PREPARING ROW
|
STA
|
138.320
|
$800.000
|
$500.000
|
$490.000
|
$900.000
|
$1,500.000
|
$750.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
26.000
|
$50.000
|
$13.000
|
$14.000
|
$14.000
|
$30.000
|
$20.000
|
|
|
|
REMOVING CONC (FLUME)
|
SY
|
231.000
|
$20.000
|
$13.000
|
$14.000
|
$14.000
|
$20.000
|
$25.000
|
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
114.600
|
$275.000
|
$341.000
|
$365.000
|
$275.000
|
$800.000
|
$400.000
|
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
16,088.000
|
$10.000
|
$8.190
|
$8.750
|
$18.000
|
$15.000
|
$30.000
|
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
27.000
|
$135.000
|
$138.000
|
$150.000
|
$160.000
|
$300.000
|
$50.000
|
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
134,411.000
|
$1.000
|
$1.000
|
$1.070
|
$0.500
|
$1.250
|
$1.250
|
|
|
|
BLOCK SODDING
|
SY
|
1,149.000
|
$5.000
|
$5.000
|
$5.600
|
$6.000
|
$6.000
|
$3.500
|
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
67,205.000
|
$0.150
|
$0.110
|
$0.100
|
$0.070
|
$0.110
|
$0.150
|
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
67,205.000
|
$0.150
|
$0.100
|
$0.160
|
$0.070
|
$0.110
|
$0.150
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
134,411.000
|
$0.300
|
$0.350
|
$0.320
|
$0.300
|
$0.320
|
$0.350
|
|
|
|
VEGETATIVE WATERING
|
MG
|
5,395.080
|
$15.000
|
$0.010
|
$0.010
|
$0.010
|
$12.000
|
$0.010
|
|
|
|
CEM TRT(PLNT MX) (CL N)(TYA)(GR1-2)(6")
|
SY
|
14,910.000
|
$29.190
|
$22.900
|
$24.500
|
$20.000
|
$0.000
|
$0.000
|
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
1,844.000
|
$3.250
|
$4.000
|
$4.280
|
$4.200
|
$5.000
|
$3.500
|
|
|
|
ASPH (AC-10-2TR)
|
TON
|
114.000
|
$800.000
|
$675.000
|
$725.000
|
$750.000
|
$1,000.000
|
$822.000
|
|
|
|
ASPH (RC-250)
|
TON
|
16.000
|
$647.000
|
$732.000
|
$785.000
|
$900.000
|
$0.000
|
$0.000
|
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
865.000
|
$135.000
|
$134.000
|
$143.000
|
$110.000
|
$125.000
|
$125.000
|
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
115.000
|
$150.000
|
$128.000
|
$140.000
|
$180.000
|
$0.000
|
$0.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
7.000
|
$300.000
|
$145.000
|
$155.000
|
$150.000
|
$300.000
|
$400.000
|
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
25.000
|
$100.000
|
$12.000
|
$13.000
|
$13.000
|
$10.000
|
$15.000
|
|
|
|
TEMPORARY SPL SHORING
|
SF
|
875.000
|
$50.000
|
$30.000
|
$32.000
|
$31.000
|
$40.000
|
$25.000
|
|
|
|
CL A CONC (FLUME)
|
CY
|
10.000
|
$1,000.000
|
$525.000
|
$562.000
|
$550.000
|
$700.000
|
$700.000
|
|
|
|
CL A CONC (COLLAR)
|
EA
|
20.000
|
$1,000.000
|
$500.000
|
$535.000
|
$520.000
|
$700.000
|
$950.000
|
|
|
|
CL A CONC (PLUG)
|
EA
|
2.000
|
$1,500.000
|
$550.000
|
$588.000
|
$570.000
|
$1,000.000
|
$250.000
|
|
|
|
RIPRAP (CONC)(6 IN)
|
CY
|
24.000
|
$650.000
|
$520.000
|
$556.000
|
$540.000
|
$500.000
|
$500.000
|
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
5.000
|
$350.000
|
$188.000
|
$201.000
|
$190.000
|
$200.000
|
$144.000
|
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
6.000
|
$550.000
|
$648.000
|
$695.000
|
$650.000
|
$800.000
|
$750.000
|
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
444.000
|
$50.000
|
$41.000
|
$44.000
|
$42.000
|
$40.000
|
$70.000
|
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
132.000
|
$55.000
|
$59.000
|
$63.000
|
$60.000
|
$55.000
|
$95.000
|
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
98.000
|
$75.000
|
$93.000
|
$100.000
|
$95.000
|
$70.000
|
$175.000
|
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
28.000
|
$110.000
|
$150.000
|
$106.000
|
$155.000
|
$100.000
|
$195.000
|
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
128.000
|
$125.000
|
$179.000
|
$190.000
|
$185.000
|
$120.000
|
$225.000
|
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
20.000
|
$140.000
|
$199.000
|
$213.000
|
$210.000
|
$150.000
|
$275.000
|
|
|
|
INLET(COMPL)(PAZD)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$6,000.000
|
$5,000.000
|
$5,350.000
|
$5,200.000
|
$6,000.000
|
$6,500.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
6.000
|
$9,000.000
|
$5,437.000
|
$5,820.000
|
$5,700.000
|
$7,000.000
|
$14,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 66 IN)
|
EA
|
1.000
|
$10,500.000
|
$22,902.000
|
$24,500.000
|
$23,000.000
|
$16,000.000
|
$15,000.000
|
|
|
|
HEADWALL (CH - PW - 0) (DIA= 72 IN)
|
EA
|
3.000
|
$14,000.000
|
$25,955.000
|
$27,770.000
|
$27,000.000
|
$20,000.000
|
$20,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$6,000.000
|
$9,794.000
|
$10,500.000
|
$10,000.000
|
$7,000.000
|
$7,500.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$7,000.000
|
$11,087.000
|
$11,875.000
|
$11,500.000
|
$8,000.000
|
$9,000.000
|
|
|
|
HEADWALL (CH - PW - S) (DIA= 72 IN)
|
EA
|
2.000
|
$11,000.000
|
$21,366.000
|
$22,875.000
|
$22,000.000
|
$26,000.000
|
$15,000.000
|
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
1.000
|
$15,000.000
|
$15,865.000
|
$16,975.000
|
$16,000.000
|
$1,000.000
|
$15,000.000
|
|
|
|
HEADWALL (CH - PW - 0)(DIA= 27IN) (MOD)
|
EA
|
1.000
|
$20,000.000
|
$14,732.000
|
$15,750.000
|
$15,000.000
|
$8,000.000
|
$7,500.000
|
|
|
|
HEADWALL (CH - PW - 0)(DIA= 72IN) (MOD)
|
EA
|
1.000
|
$30,000.000
|
$25,261.000
|
$27,000.000
|
$26,000.000
|
$15,000.000
|
$12,500.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
3.000
|
$600.000
|
$502.000
|
$535.000
|
$530.000
|
$500.000
|
$750.000
|
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
30.000
|
$650.000
|
$539.000
|
$580.000
|
$560.000
|
$575.000
|
$825.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,000.000
|
$961.000
|
$1,030.000
|
$1,000.000
|
$900.000
|
$900.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$913.000
|
$975.000
|
$950.000
|
$900.000
|
$900.000
|
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,750.000
|
$2,123.000
|
$2,300.000
|
$2,200.000
|
$2,000.000
|
$3,900.000
|
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$6,000.000
|
$5,407.000
|
$5,800.000
|
$5,500.000
|
$6,000.000
|
$5,000.000
|
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$3,000.000
|
$819.000
|
$875.000
|
$830.000
|
$1,000.000
|
$1,500.000
|
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,000.000
|
$448.000
|
$480.000
|
$460.000
|
$500.000
|
$1,000.000
|
|
|
|
REMOV STR (SET)
|
EA
|
3.000
|
$450.000
|
$224.000
|
$240.000
|
$230.000
|
$500.000
|
$1,000.000
|
|
|
|
REMOV STR (PIPE)
|
EA
|
18.000
|
$400.000
|
$250.000
|
$265.000
|
$260.000
|
$500.000
|
$1,000.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$580,000.000
|
$328,000.000
|
$280,000.000
|
$500,000.000
|
$600,000.000
|
$650,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,000.000
|
$2,200.000
|
$1,775.000
|
$5,000.000
|
$10,000.000
|
$5,000.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
835.000
|
$42.000
|
$34.000
|
$37.000
|
$31.000
|
$38.000
|
$40.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
835.000
|
$8.000
|
$13.000
|
$9.000
|
$10.000
|
$13.000
|
$10.000
|
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
234.000
|
$35.000
|
$25.000
|
$37.000
|
$15.000
|
$28.000
|
$25.000
|
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
234.000
|
$10.000
|
$13.000
|
$9.000
|
$3.000
|
$13.000
|
$10.000
|
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
9,040.000
|
$2.500
|
$2.600
|
$2.890
|
$2.700
|
$3.500
|
$2.500
|
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
9,040.000
|
$1.000
|
$1.100
|
$0.820
|
$0.650
|
$1.100
|
$1.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
216.000
|
$4.000
|
$6.000
|
$5.250
|
$6.500
|
$8.000
|
$6.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
216.000
|
$1.000
|
$4.000
|
$1.050
|
$1.100
|
$4.000
|
$2.000
|
|
|
|
INTERSECTIONS (ACP)
|
SY
|
458.000
|
$70.000
|
$73.750
|
$62.860
|
$90.000
|
$95.000
|
$50.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
8,873.000
|
$30.000
|
$33.250
|
$29.200
|
$30.000
|
$55.000
|
$50.000
|
|
|
|
TURNOUTS (SURF TREAT)
|
SY
|
90.000
|
$40.000
|
$39.000
|
$77.290
|
$90.000
|
$55.000
|
$75.000
|
|
|
|
DRIVEWAYS (BASE)
|
SY
|
205.000
|
$30.000
|
$20.000
|
$21.500
|
$50.000
|
$30.000
|
$30.000
|
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
19,134.000
|
$0.250
|
$0.400
|
$0.390
|
$0.450
|
$0.450
|
$0.300
|
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
9,637.000
|
$0.200
|
$0.400
|
$0.620
|
$0.450
|
$0.550
|
$0.250
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$450.000
|
$535.000
|
$435.000
|
$430.000
|
$600.000
|
$500.000
|
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
4.000
|
$200.000
|
$330.000
|
$215.000
|
$200.000
|
$400.000
|
$195.000
|
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
4.000
|
$220.000
|
$375.000
|
$225.000
|
$230.000
|
$400.000
|
$195.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$470.000
|
$655.000
|
$500.000
|
$580.000
|
$700.000
|
$750.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$620.000
|
$815.000
|
$825.000
|
$670.000
|
$900.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$715.000
|
$810.000
|
$850.000
|
$730.000
|
$900.000
|
$800.000
|
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
33.000
|
$365.000
|
$475.000
|
$335.000
|
$320.000
|
$500.000
|
$500.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)SRF
|
EA
|
28.000
|
$85.000
|
$90.000
|
$83.000
|
$35.000
|
$100.000
|
$225.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
7,170.000
|
$0.350
|
$0.200
|
$0.220
|
$0.210
|
$0.220
|
$0.250
|
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
85,890.000
|
$0.250
|
$0.200
|
$0.220
|
$0.210
|
$0.220
|
$0.250
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
92,880.000
|
$0.300
|
$0.200
|
$0.220
|
$0.210
|
$0.220
|
$0.220
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,568.000
|
$1.500
|
$1.000
|
$1.000
|
$0.680
|
$2.000
|
$1.000
|
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
61,920.000
|
$1.000
|
$0.010
|
$0.500
|
$0.680
|
$1.500
|
$3.000
|
|
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
260.000
|
$1.000
|
$1.000
|
$1.100
|
$1.050
|
$1.100
|
$1.000
|
|
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
432.000
|
$0.750
|
$1.000
|
$1.100
|
$1.050
|
$1.100
|
$1.000
|
|
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,390.000
|
$0.450
|
$0.600
|
$0.660
|
$0.630
|
$0.660
|
$0.700
|
|
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
28,630.000
|
$0.450
|
$0.500
|
$0.550
|
$0.530
|
$0.550
|
$0.600
|
|
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
30,960.000
|
$0.450
|
$0.500
|
$0.550
|
$0.530
|
$0.550
|
$0.700
|
|
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
108.000
|
$30.000
|
$15.000
|
$16.500
|
$16.000
|
$18.000
|
$15.000
|
|
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
2.000
|
$200.000
|
$200.000
|
$220.000
|
$210.000
|
$220.000
|
$250.000
|
|
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
2.000
|
$675.000
|
$400.000
|
$440.000
|
$420.000
|
$440.000
|
$400.000
|
|
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
2.000
|
$300.000
|
$300.000
|
$330.000
|
$315.000
|
$330.000
|
$300.000
|
|
|
|
REFL PAV MRKR TY I-C
|
EA
|
141.000
|
$3.000
|
$3.500
|
$3.850
|
$3.700
|
$4.000
|
$3.500
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
390.000
|
$3.500
|
$3.500
|
$3.850
|
$3.700
|
$4.000
|
$3.500
|
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,750.000
|
$0.350
|
$0.400
|
$0.440
|
$0.500
|
$0.440
|
$1.000
|
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
4,921.000
|
$95.000
|
$95.000
|
$93.180
|
$93.000
|
$0.000
|
$0.000
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
12,338.000
|
$105.000
|
$95.000
|
$100.250
|
$96.000
|
$95.000
|
$99.000
|
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
8,560.000
|
$110.000
|
$95.000
|
$95.860
|
$98.000
|
$100.000
|
$105.000
|
|
|
|
TACK COAT
|
GAL
|
4,669.000
|
$10.000
|
$3.650
|
$3.900
|
$4.000
|
$0.000
|
$0.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$18,000.000
|
$12,000.000
|
$10,000.000
|
$20,000.000
|
$2,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
62.000
|
$200.000
|
$150.000
|
$160.000
|
$220.000
|
$300.000
|
$1,500.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
13.000
|
$200.000
|
$0.010
|
$100.000
|
$100.000
|
$300.000
|
$250.000
|
|
1
|
|
SP MIXES SP-B PG64-22
|
TON
|
9,840.000
|
$95.000
|
$0.000
|
$0.000
|
$0.000
|
$90.000
|
$97.000
|
|
1
|
|
TACK COAT
|
GAL
|
4,221.000
|
$10.000
|
$0.000
|
$0.000
|
$0.000
|
$5.000
|
$5.000
|
|
Totals: |
$6,740,115.300
|
$4,885,972.001
|
$4,974,656.771
|
$5,221,911.741
|
$6,089,889.880
|
$6,402,081.101
|