Job Info for 0650-03-036

County: RUNNELS Highway: SH 153 Date: 09/07/2023 (1 year ago) Engineer's Estimate: $22,151,443 Control Number: 0650-03-036
Project: F 2B23(225) District: SAN ANGELO Time: 460 WORKING DAYS Type: REHABILITATE EXISTING ROADWAY / BRIDGE REPLACEMENT
HCS
Pay Estimates: 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10
Plans: Vol 1 | Vol 2 | Proposal

Bidders

Name Total Amount Place Over/Under Est Amt Left From Low Bid Delta Between Bidders
Engineer's Estimate $22,151,442.77
RK HALL, LLC   $21,350,244.52 1
-3.62% | -$801,198.25
A. L. HELMCAMP, INC.   $23,896,190.28 2
7.88% | $1,744,747.51
11.92% | $2,545,945.76
GILVIN-TERRILL, LTD.   $26,586,451.03 3
20.02% | $4,435,008.26
24.53% | $5,236,206.51
11.26% | $2,690,260.75
Subcontractor Percentage Amount
COPPELL CONSTRUCTION CO., INC. 8.09% $1,727,234.78
HJC FARMS, INC. 2.70% $576,456.60
J. H. ODEN CONTRACTING COMPANY 1.55% $330,928.79
TRP CONSTRUCTION GROUP, LLC 0.95% $202,827.32
CONTRACTORS SERVICE, LTD. 0.66% $140,911.61
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.46% $98,211.12
DUSTROL, INC. 0.18% $38,430.44
SURFACE PREPARATION TECHNOLOGIES, LLC 0.11% $23,485.27
PENHALL COMPANY 0.02% $4,270.05
TORO BRAVO CONSTRUCTION, LLC 0.02% $4,270.05
Total: 14.74% $3,147,026.03

Bid Items

Items: 109, 0 filtered
RUNNELS SH 153  |  SAN ANGELO  |  0650-03-036  |  09/07/2023  |  $22,151,443  |  F 2B23(225)  |  REHAB EXIST ROADWAY / BRIDGE REPL  |  460 WORKING DAYS
Item code Description Unit Quantity Engineer's Estimate RK HALL, LLC A. L. HELMCAMP, INC. GILVIN-TERRILL, LTD.
100 6002 PREPARING ROW STA 11.000 $5,000.000 $8,944.000 $3,000.000 $220,000.000
110 6001 EXCAVATION (ROADWAY) CY 2,277.000 $25.000 $35.750 $70.000 $30.000
132 6001 EMBANKMENT (FINAL)(ORD COMP)(TY A) CY 75.000 $30.000 $219.060 $60.000 $150.000
132 6003 EMBANKMENT (FINAL)(ORD COMP)(TY B) CY 2,104.000 $20.000 $43.630 $60.000 $30.000
134 6004 BACKFILL (TY A OR B) STA 662.000 $250.000 $168.010 $380.000 $250.000
160 6003 FURNISHING AND PLACING TOPSOIL (4") SY 20,452.000 $2.000 $2.950 $5.000 $5.000
164 6003 BROADCAST SEED (PERM) (RURAL) (CLAY) SY 14,306.000 $0.300 $0.550 $0.520 $1.000
164 6009 BROADCAST SEED (TEMP) (WARM) SY 3,054.000 $0.300 $0.550 $0.520 $1.000
164 6011 BROADCAST SEED (TEMP) (COOL) SY 3,054.000 $0.300 $0.550 $0.520 $1.000
164 6036 DRILL SEEDING (PERM) (RURAL) (CLAY) AC 182.000 $1,000.000 $1,098.900 $1,050.000 $1,050.000
168 6001 VEGETATIVE WATERING MG 347.000 $12.000 $56.010 $50.000 $55.100
169 6001 SOIL RETENTION BLANKETS (CL 1) (TY A) SY 19,327.000 $1.900 $1.420 $1.400 $2.000
169 6005 SOIL RETENTION BLANKETS (CL 2) (TY E) SY 545.000 $2.100 $3.300 $3.400 $3.000
247 6231 FL BS (CMP IN PLACE)(TY A GR 1-2)(10") SY 4,779.000 $15.000 $31.800 $40.000 $25.000
247 6304 FL BS (CMP IN PLACE) (TY D GR 1-2)(10") SY 3,345.000 $80.000 $37.780 $40.000 $25.000
260 6012 LIME(HYD,COM OR QK)(SLRY)OR QK(DRY) TON 100.000 $240.000 $374.240 $385.000 $400.000
260 6073 LIME TRT (SUBGRADE)(8") SY 4,779.000 $5.000 $17.720 $10.000 $15.000
310 6009 PRIME COAT (MC-30) GAL 670.000 $6.500 $10.380 $15.000 $8.000
310 6027 PRIME COAT(MC-30 OR AE-P) GAL 911.000 $5.000 $8.970 $15.000 $8.000
314 6009 EMULS ASPH (EROSN CONT)(MULTI) GAL 2,220.000 $6.500 $6.290 $8.000 $6.000
315 6004 FOG SEAL (CSS-1H) GAL 21,334.000 $7.060 $8.970 $8.000 $6.000
316 6224 AGGR(TY-PB GR-4 SAC-B) CY 2,803.000 $225.000 $189.180 $260.000 $175.000
316 6400 ASPH (AC-15P OR AC-10-2TR OR CRS-2P) GAL 1,685.000 $6.000 $8.350 $7.000 $6.000
316 6405 ASPH (AC-20-5TR OR AC-20XP) GAL 127,630.000 $3.930 $4.970 $6.000 $6.000
330 6004 LRA PAV TY-I GR-C TON 523.000 $100.000 $198.670 $360.000 $150.000
354 6021 PLANE ASPH CONC PAV(0" TO 2") SY 8,820.000 $5.000 $6.290 $5.000 $5.000
354 6022 PLANE ASPH CONC PAV(0" TO 3") SY 12,934.000 $5.000 $5.900 $7.500 $5.000
400 6005 CEM STABIL BKFL CY 112.000 $300.000 $363.000 $360.000 $500.000
416 6004 DRILL SHAFT (36 IN) LF 350.000 $300.000 $458.700 $460.000 $400.400
420 6013 CL C CONC (ABUT) CY 54.200 $1,500.000 $1,446.500 $1,320.000 $2,000.000
420 6141 CL C CONC (CURB) CY 4.000 $450.000 $5,632.530 $1,400.000 $2,000.000
422 6005 REINF CONC SLAB (BOX BEAM) SF 5,290.000 $16.000 $35.750 $33.000 $35.000
422 6015 APPROACH SLAB CY 70.600 $750.000 $1,045.000 $1,000.000 $2,000.000
423 6003 RETAINING WALL (TEMP WALL) SF 1,593.000 $25.000 $170.500 $165.000 $50.000
425 6008 PRESTR CONC BOX BEAM (5B40) LF 1,030.500 $338.000 $528.000 $600.000 $600.000
432 6008 RIPRAP (CONC)(CL B)(RR8&RR9) CY 77.000 $415.000 $709.500 $700.000 $1,000.000
432 6045 RIPRAP (MOW STRIP)(4 IN) CY 282.000 $500.000 $715.000 $1,300.000 $800.000
450 6054 RAIL (TY SSTR) (W/DRAIN SLOTS) LF 270.000 $115.000 $159.500 $160.000 $120.000
451 6004 RETROFIT RAIL (TY T131RC) LF 424.000 $225.000 $247.500 $220.000 $250.000
454 6018 SEALED EXPANSION JOINT (4 IN) (SEJ - M) LF 90.000 $200.000 $302.500 $300.000 $250.000
462 6016 CONC BOX CULV (7 FT X 5 FT) LF 66.000 $975.000 $2,200.000 $2,100.000 $950.000
496 6008 REMOV STR (BOX CULVERT) LF 66.000 $91.000 $544.500 $500.000 $100.000
496 6010 REMOV STR (BRIDGE 100 - 499 FT LENGTH) EA 1.000 $75,000.000 $70,331.000 $65,000.000 $1,000,000.000
500 6001 MOBILIZATION LS 1.000 $2,014,513.000 $1,500,000.000 $2,350,000.000 $2,600,000.000
502 6001 BARRICADES, SIGNS AND TRAFFIC HANDLING MO 30.000 $8,000.000 $24,698.000 $71,500.000 $50,000.000
506 6002 ROCK FILTER DAMS (INSTALL) (TY 2) LF 200.000 $42.000 $62.080 $54.000 $50.000
506 6003 ROCK FILTER DAMS (INSTALL) (TY 3) LF 32.000 $130.000 $127.380 $105.000 $100.000
506 6011 ROCK FILTER DAMS (REMOVE) LF 232.000 $20.500 $36.700 $26.000 $30.000
506 6020 CONSTRUCTION EXITS (INSTALL) (TY 1) SY 224.000 $30.500 $47.130 $40.000 $45.000
506 6024 CONSTRUCTION EXITS (REMOVE) SY 224.000 $7.750 $43.530 $10.000 $10.000
506 6038 TEMP SEDMT CONT FENCE (INSTALL) LF 11,268.000 $5.600 $5.750 $4.600 $5.000
506 6039 TEMP SEDMT CONT FENCE (REMOVE) LF 1,268.000 $1.200 $2.720 $1.000 $1.500
506 6041 BIODEG EROSN CONT LOGS (INSTL) (12") LF 3,060.000 $5.000 $8.160 $9.100 $10.000
506 6043 BIODEG EROSN CONT LOGS (REMOVE) LF 3,060.000 $2.000 $1.960 $1.000 $1.000
508 6002 CONSTRUCTING DETOURS (EBSS) SY 3,172.000 $20.000 $25.990 $16.000 $100.000
510 6003 ONE-WAY TRAF CONT (PORT TRAF SIG) MO 24.000 $6,000.000 $4,514.400 $5,000.000 $3,200.000
512 6005 PORT CTB (FUR & INST)(F-SHAPE)(TY 1) LF 3,270.000 $30.000 $105.710 $90.000 $70.000
512 6053 PORT CTB (REMOVE)(F-SHAPE)(TY 1) LF 3,270.000 $15.000 $20.900 $30.000 $25.000
530 6006 DRIVEWAYS (SURF TREAT) SY 3,686.000 $50.000 $121.350 $80.000 $70.000
533 6001 RUMBLE STRIPS (SHOULDER) LF 125,511.000 $0.250 $0.110 $0.270 $0.300
533 6002 RUMBLE STRIPS (CENTERLINE) LF 61,568.000 $0.250 $0.110 $0.370 $0.400
540 6002 MTL W-BEAM GD FEN (STEEL POST) LF 2,200.000 $35.000 $37.130 $32.000 $35.000
540 6006 MTL BEAM GD FEN TRANS (THRIE-BEAM) EA 8.000 $2,300.000 $3,867.010 $2,400.000 $2,800.000
540 6020 MTL W - BEAM GD FEN (LOW FILL CULVERT) LF 506.000 $72.000 $60.500 $90.000 $55.000
542 6001 REMOVE METAL BEAM GUARD FENCE LF 2,500.000 $3.610 $3.300 $2.100 $3.000
544 6001 GUARDRAIL END TREATMENT (INSTALL) EA 28.000 $3,100.000 $3,685.000 $3,200.000 $3,500.000
544 6003 GUARDRAIL END TREATMENT (REMOVE) EA 20.000 $250.000 $330.000 $280.000 $300.000
545 6005 CRASH CUSH ATTEN (REMOVE) EA 4.000 $870.000 $1,585.240 $1,200.000 $1,250.000
545 6019 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3) EA 4.000 $10,000.000 $13,188.640 $11,000.000 $7,000.000
644 6001 IN SM RD SN SUP&AM TY10BWG(1)SA(P) EA 3.000 $800.000 $935.000 $940.000 $850.000
644 6004 IN SM RD SN SUP&AM TY10BWG(1)SA(T) EA 2.000 $700.000 $1,045.000 $1,100.000 $950.000
644 6031 IN SM RD SN SUP&AM TYS80(1)SA(T-2EXT) EA 1.000 $1,100.000 $687.500 $690.000 $625.000
658 6061 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2 EA 47.000 $45.000 $33.000 $25.000 $30.000
658 6062 INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI) EA 22.000 $30.000 $33.000 $26.000 $30.000
662 6004 WK ZN PAV MRK NON-REMOV (W)4"(SLD) LF 3,139.000 $1.000 $1.650 $1.000 $1.500
662 6050 WK ZN PAV MRK REMOV (REFL) TY II-A-A EA 96.000 $5.000 $12.100 $12.000 $11.000
662 6063 WK ZN PAV MRK REMOV (W)4"(SLD) LF 1,960.000 $1.000 $1.930 $2.000 $1.750
662 6075 WK ZN PAV MRK REMOV (W)24"(SLD) LF 24.000 $10.000 $27.500 $28.000 $25.000
662 6095 WK ZN PAV MRK REMOV (Y)4"(SLD) LF 3,840.000 $1.000 $1.930 $2.000 $1.750
662 6109 WK ZN PAV MRK SHT TERM (TAB)TY W EA 120.000 $5.500 $10.450 $1.000 $2.000
662 6111 WK ZN PAV MRK SHT TERM (TAB)TY Y-2 EA 4,941.000 $1.630 $6.390 $1.000 $2.000
666 6174 REFL PAV MRK TY II (W) 6" (SLD) LF 5,161.000 $1.000 $0.610 $0.620 $0.550
666 6210 REFL PAV MRK TY II (Y) 6" (SLD) LF 8,170.000 $1.000 $0.610 $0.620 $0.550
666 6306 RE PM W/RET REQ TY I (W)6"(BRK)(100MIL) LF 214.000 $0.750 $5.500 $5.600 $5.000
666 6309 RE PM W/RET REQ TY I (W)6"(SLD)(100MIL) LF 134,486.000 $0.750 $0.690 $0.700 $0.630
666 6318 RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL) LF 3,227.000 $0.750 $0.830 $0.850 $0.750
666 6321 RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL) LF 43,253.000 $0.750 $0.690 $0.700 $0.630
666 6324 RE PM W/RET REQ TY II (W) 6" (BRK) LF 214.000 $0.250 $5.500 $5.600 $5.000
666 6325 RE PM W/RET REQ TY II (W) 6" (SLD) LF 129,325.000 $0.250 $0.250 $0.300 $0.230
666 6328 RE PM W/RET REQ TY II (Y) 6" (BRK) LF 3,227.000 $0.250 $0.550 $0.850 $0.500
666 6329 RE PM W/RET REQ TY II (Y) 6" (SLD) LF 35,083.000 $0.250 $0.240 $0.250 $0.220
668 6018 PREFAB PAV MRK TY B (W)(24")(SLD) LF 292.000 $2.100 $22.000 $25.000 $20.000
668 6034 PREFAB PAV MRK TY B (W)(36")(YLD TRI) EA 14.000 $35.000 $110.000 $105.000 $100.000
672 6007 REFL PAV MRKR TY I-C EA 11.000 $6.150 $22.000 $25.000 $20.000
672 6009 REFL PAV MRKR TY II-A-A EA 926.000 $3.680 $4.950 $5.000 $4.500
677 6001 ELIM EXT PAV MRK & MRKS (4") LF 4,439.000 $1.000 $1.710 $1.700 $1.550
678 6002 PAV SURF PREP FOR MRK (6") LF 8,886.000 $1.000 $0.830 $0.850 $0.750
730 6002 FULL - WIDTH MOWING AC 229.000 $45.000 $150.660 $145.000 $75.000
734 6001 LITTER REMOVAL AC 229.000 $100.000 $122.390 $60.000 $50.000
760 6001 DITCH CLEANING AND RESHAPING (FOOT) LF 146,084.000 $15.000 $2.700 $2.000 $1.000
3077 6023 SP MIXES SP-C SAC-B PG70-22 TON 46,274.000 $145.000 $142.040 $146.000 $140.000
3077 6075 TACK COAT GAL 27,277.000 $5.000 $6.430 $5.000 $6.000
3088 6001 CEMENT TON 1,188.000 $388.000 $424.570 $250.000 $300.000
3088 6002 ASPHALT BINDER (PG 64-22) TON 3,091.000 $1,250.370 $911.560 $800.000 $725.000
3088 6007 FOAMED ASPHALT TREAT (8") (DC) SY 304,663.000 $4.800 $5.500 $6.800 $10.000
4171 6001 INSTALL BRIDGE IDENTIFICATION NUMBERS EA 2.000 $500.000 $550.000 $600.000 $5,000.000
6001 6001 PORTABLE CHANGEABLE MESSAGE SIGN DAY 852.000 $70.000 $142.570 $100.000 $90.000
6185 6002 TMA (STATIONARY) DAY 344.000 $155.000 $250.000 $200.000 $320.000
6185 6005 TMA (MOBILE OPERATION) DAY 308.000 $155.000 $250.000 $10.000 $950.000
Totals: $22,151,442.77 $21,350,244.52 $23,896,190.28 $26,586,451.03