Job Info for 6442-70-001

County: SABINE Highway: US0096 Date: 06/14/2023 (1 year ago) Engineer's Estimate: $172,755 Control Number: 6442-70-001
Project: RMC - 644270001 District: LUFKIN Time: 365 CALENDAR DAYS Type: METAL BEAM GUARD FENCE REPAIR
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11
Plans: Plans | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $172,755.46
ACE CONTRACTORS, INC.   $146,157.50 1
-15.4% | -$26,597.96

Bid Items

Items: 49, 0 filtered
SABINE US0096  |  LUFKIN  |  6442-70-001  |  06/14/2023  |  $172,755  |  RMC - 644270001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item code Description Unit Quantity Engineer's Estimate ACE CONTRACTORS, INC.
104 6021 REMOVING CONC (CURB) LF 60.000 $5.630 $1.000
429 6007 CONC STR REPAIR (VERTICAL & OVERHEAD) SF 100.000 $100.000 $1.000
429 6009 CONC STR REPAIR (STANDARD) SF 15.000 $500.000 $75.000
450 6018 RAIL (TY T631) LF 30.000 $60.000 $50.000
450 6019 RAIL (TY T631LS) LF 20.000 $65.000 $75.000
500 6033 MOBILIZATION (CALLOUT) EA 10.000 $2,000.000 $1,000.000
540 6001 MTL W-BEAM GD FEN (TIM POST) LF 400.000 $30.500 $30.000
540 6005 TERMINAL ANCHOR SECTION EA 4.000 $5.000 $0.050
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 2.000 $2,000.000 $1,500.000
540 6008 MTL BEAM GD FEN TRANS (T101) EA 4.000 $1,200.000 $1,000.000
540 6014 SHORT RADIUS LF 50.000 $35.000 $10.000
540 6015 DRIVEWAY TERMINAL ANCHOR SECTION EA 2.000 $450.000 $200.000
540 6016 DOWNSTREAM ANCHOR TERMINAL SECTION EA 4.000 $1,450.000 $50.000
540 6017 MTL BM GD FEN (LONG SPAN SYSTEM) LF 65.000 $50.000 $50.000
540 6018 MTL BM GD FEN TRANS (NON - SYM) EA 8.000 $200.000 $10.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 35.000 $50.000 $25.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 4,000.000 $3.000 $1.000
542 6002 REMOVE TERMINAL ANCHOR SECTION EA 3.000 $1.000 $0.100
542 6003 REMOVE DOWNSTREAM ANCHOR TERMINAL EA 20.000 $250.000 $0.100
542 6004 RM MTL BM GD FENCE TRANS (THRIE-BEAM) EA 6.000 $200.000 $500.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 6.000 $3,317.860 $5,000.000
544 6002 GUARDRAIL END TREATMENT (MOVE & RESET) EA 6.000 $300.000 $100.000
544 6006 GDRAIL END TRT(INST)(WOOD POST)(TY III) EA 6.000 $150.000 $500.000
658 6016 INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI) EA 10.000 $28.500 $25.000
658 6099 INSTL OM ASSM (OM-2Z)(WFLX)GND EA 10.000 $52.500 $25.000
770 6001 REPAIR RAIL ELEMENT (W - BEAM) LF 600.000 $23.750 $32.000
770 6003 REP RAIL ELMNT(THRIE-BM TRANS TO W -BM) LF 25.000 $30.000 $25.000
770 6010 REM / REPL TIMBER/STL POST W/O CONC FND EA 40.000 $52.500 $60.000
770 6011 REM / REPL TIMBER / STL POST W/CONC FND EA 15.000 $75.000 $75.000
770 6016 REPAIR STEEL POST WITH BASE PLATE EA 5.000 $175.000 $125.000
770 6017 REALIGN POSTS EA 20.000 $30.000 $35.000
770 6018 INSTALL BLOCKOUT (TYPE SPECIFIED) EA 20.000 $20.000 $25.000
770 6019 REMOVE & REPLACE BLOCKOUT EA 5.000 $30.000 $25.000
770 6021 REPLACE SINGLE GDRAIL TERMINAL RAIL LF 75.000 $50.000 $60.000
770 6022 REPLACE SINGLE GDRAIL TERMINAL POST EA 15.000 $100.000 $125.000
770 6023 REPAIR OF TERMINAL ANCHORS POSTS EA 20.000 $1.000 $10.000
770 6024 REPLACE TERMINAL ANCHOR POSTS EA 20.000 $1.000 $10.000
770 6027 REMOVE GDRAIL END TRT / REPL WITH SGT EA 3.000 $4,650.000 $5,000.000
770 6028 REPL SINGLE GDRAIL TERM IMPACT HEAD EA 4.000 $1,250.000 $1,000.000
770 6029 REM & RESET SGT IMPACT HEAD EA 4.000 $200.000 $250.000
770 6030 REPLACE SGT CABLE ASSEMBLY EA 5.000 $65.000 $1.000
770 6031 REPLACE SGT CABLE ANCHOR EA 5.000 $40.000 $1.000
770 6032 REPLACE SGT STRUT EA 5.000 $30.000 $1.000
770 6033 REPLACE SGT OBJECT MARKER EA 5.000 $50.000 $25.000
770 6034 REPAIR RAIL ELEMENT(W - BEAM FURNISHED) LF 50.000 $10.000 $5.000
774 6017 REPAIR (WIDE QUAD) EA 2.000 $1,300.000 $2,500.000
776 6004 REPAIR (STL POST W/ DOUBLED W-BEAMS-T6) LF 25.000 $50.000 $10.000
776 6020 REPAIR (TY T101RC) LF 25.000 $62.500 $50.000
6185 6002 TMA (STATIONARY) DAY 10.000 $200.000 $750.000
Totals: $172,755.46 $146,157.50