PREPARING ROW
|
STA
|
185.000
|
$1,800.000
|
$424.000
|
$403.200
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
16.000
|
$15.810
|
$31.000
|
$576.740
|
|
|
BACKFILL (TY B)
|
STA
|
184.600
|
$185.000
|
$138.140
|
$315.640
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
33.000
|
$137.000
|
$54.000
|
$152.250
|
|
|
BLOCK SODDING
|
SY
|
1,010.000
|
$4.870
|
$5.500
|
$5.250
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
12,309.000
|
$0.180
|
$0.130
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
12,309.000
|
$0.180
|
$0.050
|
$0.130
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
24,619.000
|
$0.320
|
$0.360
|
$0.380
|
|
|
VEGETATIVE WATERING
|
MG
|
1,000.500
|
$15.500
|
$5.000
|
$32.880
|
|
|
AGGR (TY E OR L, PE OR PL GR 4)
|
CY
|
722.000
|
$300.000
|
$118.000
|
$113.400
|
|
|
ASPH (AC-15P OR CRS-2P)
|
TON
|
168.000
|
$706.630
|
$890.000
|
$850.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(12")
|
SY
|
1,500.000
|
$90.000
|
$93.060
|
$105.260
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
54,626.000
|
$3.250
|
$2.690
|
$3.730
|
|
|
CEM STABIL BKFL
|
CY
|
20.000
|
$123.250
|
$200.000
|
$157.500
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
37.000
|
$120.000
|
$110.000
|
$210.000
|
|
|
CUT AND RESTORE PAV (FLEX BASE)
|
SY
|
150.000
|
$54.000
|
$60.000
|
$68.250
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
13.000
|
$30.000
|
$4.500
|
$12.600
|
|
|
TEMPORARY SPL SHORING
|
SF
|
112.000
|
$50.000
|
$41.000
|
$105.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
24.000
|
$210.000
|
$235.000
|
$236.250
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
422.000
|
$60.000
|
$57.000
|
$60.900
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
120.000
|
$52.000
|
$73.000
|
$131.250
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
24.000
|
$199.000
|
$402.000
|
$315.000
|
|
|
HEADWALL (CH - FW - 30) (DIA= 48 IN)
|
EA
|
1.000
|
$10,000.000
|
$11,000.000
|
$13,125.000
|
|
|
HEADWALL (CH - FW - 45) (DIA= 48 IN)
|
EA
|
2.000
|
$10,000.000
|
$11,500.000
|
$13,125.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
32.000
|
$655.000
|
$750.000
|
$892.500
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,580.000
|
$1,250.000
|
$1,050.000
|
|
|
SET (REMOV & REINSTALL)
|
EA
|
2.000
|
$250.000
|
$390.000
|
$577.500
|
|
|
REMOV STR (PIPE)
|
EA
|
5.000
|
$445.000
|
$193.000
|
$1,050.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$370,000.000
|
$185,000.000
|
$181,367.760
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$2,500.000
|
$1,565.000
|
$4,311.640
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
500.000
|
$34.060
|
$38.000
|
$36.230
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
500.000
|
$6.420
|
$10.000
|
$9.450
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
266.000
|
$15.550
|
$19.000
|
$36.750
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
266.000
|
$6.400
|
$9.800
|
$9.450
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
7,905.000
|
$2.730
|
$3.150
|
$3.390
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
7,905.000
|
$0.750
|
$0.820
|
$1.180
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,261.000
|
$42.000
|
$20.460
|
$78.160
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
36,928.000
|
$0.300
|
$0.220
|
$0.180
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
21,454.000
|
$0.250
|
$0.220
|
$0.190
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
5.000
|
$178.000
|
$248.000
|
$236.250
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
1.000
|
$215.220
|
$247.000
|
$236.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$668.000
|
$886.000
|
$846.300
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$713.250
|
$1,295.000
|
$1,233.750
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
20.000
|
$338.000
|
$425.000
|
$404.250
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$450.000
|
$540.000
|
$514.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$96.120
|
$88.000
|
$84.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
30.000
|
$71.350
|
$87.000
|
$84.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
684.000
|
$0.350
|
$0.330
|
$0.530
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,502.000
|
$0.300
|
$0.330
|
$0.530
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
11,520.000
|
$0.210
|
$0.330
|
$0.530
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
342.000
|
$1.150
|
$1.050
|
$2.630
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
1,251.000
|
$2.200
|
$1.050
|
$1.310
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
5,765.000
|
$1.100
|
$1.050
|
$1.310
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
228.000
|
$1.500
|
$1.250
|
$3.170
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,124.000
|
$2.850
|
$1.250
|
$3.170
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
750.000
|
$0.300
|
$0.500
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL)
|
LF
|
2,810.000
|
$0.320
|
$0.500
|
$0.440
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
25,583.000
|
$0.310
|
$0.500
|
$0.420
|
|
REFL PAV MRKR TY I-C
|
EA
|
38.000
|
$2.950
|
$5.250
|
$5.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
466.000
|
$2.850
|
$5.150
|
$5.250
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
15,022.000
|
$92.000
|
$98.910
|
$109.800
|
|
|
SP MIXES SP-C SAC-A PG76-22
|
TON
|
10,325.000
|
$101.000
|
$106.260
|
$123.280
|
|
|
TACK COAT
|
GAL
|
4,456.000
|
$3.500
|
$3.500
|
$1.860
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,202.390
|
$6,000.000
|
$1,575.000
|
|
|
TMA (STATIONARY)
|
DAY
|
78.000
|
$188.000
|
$30.000
|
$393.750
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
18.000
|
$240.190
|
$30.000
|
$393.750
|
|
Totals: |
$4,257,368.730
|
$3,768,563.094
|
$4,426,949.154
|