SAN AUGUSTINE US 96 (0809-04-057)

Items: 66

County: SAN AUGUSTINE
Length: N/A
Highway: US 96
District: LUFKIN
Control Number: 0809-04-057
DBE Goal: N/A
Project: F 2022(193)
Guaranty: N/A
Time: 102 WORKING DAYS
Engineer's Estimate: $4,257,368.73
Date: 12/02/2021 (4 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (2)
E
Engineer's Estimate
$4,257,368.73
Over/Under Est: -11.48% -$488,805.64
Over/Under Est: 3.98% $169,580.42
Amt Left: 17.47% $658,386.06

Bid Items & Bid Tabulations

66 Total 0 of 66
SAN AUGUSTINE  |  US 96  |  LUFKIN  |  0809-04-057  |  12/02/2021  |  $4,257,368.73  |  F 2022(193)  |  REHAB EXIST ROADWAY  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MOORE BROTHERS CONSTRUCTION COMPANY
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 185.000 $1,800.000 $424.000 $403.200
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 16.000 $15.810 $31.000 $576.740
BACKFILL (TY B)
STA 184.600 $185.000 $138.140 $315.640
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 33.000 $137.000 $54.000 $152.250
BLOCK SODDING
SY 1,010.000 $4.870 $5.500 $5.250
BROADCAST SEED (TEMP) (WARM)
SY 12,309.000 $0.180 $0.130 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 12,309.000 $0.180 $0.050 $0.130
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 24,619.000 $0.320 $0.360 $0.380
VEGETATIVE WATERING
MG 1,000.500 $15.500 $5.000 $32.880
AGGR (TY E OR L, PE OR PL GR 4)
CY 722.000 $300.000 $118.000 $113.400
ASPH (AC-15P OR CRS-2P)
TON 168.000 $706.630 $890.000 $850.500
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
SY 1,500.000 $90.000 $93.060 $105.260
PLANE ASPH CONC PAV (5")
SY 54,626.000 $3.250 $2.690 $3.730
CEM STABIL BKFL
CY 20.000 $123.250 $200.000 $157.500
CUT & RESTORE ASPH PAVING
SY 37.000 $120.000 $110.000 $210.000
CUT AND RESTORE PAV (FLEX BASE)
SY 150.000 $54.000 $60.000 $68.250
TRENCH EXCAVATION PROTECTION
LF 13.000 $30.000 $4.500 $12.600
TEMPORARY SPL SHORING
SF 112.000 $50.000 $41.000 $105.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 24.000 $210.000 $235.000 $236.250
RC PIPE (CL III)(18 IN)
LF 422.000 $60.000 $57.000 $60.900
RC PIPE (CL III)(24 IN)
LF 120.000 $52.000 $73.000 $131.250
RC PIPE (CL III)(48 IN)
LF 24.000 $199.000 $402.000 $315.000
HEADWALL (CH - FW - 30) (DIA= 48 IN)
EA 1.000 $10,000.000 $11,000.000 $13,125.000
HEADWALL (CH - FW - 45) (DIA= 48 IN)
EA 2.000 $10,000.000 $11,500.000 $13,125.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 32.000 $655.000 $750.000 $892.500
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 8.000 $2,580.000 $1,250.000 $1,050.000
SET (REMOV & REINSTALL)
EA 2.000 $250.000 $390.000 $577.500
REMOV STR (PIPE)
EA 5.000 $445.000 $193.000 $1,050.000
MOBILIZATION
LS 1.000 $370,000.000 $185,000.000 $181,367.760
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 19.000 $2,500.000 $1,565.000 $4,311.640
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $34.060 $38.000 $36.230
ROCK FILTER DAMS (REMOVE)
LF 500.000 $6.420 $10.000 $9.450
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 266.000 $15.550 $19.000 $36.750
CONSTRUCTION EXITS (REMOVE)
SY 266.000 $6.400 $9.800 $9.450
TEMP SEDMT CONT FENCE (INSTALL)
LF 7,905.000 $2.730 $3.150 $3.390
TEMP SEDMT CONT FENCE (REMOVE)
LF 7,905.000 $0.750 $0.820 $1.180
DRIVEWAYS (ACP)
SY 1,261.000 $42.000 $20.460 $78.160
RUMBLE STRIPS (SHOULDER)
LF 36,928.000 $0.300 $0.220 $0.180
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 21,454.000 $0.250 $0.220 $0.190
MAILBOX INSTALL-S (WC-POST) TY 3
EA 5.000 $178.000 $248.000 $236.250
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $215.220 $247.000 $236.250
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $668.000 $886.000 $846.300
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $713.250 $1,295.000 $1,233.750
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 20.000 $338.000 $425.000 $404.250
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $450.000 $540.000 $514.500
REMOVE SM RD SN SUP&AM
EA 23.000 $96.120 $88.000 $84.000
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
EA 30.000 $71.350 $87.000 $84.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 684.000 $0.350 $0.330 $0.530
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 2,502.000 $0.300 $0.330 $0.530
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 11,520.000 $0.210 $0.330 $0.530
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 342.000 $1.150 $1.050 $2.630
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 1,251.000 $2.200 $1.050 $1.310
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 5,765.000 $1.100 $1.050 $1.310
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 228.000 $1.500 $1.250 $3.170
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 2,124.000 $2.850 $1.250 $3.170
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
LF 750.000 $0.300 $0.500 $0.420
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
LF 2,810.000 $0.320 $0.500 $0.440
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
LF 25,583.000 $0.310 $0.500 $0.420
REFL PAV MRKR TY I-C
EA 38.000 $2.950 $5.250 $5.250
REFL PAV MRKR TY II-A-A
EA 466.000 $2.850 $5.150 $5.250
SP MIXES SP-B PG64-22
TON 15,022.000 $92.000 $98.910 $109.800
SP MIXES SP-C SAC-A PG76-22
TON 10,325.000 $101.000 $106.260 $123.280
TACK COAT
GAL 4,456.000 $3.500 $3.500 $1.860
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,202.390 $6,000.000 $1,575.000
TMA (STATIONARY)
DAY 78.000 $188.000 $30.000 $393.750
TMA (MOBILE OPERATION)
DAY 18.000 $240.190 $30.000 $393.750
Totals: $4,257,368.730 $3,768,563.094 $4,426,949.154