SABINE SH 21 (0119-05-004)

Items: 79

County: SABINE
Length: N/A
Highway: SH 21
District: LUFKIN
Control Number: 0119-05-004
DBE Goal: 200.0%
Project: F 2B24(146)
Guaranty: N/A
Time: 124 WORKING DAYS
Engineer's Estimate: $1,702,275.25
Date: 06/05/2024 (1 year ago)
Contract Number: N/A
Type: INTERSECTION IMPROVEMENTS WITH RIGHT AND/OR LEFT T
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$1,702,275.25
$1,987,987.05
Over/Under Est: 16.78% $285,711.80
Subcontractor Percentage Amount
AMERICAN REMEDIATION OPTIONS, INC. 4.88% $101,329.51
A R BROTHERS CONSTRUCTION SERVICES, INC. 3.67% $76,204.77
INTERSTATE BARRICADES & MARKINGS, INC. 3.37% $69,975.50
LELAND & BRADLEE CONSTRUCTION, INC. 3.19% $66,237.94
DUSTROL, INC. 0.95% $19,726.03
PANOLA SIGN & BARRICADE, INC. 0.65% $13,496.76
Total: 16.71% $346,970.51

Bid Items & Bid Tabulations

79 Total 0 of 79
SABINE  |  SH 21  |  LUFKIN  |  0119-05-004  |  06/05/2024  |  $1,702,275.25  |  F 2B24(146)  |  INTERS IMPRVS WITH RIGHT AND/OR LEFT...  |  124 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 14.000 $2,000.000 $1,930.940
SUBGRADE WIDENING (DENS CONT)
STA 13.200 $3,450.000 $5,431.100
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 300.000 $35.000 $92.330
BACKFILL (TY A)
STA 1.000 $300.000 $2,618.270
FURNISHING AND PLACING TOPSOIL (4")
SY 9,098.000 $5.500 $8.930
BLOCK SODDING
SY 123.000 $10.000 $16.500
ROLL SODDING
SY 1,537.000 $6.000 $8.250
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 9,098.000 $2.000 $1.100
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 4,549.000 $2.000 $1.100
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 4,549.000 $2.000 $1.100
VEGETATIVE WATERING
MG 366.400 $30.000 $18.550
SPRINKLING (DUST CONTROL)
MG 95.500 $5.000 $71.170
CEM TRT (PLNT MX)(CL N)(TY A)(GR3)(12")
SY 5,323.000 $100.000 $100.290
ASPH (RC-250)
TON 7.000 $1,900.000 $1,577.770
AGGR (TY E OR L, PE OR PL GR 4)
CY 72.000 $250.000 $480.910
AGGR (TY E OR L GR 5)
CY 37.000 $250.000 $706.620
ASPH (AC-15P OR CRS-2P)
TON 12.900 $1,000.000 $1,605.310
PLANE ASPH CONC PAV(2" TO 4")
SY 524.000 $8.000 $23.340
PLANE ASPH CONC PAV (2")
SY 2,721.000 $5.000 $7.800
DRILL SHAFT (SIGN MTS) (24 IN)
LF 24.000 $300.000 $324.500
CL C CONC (COLLAR)
EA 1.000 $1,500.000 $3,300.000
RIPRAP (STONE TY R)(GROUT)(8 IN)
CY 11.000 $310.000 $3,300.000
RC PIPE (CL III)(18 IN)
LF 52.000 $90.000 $165.000
HEADWALL (CH - PW - 0) (DIA= 33 IN)
EA 1.000 $10,000.000 $16,500.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,000.000 $2,750.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,500.000 $3,300.000
REMOV STR (PIPE)
LF 43.000 $25.000 $38.500
MOBILIZATION
LS 1.000 $155,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $3,500.000 $942.500
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 44.000 $45.000 $52.250
ROCK FILTER DAMS (REMOVE)
LF 44.000 $15.000 $15.400
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 94.000 $10.000 $40.150
CONSTRUCTION EXITS (REMOVE)
SY 94.000 $5.000 $15.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,432.000 $5.000 $3.850
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,432.000 $1.500 $1.100
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 20.000 $60.000 $451.310
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $70.000 $293.660
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 20.000 $20.000 $495.370
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $20.000 $247.680
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 20.000 $20.000 $495.370
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $20.000 $247.680
DRIVEWAYS (ACP)
SY 637.000 $75.000 $104.490
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $30.000 $33.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 2.000 $800.000 $1,072.500
REMOVE METAL BEAM GUARD FENCE
LF 337.500 $5.000 $3.300
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $3,520.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $300.000 $550.000
ALUMINUM SIGNS (TY G)
SF 198.000 $30.000 $57.750
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 8.000 $450.000 $577.500
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 1.000 $550.000 $771.100
RELOCATE SM RD SN SUP&AM TY TWT
EA 2.000 $700.000 $379.500
REMOVE SM RD SN SUP&AM
EA 7.000 $110.000 $214.500
INSTALL LRSS (STRUCT STEEL)
LB 1,192.000 $10.000 $8.780
REMOVE LRSA
EA 1.000 $500.000 $2,750.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $40.000 $39.600
INSTL OM ASSM (OM-2Z)(WFLX)SRF(BI)
EA 2.000 $100.000 $137.500
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 2,958.000 $0.750 $0.550
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 8,878.000 $0.750 $0.550
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 7,474.000 $2.750 $2.480
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 7,474.000 $2.750 $2.480
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 226.000 $3.000 $3.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 1,143.000 $2.000 $3.420
REFL PAV MRK TY I (W)6"(DOT)(090MIL)
LF 153.000 $1.500 $3.850
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 833.000 $1.750 $2.750
REF PROF PAV MRK TY I(W)6"(SLD)(090MIL)
LF 2,845.000 $1.000 $2.750
REF PROF PAV MRK TY I(Y)6"(SLD)(090MIL)
LF 5,073.000 $1.000 $2.750
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $260.000 $385.000
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 2.000 $500.000 $605.000
PREFAB PAV MRK TY C (W) (WORD)
EA 4.000 $325.000 $412.500
REFL PAV MRKR TY I-C
EA 41.000 $7.000 $8.800
REFL PAV MRKR TY II-A-A
EA 460.000 $6.000 $8.800
SP MIXES SP-C PG70-22
TON 1,061.000 $175.000 $238.220
SP MIXES SP-C SAC-A PG70-22
TON 1,061.000 $175.000 $208.230
SP MIXES SP-D PG64-22 (LEVEL-UP)
TON 81.000 $175.000 $391.330
SP MIXES SP-D PG64-22 (EXEMPT)
TON 43.000 $175.000 $602.890
BONDING COURSE
GAL 1,085.000 $7.000 $8.100
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $20,000.000 $1,636.250
TMA (STATIONARY)
DAY 224.000 $250.000 $10.460
TMA (MOBILE OPERATION)
DAY 12.000 $250.000 $209.130
Totals: $1,702,275.250 $1,987,987.064