Job Info for 0809-04-057

County: SAN AUGUSTINE Highway: US 96 Date: 12/02/2021 (2 years ago) Engineer's Estimate: $4,257,369 Control Number: 0809-04-057
Project: F 2022(193) District: LUFKIN Time: 102 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY
HCS
Pay Estimates: 1 | 2 | 3 | 4
Plans

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $4,257,368.73
MOORE BROTHERS CONSTRUCTION COMPANY   $3,768,563.09 1
-11.48% | -$488,805.64
TEXAS MATERIALS GROUP, INC.   $4,426,949.15 2
3.98% | $169,580.42
17.47% | $658,386.06

Bid Items

Items: 66, 0 filtered
SAN AUGUSTINE US 96  |  LUFKIN  |  0809-04-057  |  12/02/2021  |  $4,257,369  |  F 2022(193)  |  REHAB EXIST ROADWAY  |  102 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate MOORE BROTHERS CONSTRUCTION COMPANY TEXAS MATERIALS GROUP, INC.
100 6002 PREPARING ROW STA 185.000 $1,800.000 $424.000 $403.200
132 6019 EMBANKMENT (VEHICLE)(ORD COMP)(TY B) CY 16.000 $15.810 $31.000 $576.740
134 6002 BACKFILL (TY B) STA 184.600 $185.000 $138.140 $315.640
158 6003 SPEC EXCAV WORK (HYD EXCAVATOR) HR 33.000 $137.000 $54.000 $152.250
162 6002 BLOCK SODDING SY 1,010.000 $4.870 $5.500 $5.250
164 6009 BROADCAST SEED (TEMP) (WARM) SY 12,309.000 $0.180 $0.130 $0.130
164 6011 BROADCAST SEED (TEMP) (COOL) SY 12,309.000 $0.180 $0.050 $0.130
164 6021 CELL FBR MLCH SEED(PERM)(RURAL)(SANDY) SY 24,619.000 $0.320 $0.360 $0.380
168 6001 VEGETATIVE WATERING MG 1,000.500 $15.500 $5.000 $32.880
316 6416 AGGR (TY E OR L, PE OR PL GR 4) CY 722.000 $300.000 $118.000 $113.400
316 6530 ASPH (AC-15P OR CRS-2P) TON 168.000 $706.630 $890.000 $850.500
351 6008 FLEXIBLE PAVEMENT STRUCTURE REPAIR(12") SY 1,500.000 $90.000 $93.060 $105.260
354 6100 PLANE ASPH CONC PAV (5") SY 54,626.000 $3.250 $2.690 $3.730
400 6005 CEM STABIL BKFL CY 20.000 $123.250 $200.000 $157.500
400 6008 CUT & RESTORE ASPH PAVING SY 37.000 $120.000 $110.000 $210.000
400 6012 CUT AND RESTORE PAV (FLEX BASE) SY 150.000 $54.000 $60.000 $68.250
402 6001 TRENCH EXCAVATION PROTECTION LF 13.000 $30.000 $4.500 $12.600
403 6001 TEMPORARY SPL SHORING SF 112.000 $50.000 $41.000 $105.000
432 6026 RIPRAP (STONE COMMON)(DRY)(18 IN) CY 24.000 $210.000 $235.000 $236.250
464 6003 RC PIPE (CL III)(18 IN) LF 422.000 $60.000 $57.000 $60.900
464 6005 RC PIPE (CL III)(24 IN) LF 120.000 $52.000 $73.000 $131.250
464 6010 RC PIPE (CL III)(48 IN) LF 24.000 $199.000 $402.000 $315.000
466 6041 HEADWALL (CH - FW - 30) (DIA= 48 IN) EA 1.000 $10,000.000 $11,000.000 $13,125.000
466 6056 HEADWALL (CH - FW - 45) (DIA= 48 IN) EA 2.000 $10,000.000 $11,500.000 $13,125.000
467 6363 SET (TY II) (18 IN) (RCP) (6: 1) (P) EA 32.000 $655.000 $750.000 $892.500
467 6395 SET (TY II) (24 IN) (RCP) (6: 1) (P) EA 8.000 $2,580.000 $1,250.000 $1,050.000
467 6580 SET (REMOV & REINSTALL) EA 2.000 $250.000 $390.000 $577.500
496 6016 REMOV STR (PIPE) EA 5.000 $445.000 $193.000 $1,050.000
500 6001 MOBILIZATION LS 1.000 $370,000.000 $185,000.000 $181,367.760
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 19.000 $2,500.000 $1,565.000 $4,311.640
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 500.000 $34.060 $38.000 $36.230
506 6011 ROCK FILTER DAMS (REMOVE) LF 500.000 $6.420 $10.000 $9.450
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 266.000 $15.550 $19.000 $36.750
506 6024 CONSTRUCTION EXITS (REMOVE) SY 266.000 $6.400 $9.800 $9.450
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 7,905.000 $2.730 $3.150 $3.390
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 7,905.000 $0.750 $0.820 $1.180
530 6005 DRIVEWAYS (ACP) SY 1,261.000 $42.000 $20.460 $78.160
533 6001 RUMBLE STRIPS (SHOULDER) LF 36,928.000 $0.300 $0.220 $0.180
533 6004 RUMBLE STRIPS (CENTERLINE) ASPHALT LF 21,454.000 $0.250 $0.220 $0.190
560 6007 MAILBOX INSTALL-S (WC-POST) TY 3 EA 5.000 $178.000 $248.000 $236.250
560 6008 MAILBOX INSTALL-D (WC-POST) TY 3 EA 1.000 $215.220 $247.000 $236.250
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 1.000 $668.000 $886.000 $846.300
644 6007 IN SM RD SN SUP&AM TY10BWG(1)SA(U) EA 1.000 $713.250 $1,295.000 $1,233.750
644 6060 IN SM RD SN SUP&AM TYTWT(1)WS(P) EA 20.000 $338.000 $425.000 $404.250
644 6061 IN SM RD SN SUP&AM TYTWT(1)WS(T) EA 1.000 $450.000 $540.000 $514.500
644 6076 REMOVE SM RD SN SUP&AM EA 23.000 $96.120 $88.000 $84.000
658 6101 INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF EA 30.000 $71.350 $87.000 $84.000
662 6001 WK ZN PAV MRK NON-REMOV (W)4"(BRK) LF 684.000 $0.350 $0.330 $0.530
662 6032 WK ZN PAV MRK NON-REMOV (Y)4"(BRK) LF 2,502.000 $0.300 $0.330 $0.530
662 6034 WK ZN PAV MRK NON-REMOV (Y)4"(SLD) LF 11,520.000 $0.210 $0.330 $0.530
662 6060 WK ZN PAV MRK REMOV (W)4"(BRK) LF 342.000 $1.150 $1.050 $2.630
662 6093 WK ZN PAV MRK REMOV (Y)4"(BRK) LF 1,251.000 $2.200 $1.050 $1.310
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 5,765.000 $1.100 $1.050 $1.310
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 228.000 $1.500 $1.250 $3.170
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 2,124.000 $2.850 $1.250 $3.170
666 6302 RE PM W/RET REQ TY I (W)4"(SLD)(090MIL) LF 750.000 $0.300 $0.500 $0.420
666 6311 RE PM W/RET REQ TY I (Y)4"(BRK)(090MIL) LF 2,810.000 $0.320 $0.500 $0.440
666 6314 RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL) LF 25,583.000 $0.310 $0.500 $0.420
672 6007 REFL PAV MRKR TY I-C EA 38.000 $2.950 $5.250 $5.250
672 6009 REFL PAV MRKR TY II-A-A EA 466.000 $2.850 $5.150 $5.250
3077 6001 SP MIXES SP-B PG64-22 TON 15,022.000 $92.000 $98.910 $109.800
3077 6033 SP MIXES SP-C SAC-A PG76-22 TON 10,325.000 $101.000 $106.260 $123.280
3077 6075 TACK COAT GAL 4,456.000 $3.500 $3.500 $1.860
6001 6002 PORTABLE CHANGEABLE MESSAGE SIGN EA 2.000 $12,202.390 $6,000.000 $1,575.000
6185 6002 TMA (STATIONARY) DAY 78.000 $188.000 $30.000 $393.750
6185 6005 TMA (MOBILE OPERATION) DAY 18.000 $240.190 $30.000 $393.750
Totals: $4,257,368.73 $3,768,563.09 $4,426,949.15