PREPARING ROW
|
STA
|
11.000
|
$5,000.000
|
$8,944.000
|
$3,000.000
|
$220,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,277.000
|
$25.000
|
$35.750
|
$70.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
75.000
|
$30.000
|
$219.060
|
$60.000
|
$150.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
2,104.000
|
$20.000
|
$43.630
|
$60.000
|
$30.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
662.000
|
$250.000
|
$168.010
|
$380.000
|
$250.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
20,452.000
|
$2.000
|
$2.950
|
$5.000
|
$5.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
14,306.000
|
$0.300
|
$0.550
|
$0.520
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,054.000
|
$0.300
|
$0.550
|
$0.520
|
$1.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,054.000
|
$0.300
|
$0.550
|
$0.520
|
$1.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
AC
|
182.000
|
$1,000.000
|
$1,098.900
|
$1,050.000
|
$1,050.000
|
|
|
VEGETATIVE WATERING
|
MG
|
347.000
|
$12.000
|
$56.010
|
$50.000
|
$55.100
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
19,327.000
|
$1.900
|
$1.420
|
$1.400
|
$2.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
545.000
|
$2.100
|
$3.300
|
$3.400
|
$3.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(10")
|
SY
|
4,779.000
|
$15.000
|
$31.800
|
$40.000
|
$25.000
|
|
|
FL BS (CMP IN PLACE) (TY D GR 1-2)(10")
|
SY
|
3,345.000
|
$80.000
|
$37.780
|
$40.000
|
$25.000
|
|
|
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
|
TON
|
100.000
|
$240.000
|
$374.240
|
$385.000
|
$400.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
4,779.000
|
$5.000
|
$17.720
|
$10.000
|
$15.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
670.000
|
$6.500
|
$10.380
|
$15.000
|
$8.000
|
|
|
PRIME COAT(MC-30 OR AE-P)
|
GAL
|
911.000
|
$5.000
|
$8.970
|
$15.000
|
$8.000
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
2,220.000
|
$6.500
|
$6.290
|
$8.000
|
$6.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
21,334.000
|
$7.060
|
$8.970
|
$8.000
|
$6.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,803.000
|
$225.000
|
$189.180
|
$260.000
|
$175.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
1,685.000
|
$6.000
|
$8.350
|
$7.000
|
$6.000
|
|
|
ASPH (AC-20-5TR OR AC-20XP)
|
GAL
|
127,630.000
|
$3.930
|
$4.970
|
$6.000
|
$6.000
|
|
|
LRA PAV TY-I GR-C
|
TON
|
523.000
|
$100.000
|
$198.670
|
$360.000
|
$150.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
8,820.000
|
$5.000
|
$6.290
|
$5.000
|
$5.000
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
12,934.000
|
$5.000
|
$5.900
|
$7.500
|
$5.000
|
|
|
CEM STABIL BKFL
|
CY
|
112.000
|
$300.000
|
$363.000
|
$360.000
|
$500.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
350.000
|
$300.000
|
$458.700
|
$460.000
|
$400.400
|
|
|
CL C CONC (ABUT)
|
CY
|
54.200
|
$1,500.000
|
$1,446.500
|
$1,320.000
|
$2,000.000
|
|
|
CL C CONC (CURB)
|
CY
|
4.000
|
$450.000
|
$5,632.530
|
$1,400.000
|
$2,000.000
|
|
|
REINF CONC SLAB (BOX BEAM)
|
SF
|
5,290.000
|
$16.000
|
$35.750
|
$33.000
|
$35.000
|
|
|
APPROACH SLAB
|
CY
|
70.600
|
$750.000
|
$1,045.000
|
$1,000.000
|
$2,000.000
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
1,593.000
|
$25.000
|
$170.500
|
$165.000
|
$50.000
|
|
|
PRESTR CONC BOX BEAM (5B40)
|
LF
|
1,030.500
|
$338.000
|
$528.000
|
$600.000
|
$600.000
|
|
|
RIPRAP (CONC)(CL B)(RR8&RR9)
|
CY
|
77.000
|
$415.000
|
$709.500
|
$700.000
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
282.000
|
$500.000
|
$715.000
|
$1,300.000
|
$800.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
270.000
|
$115.000
|
$159.500
|
$160.000
|
$120.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
424.000
|
$225.000
|
$247.500
|
$220.000
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
90.000
|
$200.000
|
$302.500
|
$300.000
|
$250.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)
|
LF
|
66.000
|
$975.000
|
$2,200.000
|
$2,100.000
|
$950.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
66.000
|
$91.000
|
$544.500
|
$500.000
|
$100.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$70,331.000
|
$65,000.000
|
$1,000,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$2,014,513.000
|
$1,500,000.000
|
$2,350,000.000
|
$2,600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
30.000
|
$8,000.000
|
$24,698.000
|
$71,500.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$42.000
|
$62.080
|
$54.000
|
$50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
32.000
|
$130.000
|
$127.380
|
$105.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
232.000
|
$20.500
|
$36.700
|
$26.000
|
$30.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
224.000
|
$30.500
|
$47.130
|
$40.000
|
$45.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
224.000
|
$7.750
|
$43.530
|
$10.000
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
11,268.000
|
$5.600
|
$5.750
|
$4.600
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,268.000
|
$1.200
|
$2.720
|
$1.000
|
$1.500
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,060.000
|
$5.000
|
$8.160
|
$9.100
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,060.000
|
$2.000
|
$1.960
|
$1.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS (EBSS)
|
SY
|
3,172.000
|
$20.000
|
$25.990
|
$16.000
|
$100.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
24.000
|
$6,000.000
|
$4,514.400
|
$5,000.000
|
$3,200.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
3,270.000
|
$30.000
|
$105.710
|
$90.000
|
$70.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
3,270.000
|
$15.000
|
$20.900
|
$30.000
|
$25.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
3,686.000
|
$50.000
|
$121.350
|
$80.000
|
$70.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
125,511.000
|
$0.250
|
$0.110
|
$0.270
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
61,568.000
|
$0.250
|
$0.110
|
$0.370
|
$0.400
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
2,200.000
|
$35.000
|
$37.130
|
$32.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,300.000
|
$3,867.010
|
$2,400.000
|
$2,800.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
506.000
|
$72.000
|
$60.500
|
$90.000
|
$55.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,500.000
|
$3.610
|
$3.300
|
$2.100
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
28.000
|
$3,100.000
|
$3,685.000
|
$3,200.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
20.000
|
$250.000
|
$330.000
|
$280.000
|
$300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
4.000
|
$870.000
|
$1,585.240
|
$1,200.000
|
$1,250.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
4.000
|
$10,000.000
|
$13,188.640
|
$11,000.000
|
$7,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
3.000
|
$800.000
|
$935.000
|
$940.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$700.000
|
$1,045.000
|
$1,100.000
|
$950.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT)
|
EA
|
1.000
|
$1,100.000
|
$687.500
|
$690.000
|
$625.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
47.000
|
$45.000
|
$33.000
|
$25.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$30.000
|
$33.000
|
$26.000
|
$30.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
3,139.000
|
$1.000
|
$1.650
|
$1.000
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
96.000
|
$5.000
|
$12.100
|
$12.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,960.000
|
$1.000
|
$1.930
|
$2.000
|
$1.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
24.000
|
$10.000
|
$27.500
|
$28.000
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
3,840.000
|
$1.000
|
$1.930
|
$2.000
|
$1.750
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
120.000
|
$5.500
|
$10.450
|
$1.000
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,941.000
|
$1.630
|
$6.390
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
5,161.000
|
$1.000
|
$0.610
|
$0.620
|
$0.550
|
|
REFL PAV MRK TY II (Y) 6" (SLD)
|
LF
|
8,170.000
|
$1.000
|
$0.610
|
$0.620
|
$0.550
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
214.000
|
$0.750
|
$5.500
|
$5.600
|
$5.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
134,486.000
|
$0.750
|
$0.690
|
$0.700
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
3,227.000
|
$0.750
|
$0.830
|
$0.850
|
$0.750
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
43,253.000
|
$0.750
|
$0.690
|
$0.700
|
$0.630
|
|
RE PM W/RET REQ TY II (W) 6" (BRK)
|
LF
|
214.000
|
$0.250
|
$5.500
|
$5.600
|
$5.000
|
|
RE PM W/RET REQ TY II (W) 6" (SLD)
|
LF
|
129,325.000
|
$0.250
|
$0.250
|
$0.300
|
$0.230
|
|
RE PM W/RET REQ TY II (Y) 6" (BRK)
|
LF
|
3,227.000
|
$0.250
|
$0.550
|
$0.850
|
$0.500
|
|
RE PM W/RET REQ TY II (Y) 6" (SLD)
|
LF
|
35,083.000
|
$0.250
|
$0.240
|
$0.250
|
$0.220
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
292.000
|
$2.100
|
$22.000
|
$25.000
|
$20.000
|
|
PREFAB PAV MRK TY B (W)(36")(YLD TRI)
|
EA
|
14.000
|
$35.000
|
$110.000
|
$105.000
|
$100.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
11.000
|
$6.150
|
$22.000
|
$25.000
|
$20.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
926.000
|
$3.680
|
$4.950
|
$5.000
|
$4.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
4,439.000
|
$1.000
|
$1.710
|
$1.700
|
$1.550
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
8,886.000
|
$1.000
|
$0.830
|
$0.850
|
$0.750
|
|
|
FULL - WIDTH MOWING
|
AC
|
229.000
|
$45.000
|
$150.660
|
$145.000
|
$75.000
|
|
|
LITTER REMOVAL
|
AC
|
229.000
|
$100.000
|
$122.390
|
$60.000
|
$50.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
146,084.000
|
$15.000
|
$2.700
|
$2.000
|
$1.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
46,274.000
|
$145.000
|
$142.040
|
$146.000
|
$140.000
|
|
|
TACK COAT
|
GAL
|
27,277.000
|
$5.000
|
$6.430
|
$5.000
|
$6.000
|
|
|
CEMENT
|
TON
|
1,188.000
|
$388.000
|
$424.570
|
$250.000
|
$300.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
3,091.000
|
$1,250.370
|
$911.560
|
$800.000
|
$725.000
|
|
|
FOAMED ASPHALT TREAT (8") (DC)
|
SY
|
304,663.000
|
$4.800
|
$5.500
|
$6.800
|
$10.000
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
2.000
|
$500.000
|
$550.000
|
$600.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
852.000
|
$70.000
|
$142.570
|
$100.000
|
$90.000
|
|
|
TMA (STATIONARY)
|
DAY
|
344.000
|
$155.000
|
$250.000
|
$200.000
|
$320.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
308.000
|
$155.000
|
$250.000
|
$10.000
|
$950.000
|
|
Totals: |
$22,151,442.770
|
$21,350,244.520
|
$23,896,190.280
|
$26,586,451.030
|