SABINE FM 1 (0064-05-061)

Items: 72

County: SABINE
Length: N/A
Highway: FM 1
District: LUFKIN
Control Number: 0064-05-061
DBE Goal: N/A
Project: STP 2019(330)HES
Guaranty: N/A
Time: 77 WORKING DAYS
Engineer's Estimate: $2,054,935.30
Date: 12/05/2018 (7 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$2,054,935.30
$1,954,394.00
Over/Under Est: -4.89% -$100,541.30
Over/Under Est: 0.52% $10,718.09
Amt Left: 5.69% $111,259.39
Over/Under Est: 0.91% $18,779.29
Amt Left: 6.11% $119,320.59
Delta: -0.39% -$8,061.20
$2,183,435.10
Over/Under Est: 6.25% $128,499.80
Amt Left: 11.72% $229,041.10
Delta: -5.29% -$109,720.51
Over/Under Est: 26.43% $543,190.40
Amt Left: 32.94% $643,731.70
Delta: -18.99% -$414,690.60

Bid Items & Bid Tabulations

72 Total 0 of 72
SABINE  |  FM 1  |  LUFKIN  |  0064-05-061  |  12/05/2018  |  $2,054,935.30  |  STP 2019(330)HES  |  SAFETY TREAT FIXED OBJECTS  |  77 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LONGVIEW BRIDGE AND ROAD, LTD.
PINTO CONSTRUCTION CO., INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
A. L. HELMCAMP, INC.
EAST TEXAS BRIDGE, INC.
PREPARING ROW
STA 144.000 $1,000.000 $700.000 $1,600.000 $650.000 $1,300.000 $600.000
SUBGRADE WIDENING (ORD COMP)
STA 144.000 $250.000 $155.000 $82.000 $210.000 $650.000 $400.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
CY 2,021.000 $15.000 $11.000 $11.000 $21.000 $12.000 $13.000
BLADING
STA 144.000 $100.000 $40.000 $135.000 $100.000 $280.000 $300.000
SPEC EXCAV WORK (HYD EXCAVATOR)
HR 58.000 $100.000 $150.000 $105.000 $120.000 $75.000 $135.000
BLOCK SODDING
SY 990.000 $5.000 $5.500 $5.250 $5.250 $5.000 $7.000
BROADCAST SEED (TEMP) (WARM)
SY 79,361.000 $0.150 $0.100 $0.130 $0.150 $0.050 $0.110
BROADCAST SEED (TEMP) (COOL)
SY 79,361.000 $0.150 $0.100 $0.130 $0.150 $0.050 $0.110
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 158,722.000 $0.300 $0.300 $0.280 $0.300 $0.100 $0.300
VEGETATIVE WATERING
MG 3,194.400 $15.000 $5.000 $0.010 $5.000 $1.000 $8.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 2,100.000 $3.000 $1.000 $0.960 $1.000 $1.500 $1.750
CEM TRT(PLNT MX)(CLN)(TY D)(GR1-2)(10")
SY 10,912.000 $40.000 $40.000 $50.000 $39.000 $41.000 $58.000
ASPH (RC-250)
GAL 3,194.400 $3.500 $4.700 $4.400 $4.500 $5.000 $6.000
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
GAL 17,438.000 $3.000 $3.700 $2.980 $3.100 $3.400 $4.000
AGGR (TY E OR L GR 5)
CY 98.000 $100.000 $150.000 $127.000 $187.000 $270.000 $150.000
AGGR(TY PE,TY-PL,TY-E,TY-L GR-4)(SAC-B)
CY 377.000 $110.000 $150.000 $127.000 $131.000 $120.000 $165.000
SUPERPAVE MIXTURES SP-D PG64-22
TON 3,425.000 $95.000 $110.000 $104.200 $115.000 $115.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 100.000 $50.000 $90.000 $65.000 $83.000 $69.000 $100.000
CEM STABIL BKFL
CY 47.000 $175.000 $180.000 $183.750 $170.000 $170.000 $300.000
CUT & RESTORE ASPH PAVING
SY 5.000 $110.000 $100.000 $141.750 $117.000 $220.000 $100.000
CUT AND RESTORE PAV (FLEX BASE)
SY 203.000 $100.000 $80.000 $54.600 $60.000 $60.000 $40.000
TRENCH EXCAVATION PROTECTION
LF 65.000 $5.000 $15.000 $14.180 $34.000 $7.000 $10.000
TEMPORARY SPL SHORING
SF 60.000 $15.000 $15.000 $47.250 $102.000 $34.000 $150.000
RIPRAP (CONC)(CL C)
CY 3.200 $390.000 $430.000 $525.000 $645.000 $600.000 $750.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 14.000 $500.000 $650.000 $583.800 $700.000 $640.000 $800.000
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
LF 14.000 $650.000 $650.000 $640.500 $735.000 $640.000 $800.000
RC PIPE (CL III)(18 IN)
LF 804.000 $40.000 $40.000 $46.200 $50.000 $50.000 $60.000
RC PIPE (CL III)(24 IN)
LF 422.000 $65.000 $55.000 $78.750 $65.000 $85.000 $80.000
RC PIPE (CL III)(36 IN)
LF 36.000 $100.000 $130.000 $220.500 $120.000 $200.000 $150.000
WINGWALL (FW - 0) (HW=3 FT)
EA 2.000 $4,100.000 $3,800.000 $4,793.250 $4,500.000 $5,500.000 $2,500.000
WINGWALL (FW - 0) (HW=4 FT)
EA 2.000 $5,200.000 $2,500.000 $5,670.000 $6,000.000 $5,500.000 $3,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 60.000 $850.000 $600.000 $630.000 $610.000 $650.000 $700.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $900.000 $750.000 $819.000 $780.000 $750.000 $900.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 16.000 $1,000.000 $960.000 $998.550 $920.000 $950.000 $1,100.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $1,850.000 $2,700.000 $2,205.000 $2,000.000 $2,100.000 $3,500.000
CLEAN EXIST CULVERTS
EA 2.000 $400.000 $1,200.000 $525.000 $1,600.000 $450.000 $5,000.000
REMOV STR (PIPE)
EA 41.000 $180.000 $425.000 $252.000 $300.000 $230.000 $500.000
MOBILIZATION
LS 1.000 $170,000.000 $150,000.000 $149,000.000 $215,000.000 $200,000.000 $230,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $1,800.000 $2,300.000 $2,100.000 $2,500.000 $8,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 480.000 $30.000 $32.000 $31.000 $31.000 $35.000 $42.000
ROCK FILTER DAMS (REMOVE)
LF 480.000 $5.000 $8.000 $8.400 $8.400 $4.000 $20.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 100.000 $20.000 $32.500 $34.000 $34.000 $10.000 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 100.000 $8.500 $6.000 $6.300 $6.300 $2.000 $15.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 13,970.000 $3.000 $3.100 $3.000 $3.000 $2.500 $3.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 13,970.000 $1.000 $0.800 $0.800 $0.800 $0.300 $1.650
INTERSECTIONS (ACP)
SY 283.000 $50.000 $32.000 $24.400 $25.000 $28.000 $70.000
DRIVEWAYS (ACP)
SY 551.000 $40.000 $32.000 $20.780 $51.000 $28.000 $50.000
TURNOUTS (ACP)
SY 556.000 $40.000 $32.000 $45.500 $60.000 $35.000 $50.000
DRIVEWAYS (BASE)
SY 3,071.000 $35.000 $32.000 $20.780 $36.000 $22.000 $50.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $375.000 $520.000 $498.000 $500.000 $500.000 $550.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 14.000 $225.000 $215.000 $204.000 $205.000 $350.000 $375.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 5.000 $250.000 $225.000 $215.000 $215.000 $380.000 $420.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 7.000 $465.000 $435.000 $415.000 $415.000 $700.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $500.000 $590.000 $567.000 $570.000 $810.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 1.000 $595.000 $787.000 $750.000 $750.000 $1,300.000 $1,400.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 28.000 $285.000 $325.000 $310.000 $310.000 $500.000 $535.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 8.000 $300.000 $412.000 $394.000 $395.000 $550.000 $600.000
REMOVE SM RD SN SUP&AM
EA 45.000 $80.000 $82.000 $78.000 $80.000 $80.000 $150.000
INSTL DEL ASSN (OM-2Z)(FLX)(WAP)
EA 8.000 $90.000 $100.000 $100.000 $95.000 $110.000 $615.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 27,567.000 $1.000 $0.220 $0.160 $0.210 $0.200 $0.220
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,567.000 $1.000 $0.220 $0.160 $0.210 $0.200 $0.220
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,439.000 $1.000 $1.400 $1.000 $1.250 $1.000 $2.000
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 6,476.000 $1.000 $1.100 $1.000 $0.950 $0.600 $2.000
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
LF 28,066.000 $0.750 $0.630 $0.630 $0.600 $1.100 $0.650
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
LF 1,064.000 $0.750 $0.880 $0.890 $0.850 $2.100 $1.000
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
LF 27,438.000 $0.750 $0.630 $0.630 $0.600 $1.100 $0.650
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 90.000 $15.000 $16.500 $15.750 $15.750 $14.000 $20.000
REFL PAV MRKR TY II-A-A
EA 349.000 $3.000 $4.400 $5.250 $4.200 $4.000 $4.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,500.000 $10,000.000 $10,000.000 $9,800.000 $10,000.000 $15,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 386.000 $15.000 $8.800 $10.500 $8.400 $8.500 $10.000
TMA (STATIONARY)
EA 2.000 $10,000.000 $21,000.000 $2,000.000 $10,000.000 $10,000.000 $15,000.000
TMA (MOBILE OPERATION)
DAY 14.000 $240.000 $110.000 $52.500 $105.000 $300.000 $200.000
Totals: $2,054,935.300 $1,954,394.000 $2,065,653.394 $2,073,714.590 $2,183,435.100 $2,598,125.700