
$11,494,473.51
Over/Under Est: -3.16% -$375,259.14
Over/Under Est: 0.85% $101,053.88
Amt Left: 4.14% $476,313.02
$12,264,159.50
Over/Under Est: 3.32% $394,426.85
Amt Left: 6.7% $769,685.99
Delta: -2.45% -$293,372.97
Over/Under Est: 10.66% $1,265,076.23
Amt Left: 14.27% $1,640,335.37
Delta: -7.10% -$870,649.38
$13,363,000.60
Over/Under Est: 12.58% $1,493,267.95
Amt Left: 16.26% $1,868,527.09
Delta: -1.74% -$228,191.72
Over/Under Est: 25.69% $3,048,850.31
Amt Left: 29.79% $3,424,109.45
Delta: -11.64% -$1,555,582.36
$16,614,999.99
Over/Under Est: 39.98% $4,745,267.34
Amt Left: 44.55% $5,120,526.48
Delta: -11.37% -$1,696,417.03

Bid Items & Bid Tabulations

97 Total 0 of 97
SAN JACINTO  |  SH 150  |  LUFKIN  |  0395-02-041  |  10/03/2018  |  $11,869,732.65  |  STP 1802(307)  |  RECON PVMT & ADD PASSING LANES, ETC.  |  265 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANGEL BROTHERS HOLDINGS CORP.
KNIFE RIVER CORPORATION - SOUTH
A. L. HELMCAMP, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
SMITH & COMPANY
HERITAGE ASPHALT COMPANY LLC
BRIDGES AND ROADS, LLC
PREPARING ROW
STA 386.250 $800.000 $490.000 $240.000 $632.000 $460.000 $667.000 $2,500.000 $3,698.100
REMOVING CONC (RIPRAP)
SY 6.000 $20.000 $24.000 $88.000 $90.000 $115.000 $100.000 $180.000 $258.560
EXCAVATION (ROADWAY)
CY 1,508.000 $8.000 $15.000 $25.000 $10.000 $10.000 $7.420 $10.000 $9.420
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 56,965.000 $10.000 $9.800 $19.550 $13.000 $14.000 $20.750 $14.000 $9.050
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 181.000 $10.000 $15.000 $20.000 $35.000 $32.000 $125.000 $35.000 $8.320
BLADING
STA 387.760 $75.000 $94.000 $100.000 $250.000 $170.000 $555.000 $200.000 $235.620
BLOCK SODDING
SY 2,946.000 $5.000 $3.500 $4.680 $3.500 $5.500 $3.250 $3.000 $5.540
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 233,317.000 $0.250 $0.330 $0.280 $0.330 $0.280 $0.310 $0.250 $0.330
CELL FBR MLCH SEED(TEMP)(WARM)
SY 116,660.000 $0.250 $0.310 $0.240 $0.330 $0.270 $0.310 $0.250 $0.290
CELL FBR MLCH SEED(TEMP)(COOL)
SY 116,660.000 $0.250 $0.310 $0.240 $0.330 $0.250 $0.310 $0.250 $0.290
VEGETATIVE WATERING
MG 2,334.000 $0.150 $18.000 $24.000 $15.000 $5.000 $10.000 $19.000 $43.910
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 21,262.000 $2.000 $1.250 $1.280 $1.300 $0.950 $1.200 $2.000 $1.510
SPRINKLING (DUST CONTROL)
MG 1,158.000 $10.000 $18.000 $13.000 $1.000 $0.010 $10.000 $40.000 $46.240
FL BS (RDWY DEL) (TY A GR 1-2)
TON 90,535.000 $35.000 $36.500 $34.600 $36.000 $37.000 $35.500 $38.000 $50.390
CEMENT
TON 4,405.000 $140.000 $128.500 $130.000 $136.000 $134.000 $126.000 $140.000 $157.690
CEM TRT(MX EXST MTL & NEW BS)(14")
SY 207,115.000 $3.250 $2.600 $2.960 $3.800 $3.650 $6.320 $3.500 $5.270
ASPH (RC-250)
GAL 51,777.000 $4.000 $4.300 $4.340 $3.300 $4.500 $3.420 $4.300 $4.450
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 182,265.000 $3.500 $3.100 $3.000 $3.300 $4.000 $3.020 $4.200 $3.600
AGGR (TY-PE, E, L OR PL GR 3)
CY 2,297.000 $110.000 $105.000 $128.000 $100.000 $140.000 $110.000 $125.000 $194.010
AGGR (TY E OR L, PE OR PL GR 4)
CY 1,883.000 $110.000 $105.000 $137.000 $110.000 $145.000 $112.000 $132.000 $210.840
AGGR (TY E OR L GR 5)
CY 1,593.000 $120.000 $158.000 $131.000 $120.000 $150.000 $94.000 $119.000 $182.980
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
SY 3,026.000 $35.000 $52.000 $38.400 $33.000 $42.000 $49.000 $30.000 $46.020
SUPERPAVE MIXTURES SP-C SAC-A PG70-22
TON 22,605.000 $85.000 $94.000 $86.640 $94.000 $100.000 $103.000 $115.000 $89.760
CEM STABIL BKFL
CY 95.000 $85.000 $134.000 $133.000 $130.000 $245.000 $100.000 $160.000 $84.340
CUT & RESTORING PAV
SY 170.000 $105.000 $160.000 $160.000 $160.000 $120.000 $125.000 $140.000 $119.600
RIPRAP (CONC)(5 IN)
CY 735.000 $500.000 $430.000 $425.000 $430.000 $435.000 $400.000 $400.000 $477.920
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 508.000 $180.000 $145.000 $212.000 $220.000 $170.000 $180.000 $260.000 $163.090
RETROFIT RAIL (TY T631)
LF 83.000 $95.000 $310.000 $360.000 $90.000 $150.000 $450.000 $88.000 $123.980
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 36.000 $200.000 $428.000 $425.000 $450.000 $550.000 $385.000 $315.000 $460.190
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 21.000 $300.000 $455.000 $450.000 $470.000 $575.000 $410.000 $380.000 $638.980
RC PIPE (CL III)(18 IN)
LF 734.000 $45.000 $51.000 $51.000 $50.000 $47.000 $40.000 $70.000 $52.400
RC PIPE (CL III)(24 IN)
LF 80.000 $85.000 $107.000 $106.000 $110.000 $70.000 $100.000 $90.000 $76.190
RC PIPE (CL III)(30 IN)
LF 4.000 $120.000 $267.000 $266.000 $260.000 $286.000 $250.000 $200.000 $102.000
WINGWALL (PW - 2) (HW=4 FT)
EA 1.000 $6,500.000 $9,100.000 $9,000.000 $9,000.000 $8,000.000 $8,000.000 $2,000.000 $8,432.920
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000 $14,000.000 $23,500.000 $23,500.000 $24,000.000 $12,000.000 $20,000.000 $3,620.000 $15,675.720
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 1.000 $4,000.000 $4,300.000 $4,255.000 $4,500.000 $6,300.000 $4,000.000 $3,000.000 $6,182.270
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
EA 1.000 $5,000.000 $3,210.000 $3,200.000 $3,200.000 $5,500.000 $3,000.000 $3,000.000 $7,495.110
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 36.000 $550.000 $750.000 $744.000 $740.000 $630.000 $700.000 $750.000 $738.860
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 2.000 $850.000 $910.000 $905.000 $900.000 $975.000 $850.000 $1,000.000 $1,217.880
REMOV & RE - LAY PIPE (18 IN)
LF 1,888.000 $55.000 $32.000 $32.000 $32.000 $30.000 $28.000 $52.000 $64.230
REMOV & RE - LAY PIPE (24 IN)
LF 294.000 $60.000 $43.000 $43.000 $45.000 $37.500 $38.000 $60.000 $85.830
REMOV & RE - LAY PIPE (30 IN)
LF 26.000 $80.000 $54.000 $53.000 $55.000 $53.000 $50.000 $200.000 $65.960
REMOV STR (PIPE)
EA 3.000 $500.000 $700.000 $690.000 $700.000 $450.000 $500.000 $4,000.000 $377.080
MOBILIZATION
LS 1.000 $880,000.000 $605,000.000 $737,000.000 $800,000.000 $1,000,000.000 $750,000.000 $1,299,396.210 $1,605,511.750
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 32.000 $2,500.000 $1,370.000 $1,245.000 $5,000.000 $3,000.000 $4,000.000 $8,000.000 $4,006.800
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,575.000 $30.000 $27.000 $30.850 $36.000 $32.500 $25.000 $26.000 $36.540
ROCK FILTER DAMS (REMOVE)
LF 3,575.000 $10.000 $9.650 $6.380 $5.000 $6.600 $9.000 $7.500 $7.560
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $25.000 $18.200 $21.280 $15.000 $35.000 $17.000 $19.000 $25.200
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $8.600 $10.640 $2.000 $6.600 $8.000 $8.000 $12.600
TEMP SEDMT CONT FENCE (INSTALL)
LF 19,807.000 $3.000 $2.100 $2.610 $2.500 $2.450 $2.000 $4.000 $3.090
TEMP SEDMT CONT FENCE (REMOVE)
LF 19,807.000 $1.000 $0.700 $0.530 $0.500 $0.820 $0.750 $1.000 $0.630
DRIVEWAYS (ACP)
SY 8,015.000 $45.000 $21.650 $33.400 $26.000 $30.000 $30.000 $58.000 $33.570
TURNOUTS (ACP)
SY 23.000 $75.000 $35.000 $57.000 $150.000 $115.000 $185.000 $160.000 $46.200
RUMBLE STRIPS (SHOULDER)
LF 77,050.000 $0.250 $0.200 $0.120 $0.200 $0.220 $0.140 $0.150 $0.180
RUMBLE STRIPS (CENTERLINE)
LF 38,525.000 $0.250 $0.200 $0.130 $0.200 $0.220 $0.200 $0.150 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 4,925.000 $20.000 $19.800 $19.680 $21.000 $26.850 $18.500 $22.900 $24.570
MTL BEAM GD FEN TRANS (T101)
EA 16.000 $25.000 $1,200.000 $1,186.000 $1,300.000 $1,377.000 $1,115.000 $1,275.000 $1,008.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 200.000 $25.000 $20.000 $20.000 $30.000 $32.300 $19.000 $25.000 $25.830
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 50.000 $75.000 $69.000 $69.000 $70.000 $72.500 $65.000 $90.000 $69.300
REMOVE METAL BEAM GUARD FENCE
LF 1,025.000 $2.000 $2.150 $2.000 $3.000 $2.750 $2.000 $4.000 $2.210
RM MTL BM GD FEN TRANS (T101)
EA 16.000 $175.000 $160.000 $160.000 $260.000 $275.000 $150.000 $275.000 $189.000
GUARDRAIL END TREATMENT (INSTALL)
EA 26.000 $2,200.000 $2,700.000 $2,691.000 $2,500.000 $2,585.000 $2,530.000 $2,140.000 $3,087.000
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $350.000 $270.000 $266.000 $300.000 $275.000 $250.000 $250.000 $252.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 12.000 $380.000 $500.000 $415.000 $320.000 $325.000 $325.000 $200.000 $430.090
MAILBOX INSTALL-S (WC-POST) TY 3
EA 55.000 $175.000 $215.000 $160.000 $120.000 $180.000 $115.000 $200.000 $210.320
MAILBOX INSTALL-D (WC-POST) TY 3
EA 2.000 $180.000 $270.000 $218.000 $160.000 $205.000 $150.000 $200.000 $258.140
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 10.000 $530.000 $545.000 $520.000 $500.000 $620.000 $470.000 $300.000 $658.950
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 10.000 $600.000 $660.000 $640.000 $620.000 $720.000 $585.000 $300.000 $718.880
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $700.000 $860.000 $827.000 $800.000 $900.000 $760.000 $300.000 $878.900
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 2.000 $850.000 $930.000 $900.000 $850.000 $975.000 $795.000 $300.000 $1,064.520
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 64.000 $300.000 $270.000 $262.000 $300.000 $300.000 $280.000 $200.000 $416.950
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 11.000 $350.000 $320.000 $300.000 $330.000 $335.000 $310.000 $200.000 $496.790
REMOVE SM RD SN SUP&AM
EA 87.000 $75.000 $64.000 $53.000 $55.000 $80.000 $50.000 $100.000 $88.070
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 33.000 $20.000 $20.000 $17.000 $25.000 $16.500 $20.000 $28.000 $22.680
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 75.000 $45.000 $36.000 $31.000 $25.000 $30.000 $22.000 $45.000 $27.720
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
EA 41.000 $80.000 $171.000 $150.000 $80.000 $100.000 $75.000 $95.000 $81.900
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 188,342.000 $0.150 $0.140 $0.140 $0.110 $0.110 $0.170 $0.360 $0.160
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 240.000 $5.000 $6.400 $6.380 $3.200 $3.300 $2.500 $5.500 $7.560
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 163,622.000 $0.150 $0.140 $0.140 $0.110 $0.110 $0.170 $0.360 $0.160
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 94,171.000 $0.150 $0.250 $0.530 $0.500 $1.450 $0.900 $0.360 $0.630
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 81,811.000 $0.550 $0.250 $0.530 $0.500 $1.400 $0.900 $0.360 $0.630
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 11,344.000 $1.000 $0.800 $1.000 $0.500 $1.200 $1.000 $0.360 $1.250
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,182.000 $1.000 $0.800 $1.000 $0.500 $1.200 $1.000 $0.360 $0.780
REFL PAV MRK TY I (W)4"(DOT)(090MIL)
LF 575.000 $1.000 $0.400 $0.400 $1.100 $1.100 $0.900 $0.360 $0.480
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 2,117.000 $1.000 $0.750 $0.740 $0.750 $0.780 $0.900 $0.360 $0.880
RE PM W/RET REQ TY I (W)4"(BRK)(090MIL)
LF 4,150.000 $0.300 $0.400 $0.400 $0.500 $0.480 $0.380 $0.360 $0.480
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 79,200.000 $0.300 $0.400 $0.400 $0.400 $0.420 $0.380 $0.360 $0.480
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 81,830.000 $0.300 $0.400 $0.400 $0.400 $0.420 $0.380 $0.360 $0.480
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 48.000 $30.000 $9.600 $9.570 $16.000 $16.500 $11.000 $0.360 $11.340
PREFAB PAV MRK TY C (W) (ARROW)
EA 12.000 $200.000 $280.000 $276.000 $200.000 $190.000 $155.000 $0.360 $327.600
PREFAB PAV MRK TY C (W) (WORD)
EA 8.000 $250.000 $310.000 $309.000 $240.000 $250.000 $205.000 $0.360 $365.400
REFL PAV MRKR TY I-C
EA 507.000 $3.000 $4.300 $4.260 $3.600 $3.650 $3.500 $3.450 $5.040
REFL PAV MRKR TY II-A-A
EA 1,026.000 $3.000 $4.800 $4.790 $3.600 $3.650 $3.250 $3.450 $5.670
TRAFFIC BUTTON TY W
EA 18.000 $20.000 $3.750 $3.720 $16.000 $16.500 $10.000 $0.360 $4.410
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $12,000.000 $1,000.000 $7,500.000 $18,000.000 $2,500.000 $15,000.000 $2,268.000
TMA (STATIONARY)
EA 1.000 $3,000.000 $12,000.000 $1,000.000 $21,000.000 $18,000.000 $2,000.000 $12,500.000 $6,930.000
TMA (MOBILE OPERATION)
DAY 56.000 $50.000 $500.000 $320.000 $300.000 $27.500 $200.000 $800.000 $224.710
Totals: $11,869,732.650 $11,494,473.510 $11,970,786.530 $12,264,159.500 $13,134,808.880 $13,363,000.600 $14,918,582.960 $16,614,999.996