RUSK US0259 (6476-32-001)

Items: 47

County: RUSK
Length: 0.0100 MILES
Highway: US0259
District: TYLER
Control Number: 6476-32-001
DBE Goal: N/A
Project: RMC - A00212782
Guaranty: $13,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $656,924.00
Date: 03/11/2025 (1 year ago)
Contract Number: 3251007
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00212782
Project Description: REPAIR METAL BEAM GUARD RAIL FENCE IN VARIOUS LOCATIONS IN GREGG AND RUSK COUNTIES.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
2709 W FRONT ST, TYLER, TX 75702
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$656,924.00
1
$813,463.00
Over/Under Est: 23.83% $156,539.00

Bid Items & Bid Tabulations

47 Total 0 of 47
RUSK  |  US0259  |  TYLER  |  6476-32-001  |  03/11/2025  |  $656,924.00  |  RMC - A00212782  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CATOCON, INC.
REMOV CONC (RIPRAP)
SY 10.000 $40.000 $100.000
CONC STR REPAIR (STANDARD)
SF 25.000 $90.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $700.000 $600.000
MOBILIZATION (CALLOUT)
EA 80.000 $150.000 $100.000
TMA (STATIONARY)
DAY 90.000 $150.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $10.000 $40.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 15.000 $20.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 1.000 $500.000 $1,500.000
MTL BEAM GD FEN TRANS (T101)
EA 2.000 $500.000 $600.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 4,000.000 $1.000 $2.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 100.000 $2.000 $2.000
TRANSITION ADJUSTMENT
EA 1.000 $2.000 $1.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,200.000 $1,500.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 30.000 $24.000 $40.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 30.000 $35.000 $40.000
REMOVE METAL BEAM GUARD FENCE
LF 2,500.000 $1.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 60.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $1,500.000 $5,000.000
GUARDRAIL END TREATMENT (MOVE & RESET)
EA 1.000 $500.000 $1.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1.000 $1.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 5,600.000 $28.000 $32.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 15.000 $20.000 $100.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 5.000 $20.000 $500.000
REPLACE TIMBER POST W/O CONC FND
EA 500.000 $20.000 $39.000
REPLACE TIMBER POST W/ CONC FND
EA 150.000 $30.000 $43.000
REPLACE STEEL POST W/ CONC FND
EA 2.000 $100.000 $300.000
REALIGN POSTS
EA 400.000 $20.000 $10.000
REPLACE TERMINAL ANCHOR POSTS
EA 50.000 $1.000 $10.000
REM OBSOLETE GET & REPL W/ SGT
EA 85.000 $4,000.000 $4,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $900.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,200.000 $28.000 $38.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 75.000 $50.000 $100.000
REPLACE BLOCKOUT
EA 340.000 $10.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 15.000 $100.000 $300.000
RESET SGT IMPACT HEAD
EA 10.000 $1.000 $300.000
REPLACE SGT OBJECT MARKER
EA 50.000 $1.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 40.000 $1.000 $75.000
REPLACE SGT CABLE ASSEMBLY
EA 40.000 $1.000 $75.000
REPLACE SGT STRUT
EA 1.000 $1.000 $300.000
REPLACE HINGED TOP SGT POST (STEEL)
EA 2.000 $120.000 $1,000.000
REALIGN HINGED TOP SGT POST ((STEEL)
EA 2.000 $30.000 $1,000.000
REPLACE (NARROW QUAD)
EA 1.000 $500.000 $25,000.000
REPAIR (NARROW QUAD NOSE)
EA 3.000 $550.000 $1,500.000
REPAIR (NARROW QUAD BAY)
EA 8.000 $750.000 $1,500.000
REPAIR (T101)
LF 5.000 $120.000 $200.000
REPAIR (T6)
LF 5.000 $150.000 $300.000
REPAIR (STEEL POST W/CHANNEL IRON RAIL)
LF 85.000 $100.000 $40.000
Totals: $656,924.000 $813,463.000