Show Job Controls
Bid Cobra

RUNNELS US 83 (0035-01-035)

Items: 46

County: RUNNELS
Length: N/A
Highway: US 83
District: SAN ANGELO
Control Number: 0035-01-035
DBE Goal: N/A
Project: STP 2019(830)HES
Guaranty: N/A
Time: 276 WORKING DAYS
Engineer's Estimate: $2,387,845.41
Date: 05/07/2019 (7 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$2,387,845.41
1
$3,077,658.58
Over/Under Est: 28.89% $689,813.17
Over/Under Est: 70.83% $1,691,319.54
Amt Left: 32.54% $1,001,506.37

Bid Items & Bid Tabulations

46 Total 0 of 46
RUNNELS  |  US 83  |  SAN ANGELO  |  0035-01-035  |  05/07/2019  |  $2,387,845.41  |  STP 2019(830)HES  |  SAFETY TREAT FIXED OBJECTS  |  276 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
SCR CIVIL CONSTRUCTION, LLC
REMOVING CONC (RIPRAP)
SY 119.000 $10.000 $40.000 $185.000
EMBANKMENT (VEHICLE)(ORD COMP)(TY A)
CY 581.000 $10.400 $60.000 $126.000
FURNISHING AND PLACING TOPSOIL (3")
SY 1,315.000 $1.000 $25.000 $29.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,315.000 $0.180 $10.000 $1.000
LRA PAV TY-I GR-D
TON 58.800 $114.000 $250.000 $975.000
CL C CONC (RAIL FOUNDATION)
CY 161.300 $900.000 $1,350.000 $3,150.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 37.000 $180.000 $150.000 $600.000
RIPRAP (CONC)(4 IN)
CY 12.800 $450.000 $640.480 $1,500.000
RIPRAP (CONC)(5 IN)
CY 140.400 $450.000 $644.400 $900.000
RIPRAP (MOW STRIP)(4 IN)
CY 61.600 $1,600.000 $698.500 $1,500.000
RAIL (TY SSTR)
LF 202.000 $160.000 $170.000 $270.000
RETROFIT RAIL (TY SSTR)
LF 2,047.760 $160.000 $150.000 $280.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1) (C)
EA 6.000 $6,200.000 $6,250.000 $16,200.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
EA 4.000 $5,700.000 $5,750.000 $16,200.000
SET (TY I)(S= 6 FT)(HW= 8 FT)(3:1) (C)
EA 8.000 $7,300.000 $8,500.000 $16,100.000
SET (TY I)(S= 7 FT)(HW= 4 FT)(3:1) (C)
EA 18.000 $5,000.000 $6,500.000 $10,600.000
SET (TY I)(S= 7 FT)(HW= 5 FT)(3:1) (C)
EA 6.000 $4,000.000 $7,250.000 $17,100.000
CLEAN EXIST CULVERTS
EA 1.000 $1,400.000 $2,750.000 $18,200.000
MOBILIZATION
LS 1.000 $180,000.000 $250,000.000 $285,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $6,500.000 $15,000.000 $9,000.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 347.000 $4.000 $11.200 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 347.000 $1.000 $5.740 $2.250
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
LF 720.000 $45.000 $175.000 $110.000
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 3,060.000 $12.000 $25.000 $52.000
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 720.000 $5.000 $15.000 $80.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 146.000 $180.000 $290.000 $400.000
MTL W-BEAM GD FEN (STEEL POST)
LF 14,938.960 $25.000 $30.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 54.000 $1,950.000 $2,100.000 $1,735.000
MTL BEAM GD FEN TRANS (TL2)
EA 1.000 $980.000 $1,100.000 $950.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $1,130.000 $1,600.000 $1,175.000
MTL BM GD FEN TRANS (NON - SYM)
EA 2.000 $950.000 $850.000 $760.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 794.440 $62.500 $75.000 $75.000
MTL BM GD FEN (LONG SPAN SYSTEM)
EA 12.000 $1,020.000 $1,750.000 $1,345.000
REMOVE METAL BEAM GUARD FENCE
LF 13,671.700 $2.500 $3.000 $2.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $260.000 $185.000 $170.000
GUARDRAIL END TREATMENT (INSTALL)
EA 113.000 $2,575.000 $3,250.000 $2,630.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 40.000 $1,350.000 $1,750.000 $1,000.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,050.000 $1,700.000 $2,000.000
CRASH CUSH ATTEN (INSTL)(R)(N)(TL3)
EA 1.000 $11,500.000 $30,000.000 $33,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $7,500.000 $6,500.000 $10,000.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 5.000 $420.000 $950.000 $1,300.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 51.000 $22.000 $30.000 $23.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 22.000 $93.580 $75.000 $67.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 275.000 $24.000 $30.000 $25.000
TREE TRIMMING (12"-24")
EA 5.000 $150.000 $1,500.000 $1,200.000
TMA (STATIONARY)
DAY 666.000 $150.000 $60.000 $150.000
Totals: $2,387,845.410 $3,077,658.584 $4,079,164.950