PREPARING ROW
|
STA
|
16.500
|
$2,500.000
|
$8,545.000
|
$2,000.000
|
$4,500.000
|
$7,000.000
|
$7,050.000
|
$5,700.000
|
$8,000.000
|
|
|
DISPOSAL OF WATER WELLS
|
EA
|
1.000
|
$15,000.000
|
$500.000
|
$2,000.000
|
$3,800.000
|
$8,500.000
|
$4,500.000
|
$3,800.000
|
$5,000.000
|
|
|
REMOVE CONC (RAIL)
|
LF
|
20.000
|
$20.000
|
$189.000
|
$100.000
|
$55.000
|
$425.000
|
$30.000
|
$120.000
|
$30.000
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
2,312.000
|
$3.600
|
$3.750
|
$5.000
|
$6.600
|
$4.000
|
$8.500
|
$10.000
|
$6.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
320.000
|
$20.000
|
$15.000
|
$25.000
|
$14.000
|
$23.000
|
$13.000
|
$31.000
|
$20.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
537.970
|
$160.000
|
$100.000
|
$200.000
|
$205.000
|
$250.000
|
$270.000
|
$215.000
|
$450.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
468.000
|
$21.000
|
$15.000
|
$25.000
|
$20.000
|
$18.000
|
$15.000
|
$44.000
|
$30.000
|
|
|
BACKFILL (TY A)
|
STA
|
537.970
|
$191.000
|
$150.000
|
$200.000
|
$200.000
|
$230.000
|
$175.000
|
$245.000
|
$300.000
|
|
|
BLADING
|
STA
|
537.970
|
$77.000
|
$100.000
|
$75.000
|
$160.000
|
$160.000
|
$230.000
|
$165.000
|
$300.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
143,139.000
|
$1.250
|
$0.500
|
$1.000
|
$1.250
|
$0.600
|
$1.150
|
$0.600
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
239,667.000
|
$1.000
|
$1.010
|
$0.700
|
$0.930
|
$0.750
|
$0.670
|
$0.900
|
$0.850
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
119,297.000
|
$0.300
|
$0.740
|
$0.700
|
$0.750
|
$0.750
|
$0.650
|
$0.700
|
$0.770
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
119,297.000
|
$0.300
|
$0.740
|
$0.700
|
$0.750
|
$0.750
|
$0.650
|
$0.700
|
$0.770
|
|
|
VEGETATIVE WATERING
|
MG
|
5,775.000
|
$65.000
|
$1.000
|
$0.010
|
$2.000
|
$5.000
|
$0.010
|
$20.000
|
$8.000
|
|
|
FL BS (CMP IN PLACE)(TYA GR1-2)(IN VEH)
|
CY
|
3,414.000
|
$68.000
|
$62.000
|
$40.000
|
$65.000
|
$75.000
|
$21.000
|
$77.000
|
$80.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2) (6")
|
SY
|
150,207.000
|
$13.000
|
$14.710
|
$15.000
|
$14.000
|
$12.500
|
$16.000
|
$16.500
|
$17.000
|
|
|
REWORK BS MTL (TY C) (8") (ORD COMP)
|
SY
|
116,432.000
|
$2.000
|
$1.840
|
$2.000
|
$1.500
|
$2.000
|
$2.390
|
$1.850
|
$10.000
|
|
|
CEMENT
|
TON
|
2,700.000
|
$155.000
|
$139.000
|
$150.000
|
$185.000
|
$145.000
|
$155.000
|
$150.000
|
$165.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
163,020.000
|
$3.000
|
$1.500
|
$2.750
|
$1.500
|
$2.250
|
$2.200
|
$1.650
|
$2.000
|
|
|
ASPH (RC-250)
|
GAL
|
42,383.000
|
$4.000
|
$4.250
|
$3.500
|
$4.400
|
$3.000
|
$5.780
|
$3.850
|
$5.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
116,673.000
|
$3.500
|
$3.170
|
$3.250
|
$3.450
|
$3.750
|
$5.790
|
$3.650
|
$3.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,491.000
|
$162.000
|
$124.000
|
$100.000
|
$145.000
|
$160.000
|
$157.750
|
$160.000
|
$135.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
1,272.000
|
$109.000
|
$124.000
|
$100.000
|
$145.000
|
$170.000
|
$157.750
|
$135.000
|
$135.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
1,081.000
|
$105.000
|
$117.000
|
$100.000
|
$145.000
|
$165.000
|
$140.000
|
$157.000
|
$135.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22
|
TON
|
1,017.280
|
$150.000
|
$113.000
|
$115.000
|
$125.000
|
$110.000
|
$77.680
|
$125.000
|
$155.000
|
|
|
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
|
TON
|
261.690
|
$110.000
|
$129.000
|
$115.000
|
$130.000
|
$110.000
|
$77.680
|
$125.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
500.000
|
$65.000
|
$5.000
|
$50.000
|
$90.000
|
$65.000
|
$44.320
|
$95.000
|
$75.000
|
|
|
CUT & RESTORING PAV
|
SY
|
115.000
|
$115.000
|
$109.200
|
$50.000
|
$110.000
|
$110.000
|
$150.000
|
$105.000
|
$125.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
60.500
|
$301.000
|
$166.950
|
$250.000
|
$250.000
|
$150.000
|
$250.000
|
$263.000
|
$300.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
211.000
|
$7.000
|
$14.700
|
$10.000
|
$12.750
|
$7.500
|
$15.000
|
$8.400
|
$5.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,860.000
|
$45.000
|
$43.050
|
$35.000
|
$45.000
|
$45.000
|
$53.000
|
$37.000
|
$45.000
|
|
|
DRILLED SHAFT (12 IN)
|
LF
|
10.000
|
$160.000
|
$126.000
|
$100.000
|
$475.000
|
$110.000
|
$150.000
|
$135.000
|
$1,200.000
|
|
|
CL C CONC (HEADWALL)
|
CY
|
9.200
|
$1,500.000
|
$1,171.800
|
$1,000.000
|
$1,500.000
|
$1,100.000
|
$1,050.000
|
$1,600.000
|
$1,500.000
|
|
|
CL C CONC (WINGWALLS)
|
CY
|
20.000
|
$1,600.000
|
$2,047.500
|
$1,000.000
|
$1,225.000
|
$2,150.000
|
$1,000.000
|
$1,600.000
|
$1,500.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
36.000
|
$1,967.000
|
$315.000
|
$900.000
|
$925.000
|
$160.000
|
$600.000
|
$900.000
|
$1,000.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
60.000
|
$130.000
|
$109.200
|
$100.000
|
$48.000
|
$130.000
|
$275.000
|
$110.000
|
$150.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
1.300
|
$392.000
|
$668.850
|
$500.000
|
$2,000.000
|
$640.000
|
$550.000
|
$445.000
|
$1,500.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
37.200
|
$528.000
|
$493.500
|
$500.000
|
$470.000
|
$535.000
|
$500.000
|
$475.000
|
$500.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
5.000
|
$147.000
|
$186.900
|
$125.000
|
$325.000
|
$180.000
|
$150.000
|
$89.000
|
$250.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(24 IN)
|
CY
|
229.000
|
$90.000
|
$204.750
|
$125.000
|
$215.000
|
$215.000
|
$250.000
|
$210.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
69.000
|
$604.000
|
$462.000
|
$400.000
|
$495.000
|
$480.000
|
$500.000
|
$525.000
|
$500.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
240.000
|
$80.000
|
$151.200
|
$150.000
|
$160.000
|
$150.000
|
$139.350
|
$150.000
|
$220.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
29.000
|
$820.000
|
$346.500
|
$400.000
|
$815.000
|
$430.000
|
$475.000
|
$510.000
|
$500.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
10.000
|
$400.000
|
$672.000
|
$800.000
|
$820.000
|
$750.000
|
$550.000
|
$615.000
|
$500.000
|
|
|
CONC BOX CULV (8 FT X 8 FT)(EXTEND)
|
LF
|
21.000
|
$980.000
|
$957.600
|
$800.000
|
$950.000
|
$1,000.000
|
$950.000
|
$890.000
|
$800.000
|
|
|
CONC BOX CULV (4FT X 6FT)(EXTEND)
|
LF
|
14.000
|
$600.000
|
$836.850
|
$750.000
|
$650.000
|
$850.000
|
$575.000
|
$785.000
|
$800.000
|
|
|
CONC BOX CULV (5FT X 9FT)(EXTEND)
|
LF
|
10.000
|
$703.000
|
$1,019.550
|
$825.000
|
$910.000
|
$1,050.000
|
$750.000
|
$865.000
|
$800.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,711.000
|
$39.000
|
$49.350
|
$32.000
|
$40.000
|
$55.000
|
$50.000
|
$46.000
|
$40.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
510.000
|
$55.000
|
$78.750
|
$65.000
|
$50.000
|
$85.000
|
$65.000
|
$92.000
|
$50.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
20.000
|
$68.000
|
$115.500
|
$90.000
|
$95.000
|
$115.000
|
$75.000
|
$135.000
|
$70.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
48.000
|
$101.000
|
$154.350
|
$125.000
|
$110.000
|
$160.000
|
$95.000
|
$190.000
|
$115.000
|
|
|
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
|
EA
|
2.000
|
$3,187.000
|
$3,990.000
|
$2,000.000
|
$5,000.000
|
$3,750.000
|
$3,800.000
|
$4,000.000
|
$5,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
6.000
|
$3,849.000
|
$3,885.000
|
$4,500.000
|
$5,000.000
|
$3,900.000
|
$3,200.000
|
$3,150.000
|
$3,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
3.000
|
$3,000.000
|
$4,410.000
|
$5,500.000
|
$5,650.000
|
$4,700.000
|
$3,800.000
|
$3,700.000
|
$4,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
$5,151.000
|
$7,035.000
|
$6,500.000
|
$7,000.000
|
$7,200.000
|
$5,000.000
|
$4,700.000
|
$5,000.000
|
|
|
WINGWALL (PW - 2) (HW=10 FT)
|
EA
|
2.000
|
$26,000.000
|
$32,550.000
|
$23,000.000
|
$29,500.000
|
$31,000.000
|
$30,000.000
|
$34,000.000
|
$27,000.000
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
1.000
|
$30,000.000
|
$40,845.000
|
$25,000.000
|
$39,500.000
|
$39,600.000
|
$34,000.000
|
$48,000.000
|
$75,000.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
2.000
|
$7,000.000
|
$12,142.200
|
$12,000.000
|
$10,000.000
|
$12,850.000
|
$16,000.000
|
$16,000.000
|
$13,000.000
|
|
|
WINGWALL (PW - 2) (HW=7 FT)
|
EA
|
2.000
|
$8,000.000
|
$16,371.600
|
$13,500.000
|
$19,000.000
|
$17,400.000
|
$20,000.000
|
$19,000.000
|
$13,000.000
|
|
|
WINGWALL (PW - 2) (HW=8 FT)
|
EA
|
1.000
|
$13,833.000
|
$22,571.850
|
$16,000.000
|
$20,000.000
|
$21,400.000
|
$25,000.000
|
$21,000.000
|
$16,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$404.000
|
$630.000
|
$650.000
|
$555.000
|
$650.000
|
$550.000
|
$735.000
|
$500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
7.000
|
$730.000
|
$630.000
|
$650.000
|
$620.000
|
$750.000
|
$650.000
|
$785.000
|
$575.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
76.000
|
$610.000
|
$656.250
|
$650.000
|
$600.000
|
$670.000
|
$650.000
|
$735.000
|
$575.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$658.000
|
$840.000
|
$800.000
|
$755.000
|
$860.000
|
$750.000
|
$785.000
|
$700.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
4.000
|
$850.000
|
$997.500
|
$800.000
|
$950.000
|
$1,020.000
|
$1,000.000
|
$890.000
|
$900.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$847.000
|
$997.500
|
$800.000
|
$950.000
|
$1,020.000
|
$1,000.000
|
$890.000
|
$900.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$1,200.000
|
$1,785.000
|
$2,000.000
|
$1,650.000
|
$1,820.000
|
$2,500.000
|
$2,100.000
|
$1,600.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$2,800.000
|
$4,095.000
|
$4,500.000
|
$3,775.000
|
$4,180.000
|
$4,500.000
|
$3,700.000
|
$4,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
7.000
|
$1,500.000
|
$1,785.000
|
$1,000.000
|
$1,925.000
|
$1,600.000
|
$1,200.000
|
$1,050.000
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$32,000.000
|
$5,775.000
|
$1,000.000
|
$1,350.000
|
$5,900.000
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
46.000
|
$300.000
|
$262.500
|
$100.000
|
$350.000
|
$270.000
|
$250.000
|
$630.000
|
$450.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$507,253.000
|
$380,000.000
|
$790,000.000
|
$700,000.000
|
$770,000.000
|
$835,500.000
|
$1,390,000.000
|
$800,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$3,756.000
|
$2,178.000
|
$1,500.000
|
$1,950.000
|
$5,000.000
|
$6,480.000
|
$2,250.000
|
$15,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
2,520.000
|
$25.000
|
$32.550
|
$26.000
|
$35.750
|
$27.000
|
$28.000
|
$34.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
2,520.000
|
$10.000
|
$9.980
|
$5.000
|
$8.800
|
$8.500
|
$5.000
|
$8.400
|
$5.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
250.000
|
$20.000
|
$10.000
|
$25.000
|
$21.500
|
$30.000
|
$30.000
|
$24.000
|
$40.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$26.000
|
$75.000
|
$75.000
|
$125.000
|
$65.000
|
$75.000
|
$115.000
|
$125.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
8,400.000
|
$3.000
|
$2.750
|
$3.000
|
$3.150
|
$2.000
|
$2.650
|
$3.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
8,400.000
|
$1.000
|
$0.750
|
$1.000
|
$0.800
|
$0.500
|
$0.500
|
$0.800
|
$1.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
150.000
|
$125.000
|
$120.000
|
$75.000
|
$125.000
|
$85.000
|
$150.000
|
$145.000
|
$150.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$65.000
|
$142.110
|
$78.000
|
$115.000
|
$125.000
|
$85.000
|
$130.000
|
$150.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$10.000
|
$30.170
|
$11.000
|
$55.000
|
$25.000
|
$50.000
|
$16.000
|
$20.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
150.000
|
$20.000
|
$50.000
|
$20.000
|
$40.000
|
$50.000
|
$65.000
|
$30.000
|
$50.000
|
|
|
CONC CURB (TY II)
|
LF
|
27.000
|
$20.000
|
$94.500
|
$50.000
|
$90.000
|
$130.000
|
$50.000
|
$300.000
|
$50.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
2,458.000
|
$56.000
|
$35.000
|
$35.000
|
$28.000
|
$40.000
|
$14.540
|
$35.000
|
$35.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
9,084.000
|
$37.000
|
$32.500
|
$35.000
|
$29.250
|
$38.000
|
$14.620
|
$37.000
|
$28.000
|
|
|
TURNOUTS (ACP)
|
SY
|
882.000
|
$42.000
|
$29.870
|
$35.000
|
$28.000
|
$40.000
|
$14.610
|
$49.000
|
$35.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
332.000
|
$100.000
|
$115.500
|
$80.000
|
$105.000
|
$125.000
|
$131.000
|
$125.000
|
$115.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,125.000
|
$20.000
|
$22.050
|
$20.500
|
$23.000
|
$21.000
|
$19.600
|
$22.000
|
$23.000
|
|
|
MTL THRIE-BEAM GD FEN (TIM POST)
|
LF
|
4.000
|
$1,454.000
|
$1,428.000
|
$1,350.000
|
$1,500.000
|
$1,500.000
|
$1,400.000
|
$2,800.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
500.000
|
$4.300
|
$3.000
|
$4.000
|
$3.300
|
$4.000
|
$3.750
|
$8.000
|
$3.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$280.000
|
$200.000
|
$200.000
|
$275.000
|
$150.000
|
$140.000
|
$265.000
|
$300.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$2,198.000
|
$2,451.750
|
$2,500.000
|
$2,550.000
|
$2,700.000
|
$2,525.000
|
$2,500.000
|
$2,700.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$13,500.000
|
$15,300.000
|
$9,200.000
|
$9,500.000
|
$12,000.000
|
$7,975.000
|
$9,150.000
|
$11,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$2,500.000
|
$1,700.000
|
$2,500.000
|
$1,650.000
|
$2,000.000
|
$1,375.000
|
$1,600.000
|
$3,000.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,100.000
|
$1,350.000
|
$1,000.000
|
$990.000
|
$4,000.000
|
$775.000
|
$950.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
59.000
|
$400.000
|
$309.750
|
$150.000
|
$325.000
|
$250.000
|
$165.000
|
$310.000
|
$400.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
12.000
|
$165.000
|
$341.250
|
$225.000
|
$360.000
|
$350.000
|
$210.000
|
$340.000
|
$425.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
$375.000
|
$446.250
|
$350.000
|
$470.000
|
$430.000
|
$465.000
|
$445.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$550.000
|
$481.950
|
$550.000
|
$505.000
|
$600.000
|
$545.000
|
$480.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
5.000
|
$570.000
|
$567.000
|
$600.000
|
$595.000
|
$700.000
|
$610.000
|
$565.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P-BM)
|
EA
|
2.000
|
$668.000
|
$866.250
|
$750.000
|
$900.000
|
$940.000
|
$1,110.000
|
$865.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
5.000
|
$923.000
|
$882.000
|
$850.000
|
$925.000
|
$1,000.000
|
$1,077.000
|
$880.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
56.000
|
$304.000
|
$341.250
|
$350.000
|
$360.000
|
$450.000
|
$240.000
|
$340.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
1.000
|
$555.000
|
$393.750
|
$450.000
|
$415.000
|
$500.000
|
$349.000
|
$395.000
|
$600.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
67.000
|
$81.000
|
$105.000
|
$100.000
|
$110.000
|
$75.000
|
$82.000
|
$75.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$28.000
|
$15.750
|
$25.000
|
$16.500
|
$30.000
|
$28.000
|
$16.000
|
$50.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
97.000
|
$53.000
|
$47.250
|
$35.000
|
$50.000
|
$70.000
|
$60.000
|
$47.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
30.000
|
$37.000
|
$28.880
|
$25.000
|
$30.250
|
$36.000
|
$33.500
|
$29.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
106,335.000
|
$0.300
|
$0.110
|
$0.100
|
$0.110
|
$0.110
|
$0.100
|
$0.110
|
$0.120
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
5,360.000
|
$0.200
|
$0.160
|
$0.150
|
$0.170
|
$0.160
|
$0.150
|
$0.160
|
$0.200
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
192,416.000
|
$0.200
|
$0.160
|
$0.120
|
$0.130
|
$0.130
|
$0.120
|
$0.130
|
$0.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
11,000.000
|
$0.900
|
$1.000
|
$1.000
|
$1.200
|
$0.450
|
$0.880
|
$1.200
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
321.000
|
$3.500
|
$5.570
|
$5.300
|
$5.850
|
$5.670
|
$5.300
|
$5.600
|
$6.000
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
106,355.000
|
$0.300
|
$0.740
|
$0.700
|
$0.770
|
$0.750
|
$0.700
|
$0.750
|
$0.770
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
2,680.000
|
$0.400
|
$1.580
|
$1.500
|
$1.650
|
$1.610
|
$1.500
|
$1.600
|
$1.600
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
96,208.000
|
$0.300
|
$0.740
|
$0.700
|
$0.770
|
$0.750
|
$0.700
|
$0.750
|
$0.770
|
|
REFL PAV MRKR TY I-A
|
EA
|
128.000
|
$2.100
|
$3.470
|
$3.300
|
$3.650
|
$3.530
|
$3.300
|
$3.450
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,352.000
|
$2.100
|
$3.470
|
$3.300
|
$3.650
|
$3.530
|
$3.300
|
$3.450
|
$4.000
|
|
|
FLOATING TURBIDITY BARRIER(FUR & INST)
|
LF
|
200.000
|
$44.000
|
$52.000
|
$19.000
|
$65.000
|
$40.000
|
$39.090
|
$52.000
|
$60.000
|
|
|
FLOATING TURBIDITY BARRIER (REMOVE)
|
LF
|
200.000
|
$20.000
|
$3.000
|
$5.000
|
$12.000
|
$20.000
|
$10.970
|
$1.000
|
$10.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
42.000
|
$98.000
|
$50.000
|
$75.000
|
$100.000
|
$600.000
|
$250.000
|
$105.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$11,000.000
|
$5,000.000
|
$20,000.000
|
$20,000.000
|
$20,000.000
|
$28,000.000
|
$35,000.000
|
$50,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$200.000
|
$105.000
|
$100.000
|
$110.000
|
$600.000
|
$450.000
|
$105.000
|
$100.000
|
|
Totals: |
$8,332,688.510
|
$7,676,966.970
|
$7,945,209.820
|
$8,312,450.800
|
$8,459,951.450
|
$8,895,408.110
|
$9,654,202.480
|
$10,718,663.840
|