PREPARING ROW
|
STA
|
420.000
|
$350.000
|
$380.710
|
$745.000
|
$500.000
|
$330.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,289.000
|
$30.000
|
$19.000
|
$23.000
|
$20.000
|
$16.500
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
419.900
|
$250.000
|
$304.100
|
$135.000
|
$160.000
|
$290.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
3,332.000
|
$20.000
|
$2.000
|
$26.860
|
$30.000
|
$12.450
|
|
|
BLADING
|
STA
|
419.900
|
$100.000
|
$96.000
|
$176.450
|
$120.000
|
$175.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
32.000
|
$130.000
|
$119.000
|
$110.000
|
$125.000
|
$275.000
|
|
|
BLOCK SODDING
|
SY
|
1,445.000
|
$5.000
|
$4.760
|
$4.760
|
$6.000
|
$5.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
45,099.000
|
$0.150
|
$0.100
|
$0.090
|
$0.100
|
$0.130
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
45,099.000
|
$0.150
|
$0.100
|
$0.080
|
$0.100
|
$0.130
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
90,198.000
|
$0.350
|
$0.300
|
$0.300
|
$0.360
|
$0.330
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
1,571.000
|
$0.750
|
$1.560
|
$1.550
|
$1.240
|
$1.100
|
|
|
VEGETATIVE WATERING
|
MG
|
3,665.500
|
$15.000
|
$0.010
|
$0.010
|
$10.000
|
$2.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
3,958.000
|
$2.500
|
$0.890
|
$0.890
|
$1.300
|
$1.200
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
1,800.000
|
$10.000
|
$0.010
|
$0.010
|
$3.000
|
$2.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2)
|
TON
|
48,784.000
|
$40.000
|
$41.830
|
$40.750
|
$40.000
|
$48.000
|
|
|
CEMENT
|
TON
|
2,187.000
|
$145.000
|
$143.620
|
$157.060
|
$145.000
|
$190.000
|
|
|
CEMENT TREAT(MX EXST MTL & NW BS)(12")
|
SY
|
121,517.000
|
$2.500
|
$3.010
|
$3.250
|
$3.500
|
$2.250
|
|
|
FOG SEAL (SS-1 OR CSS-1)
|
GAL
|
4,857.000
|
$10.000
|
$5.030
|
$2.500
|
$2.000
|
$4.000
|
|
|
ASPH (RC-250)
|
TON
|
132.000
|
$725.000
|
$885.570
|
$825.000
|
$975.000
|
$1,000.000
|
|
|
AGGR (TY-PE, E, L OR PL GR 3)
|
CY
|
1,352.000
|
$120.000
|
$115.840
|
$106.000
|
$140.000
|
$185.000
|
|
|
AGGR (TY E OR L GR 5)
|
CY
|
937.000
|
$100.000
|
$128.480
|
$170.000
|
$140.000
|
$165.000
|
|
|
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
|
CY
|
1,107.000
|
$125.000
|
$121.060
|
$101.000
|
$150.000
|
$185.000
|
|
|
ASPH (AC-15P, AC-10-2TR, OR CRS-2P)
|
TON
|
463.000
|
$600.000
|
$672.400
|
$580.000
|
$800.000
|
$950.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22 NON-MOW STRIP
|
SY
|
1,595.000
|
$50.000
|
$37.460
|
$61.430
|
$70.000
|
$48.000
|
|
|
CEM STABIL BKFL
|
CY
|
0.920
|
$500.000
|
$185.000
|
$194.250
|
$190.000
|
$950.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
8.000
|
$1,100.000
|
$500.000
|
$525.000
|
$515.000
|
$1,400.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
6.000
|
$180.000
|
$185.000
|
$204.750
|
$200.000
|
$300.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
13.000
|
$750.000
|
$600.000
|
$630.000
|
$620.000
|
$760.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
6.000
|
$600.000
|
$690.000
|
$724.500
|
$710.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,738.000
|
$55.000
|
$37.600
|
$39.480
|
$40.000
|
$40.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
70.000
|
$120.000
|
$60.200
|
$63.210
|
$60.000
|
$65.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
10.000
|
$250.000
|
$158.980
|
$166.930
|
$160.000
|
$125.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
1.000
|
$4,000.000
|
$4,025.000
|
$4,226.250
|
$4,100.000
|
$5,000.000
|
|
|
HEADWALL (CH - FW - 0) (DIA= 18 IN)
|
EA
|
2.000
|
$3,350.000
|
$3,150.000
|
$3,307.500
|
$3,250.000
|
$6,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
1.000
|
$4,000.000
|
$3,359.000
|
$3,526.950
|
$3,500.000
|
$5,500.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 54 IN)
|
EA
|
2.000
|
$8,000.000
|
$10,520.000
|
$11,046.000
|
$10,800.000
|
$11,400.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 60 IN)
|
EA
|
1.000
|
$8,000.000
|
$12,204.000
|
$12,814.200
|
$12,500.000
|
$14,000.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
2.000
|
$5,775.000
|
$5,717.000
|
$6,002.850
|
$5,900.000
|
$8,500.000
|
|
|
WINGWALL (PW - 2) (HW=12 FT)
|
EA
|
1.000
|
$25,000.000
|
$42,000.000
|
$44,100.000
|
$43,250.000
|
$31,500.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$15,000.000
|
$10,781.000
|
$11,320.050
|
$11,100.000
|
$8,400.000
|
|
|
SET (TY II) (18 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,000.000
|
$550.000
|
$577.500
|
$570.000
|
$560.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
15.000
|
$650.000
|
$550.000
|
$577.500
|
$570.000
|
$575.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
126.000
|
$650.000
|
$550.000
|
$577.500
|
$570.000
|
$585.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,100.000
|
$750.000
|
$787.500
|
$775.000
|
$725.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$970.000
|
$950.000
|
$997.500
|
$1,000.000
|
$925.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,200.000
|
$1,250.000
|
$1,312.500
|
$1,290.000
|
$1,175.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,900.000
|
$1,150.000
|
$1,207.500
|
$1,200.000
|
$2,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
2.000
|
$1,700.000
|
$950.000
|
$997.500
|
$1,000.000
|
$2,800.000
|
|
|
REMOV STR (PIPE)
|
EA
|
64.000
|
$215.000
|
$240.000
|
$252.000
|
$250.000
|
$125.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$603,000.000
|
$332,150.000
|
$385,000.000
|
$500,000.000
|
$560,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
21.000
|
$1,500.000
|
$1,775.000
|
$15,000.000
|
$10,000.000
|
$3,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,970.000
|
$30.000
|
$5.000
|
$15.000
|
$30.000
|
$35.750
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,970.000
|
$10.000
|
$1.000
|
$5.250
|
$10.000
|
$10.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$25.000
|
$0.010
|
$30.000
|
$28.000
|
$35.750
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$10.000
|
$0.010
|
$5.000
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,000.000
|
$3.000
|
$3.000
|
$3.250
|
$3.000
|
$3.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,000.000
|
$1.000
|
$1.000
|
$0.500
|
$1.000
|
$1.100
|
|
|
INTERSECTIONS (ACP)
|
SY
|
153.000
|
$40.000
|
$44.000
|
$31.450
|
$80.000
|
$63.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,200.000
|
$80.000
|
$86.000
|
$90.300
|
$90.000
|
$90.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,408.000
|
$40.000
|
$38.000
|
$36.850
|
$40.000
|
$37.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,687.000
|
$30.000
|
$38.000
|
$33.340
|
$25.000
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
802.000
|
$48.000
|
$39.560
|
$42.710
|
$42.000
|
$42.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,625.000
|
$25.000
|
$20.480
|
$23.100
|
$23.000
|
$26.250
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
100.000
|
$30.000
|
$22.580
|
$21.000
|
$28.000
|
$32.450
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$2.500
|
$1.890
|
$2.630
|
$3.000
|
$2.750
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$250.000
|
$183.750
|
$210.000
|
$400.000
|
$275.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
20.000
|
$2,600.000
|
$2,583.000
|
$2,467.500
|
$2,900.000
|
$2,500.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
18.000
|
$195.000
|
$183.750
|
$150.470
|
$225.000
|
$190.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
8.000
|
$225.000
|
$194.250
|
$218.720
|
$350.000
|
$205.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
4.000
|
$550.000
|
$472.500
|
$503.900
|
$490.000
|
$495.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
8.000
|
$600.000
|
$500.000
|
$505.890
|
$550.000
|
$525.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$625.000
|
$593.250
|
$622.020
|
$900.000
|
$620.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
1.000
|
$925.000
|
$1,004.850
|
$1,150.590
|
$340.000
|
$1,050.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
47.000
|
$335.000
|
$362.250
|
$270.060
|
$30.000
|
$380.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
36.000
|
$30.000
|
$23.100
|
$18.590
|
$30.000
|
$30.250
|
|
|
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
|
EA
|
42.000
|
$100.000
|
$99.750
|
$83.060
|
$130.000
|
$105.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
83,978.000
|
$0.250
|
$0.160
|
$0.160
|
$0.150
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
83,978.000
|
$0.250
|
$0.160
|
$0.160
|
$0.150
|
$0.170
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,398.000
|
$1.000
|
$1.000
|
$1.410
|
$0.430
|
$1.200
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
83,978.000
|
$0.750
|
$0.740
|
$0.740
|
$0.720
|
$0.770
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(090MIL)
|
LF
|
37,513.000
|
$0.750
|
$0.740
|
$0.740
|
$0.720
|
$0.770
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(090MIL)
|
LF
|
4,476.000
|
$0.750
|
$0.740
|
$0.740
|
$0.720
|
$0.770
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
12.000
|
$15.000
|
$21.000
|
$21.000
|
$20.600
|
$21.250
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,050.000
|
$3.000
|
$3.680
|
$3.680
|
$3.610
|
$3.850
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$5,000.000
|
$4,000.000
|
$10,000.000
|
$16,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
188.000
|
$80.000
|
$100.000
|
$120.000
|
$350.000
|
$125.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
11.000
|
$200.000
|
$50.000
|
$10.500
|
$500.000
|
$125.000
|
|
Totals: |
$5,813,260.500
|
$5,469,057.445
|
$6,024,431.620
|
$6,223,975.300
|
$6,587,110.890
|